Fixed, TEST, Thu Apr 11 00:38:13 2019, OttoH.V., OTHER, Hardware, N/A, HVM_ERROR
|
*** hvm watcher error ***
FP_DC2_w2 Slot: 2 (A1821HMP) Channel:3 Vmon: 674.75 V Imon: 0.002 uA Status: OVER CURRENT
|
Fixed, TEST, Thu Apr 11 00:40:33 2019, OttoH.V., OTHER, Hardware, N/A, HVM_ERROR
|
*** hvm watcher error ***
FP_DC2_w2 Slot: 2 (A1821HMP) Channel:3 Vmon: 8 V Imon: 0 uA Status: INTERNAL TRIP
|
Fixed, TEST, Thu Apr 11 00:57:07 2019, OttoH.V., OTHER, Hardware, N/A, HVM_ERROR
|
*** hvm watcher error ***
FP_CATS3 Slot: 2 (A1821HMP) Channel:9 Vmon: 559.5 V Imon: 0.035 uA Status: OVER CURRENT
|
Fixed, e744s, Thu Apr 11 00:57:34 2019, iulian, OTHER, Hardware, CH2, CH2 target thickness
|
target CH2 104 um (2nd position)
Brho 14N6+ CATS2 |
Fixed, TEST, Thu Apr 11 00:57:58 2019, OttoH.V., OTHER, Hardware, N/A, HVM_ERROR
|
*** hvm watcher error ***
FP_CATS4 Slot: 2 (A1821HMP) Channel:10 Vmon: 524.5 V Imon: 0.94 uA Status: OVER CURRENT
|
Fixed, TEST, Thu Apr 11 00:58:05 2019, OttoH.V., OTHER, Hardware, N/A, HVM_ERROR
|
*** hvm watcher error ***
FP_CATS3 Slot: 2 (A1821HMP) Channel:9 Vmon: 53 V Imon: 0 uA Status: INTERNAL TRIP
|
Fixed, e744s, Thu Apr 11 01:00:46 2019, OttoRun, RUN, General, CH2, Run60
|
*************************
Run : 60
*************************
Start at 2019-04-11 00:59:35.983897
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 100 um (Position 3)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam
Vamos IC10 placed in IC12 electronics
|
Fixed, e744s, Thu Apr 11 01:05:35 2019, OttoRun, RUN, General, CH2, Run61
|
*************************
Run : 61
*************************
Start at 2019-04-11 01:04:59.561319
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 100 um (Position 3)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Same as run 60 after DAQ NARVAL crash. (broken link 102 ???)
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam
Vamos IC10 placed in IC12 electronics
|
Fixed, e744s, Thu Apr 11 01:09:05 2019, OttoRun, RUN, General, CH2, Run62
|
*************************
Run : 62
*************************
Start at 2019-04-11 01:08:38.422386
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 100 um (Position 3)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Same as run 60 after DAQ NARVAL crash. (DC not sending Data, Kill Narval on ganp507 and vamosng)
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam
Vamos IC10 placed in IC12 electronics
|
Fixed, e744s, Thu Apr 11 01:16:30 2019, OttoRun, RUN, General, CH2, Run63
|
*************************
Run : 63
*************************
Start at 2019-04-11 01:16:17.572487
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 100 um (Position 3)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Same as run 60 after DAQ NARVAL crash. (DC not sending Data, Kill Narval on ganp507 and vamosng)
AGAIN After Crash
|
Fixed, TEST, Thu Apr 11 01:16:38 2019, OttoH.V., OTHER, Hardware, N/A, HVM_ERROR
|
*** hvm watcher error ***
FP_CATS3 Slot: 2 (A1821HMP) Channel:9 Vmon: 0 V Imon: 0 uA Status: INTERNAL TRIP
FP_CATS4 Slot: 2 (A1821HMP) Channel:10 Vmon: 0 V Imon: 0.06 uA Status: INTERNAL TRIP
|
Fixed, e744s, Thu Apr 11 01:21:39 2019, OttoRun, RUN, General, CH2, Run64
|
*************************
Run : 64
*************************
Start at 2019-04-11 01:21:02.741720
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 100 um (Position 3)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Data OK for Reference Target Thickness measurement
Same as run 60 after DAQ NARVAL crash. (DC not sending Data, Kill Narval on ganp507 and vamosng)
AGAIN After Crash CRASH in NUMEXO 63 - BI STORAGE error
(01:22:48 - 11/04/2019) FATAL - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : requested size too high available in actor 1024 requested in header 5376 do not use this actor
