Fixede744s Fri Apr 12 22:00:42 2019 DiegoTARGETGeneral very different target thickness
Attachment 1: Very_different_target_thickness.png
Very_different_target_thickness.png
Fixede744s Tue Apr 16 12:44:22 2019 Marion, DieterBEAMGeneralCarbonventilation problem CSS2 12:43
ventilation problem CSS2 12:43

Beam back at 13h24 (see scaler attached)
Attachment 1: run134_scaler_afterbeamrestart_13h26.png
run134_scaler_afterbeamrestart_13h26.png
Fixede793s Fri Mar 12 23:16:16 2021 julien, nishuRUNHardwareCD2vamos count rate goes down to 0 once again
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:.
Attachment 1: IMG20210312231358.jpg
IMG20210312231358.jpg
Attachment 2: IMG20210312230429.jpg
IMG20210312230429.jpg
Fixede744s Tue Apr 16 11:39:40 2019 ValerianOFFLINESoftwareCH2two proton kinematics and center of mass reconstruction with all stat
Attachment 1: All_stat_2p.png
All_stat_2p.png
Fixed  Sun Jul 21 16:51:30 2019 Marlène, Christian, KseniaBEAMGeneral trial of tracking of the implantation of 15O
Looking at AGATA count rate, we have seen that the highest counting rate for 511 keV line is seen in the inner ring (0*A clusters).
The outer ring detectors (10B for example) counts 10 times less.

Our conclusion is that the beam is partly implanted at the entrance of MUGAST chamber.
The outer ring probably sees the implantation on MUST2 masks.

A more refined analysis is needed to backtrack where the 15O are implanted.
FixedTEST Sun Feb 23 22:17:49 2020 MarleneRUNHardware tracetek error
When filling the coolers with alcohol the tracetek cable triggered and switched off water and supplies.
Beam is off
Fixede744s Mon Apr 8 18:47:54 2019 iulianOTHERHardwareN/Atodo to do list for Tuesday and 14N beam todo list
To do list

- Id plots with Vamos
- Prepare Agata Or - HFpropre and Agata 52 – HFpropre for beam intensity monitoring.
- Check the E_Agata inside Mugast acq why is not working
- Check that Or Agata is divided only when goes to trigger not before fan-in fan out
- Obtain the E_Agata spectra and T_Agata_HF spectra in the acq (ckeck ADC entry ok)
- Solve the MM3 EY problems
- Understand Vamos (40% efficency) (advances, the finger cuts 20%, the other 20 % might be due to the beam time structure) and Agata efficiency (5% efficiency Agata instead of 10%) (seams that maximum efficiency is 8%-9%, despite having 10 % for Eu source) for 2H(16O,p)17O
- write a document about starting the acq from scratch
- Prepare the