(01:22:48 - 11/04/2019) FATAL - log from NARVAL.NUMEXO2_61 - NUMEXO2_61 put sub system NARVAL in error with message :Bloc_Catcher.T_Communication : actor buffer size too small
(01:22:48 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : BlC : exception,STORAGE_ERROR,s-intman.adb:136 explicit raise
(01:22:48 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : BPR2 : exception,STORAGE_ERROR,s-intman.adb:136 explicit raise
(01:22:48 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : BPR ,STORAGE_ERROR,s-intman.adb:136 explicit raise
(01:22:48 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : exception ,STORAGE_ERROR,s-intman.adb:136 explicit raise
|
Fixed, e744s, Thu Apr 11 01:37:57 2019, OttoRun, RUN, General, CH2, Run65
|
*************************
Run : 65
*************************
Start at 2019-04-11 01:37:16.190996
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: C 73 um (Position 4)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Changed target to C 73 um |
Fixed, e744s, Thu Apr 11 01:48:40 2019, OttoRun, RUN, General, Carbon, Run66
|
*************************
Run : 66
*************************
Start at 2019-04-11 01:48:23.997955
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: C 73 um (Position 4)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Changed target to C 73 um
Stop at 2019-04-11 01:58:13.528779
Stop comment: |
Fixed, TEST, Thu Apr 11 01:56:59 2019, OttoH.V., OTHER, Hardware, N/A, HVM_ERROR
|
*** hvm watcher error ***
FP_DC2_w2 Slot: 2 (A1821HMP) Channel:3 Vmon: 672.5 V Imon: 0.065 uA Status: OVER CURRENT
|
Fixed, TEST, Thu Apr 11 01:59:19 2019, OttoH.V., OTHER, Hardware, N/A, HVM_ERROR
|
*** hvm watcher error ***
FP_DC2_w2 Slot: 2 (A1821HMP) Channel:3 Vmon: 9.25 V Imon: 0 uA Status: INTERNAL TRIP
|
Fixed, e744s, Thu Apr 11 02:09:12 2019, OttoRun, RUN, General, CH2, Run67
|
*************************
Run : 67
*************************
Start at 2019-04-11 02:08:39.018915
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 73 um (Position 5)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Changed target to CH2 73 um
Stop at 2019-04-11 02:13:21.475620
Stop comment: |
Fixed, e744s, Thu Apr 11 02:12:42 2019, François, TARGET, General, , Measured target thicknesses
|
CATS2
Incident beam 14N7+ Brho 0.79 Tm
Brho (6+) measured after CATS2 = 0.9148 Tm => energy = 7.38627 MeV/u
Measured = 3.97 µm mylar + 20 mm gas
N°2 CH2 104 µm
= 9.67 mg/cm2 (polyethylene density = 0.93 g/cm3) Georges@2018
Measured :
Brho(6+) = 0.7473 Tm => E=4.9355 MeV/u => e=109.7 µm
Brho(5+) = 0.8924 Tm => E=4.8874 MeV/u => e=111.5 µm
Measured e=110.6 µm
N°3 CH2 100 µm Goodfellow (polyethylene)
Measured Brho(6+)=0.7754 Tm => E=5.3126 MeV/u
Measured e= 95 µm
N°4 Carbon 75 µm
=> 6.75 < thick < 9.75 mg/cm2 (Graphite flexible, density 0,9-1,3 g/cm3) Goodfellow
measured Brho(6+)=0.811 Tm (very broad) => E=5.81006 MeV/u
Measured e=8.4 mg/cm2
N°5 CH2 73 µm Georges@2019
N°6 CH2 104 µm Georges@2019 |
Fixed, e744s, Thu Apr 11 02:25:06 2019, iulian, RUN, General, CH2, target thicknesses measurement Online
|
Online measurement of the target thickness:
Run 58
Cats2 in -> Brho 14N7+=0.9148 Tm
Run 59
Cats2 in
CH2 target place 2 in
-> Brho 14N6+=0.7473 Tm
Thickness found 105.2 um
Run 60
Cats2 in
CH2 target place 3 in
-> Brho 14N6+=0.7754 Tm
-> Brho 14N5+=0.8924 Tm
Thickness found 91 um
Run 61
Cats2 in
C target place 4 in
-> Brho 14N6+=0.8118 Tm
Thickness foun 35.85
Run 62
Cats2 in
CH2 target place 5 in
-> Brho 14N6+=0.8023 Tm
Thickness found 76.2 um |
Fixed, e744s, Thu Apr 11 02:33:36 2019, OttoRun, RUN, General, CH2, Run68
|
*************************
Run : 68
*************************
Start at 2019-04-11 02:32:44.283818
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 105 um (Position 2)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.64050 Tm
- CATS 2 IN
Comment:
Changed target to CH2 105 um (position 2)
Stop at 2019-04-11 02:52:50.791709
Stop comment: |
|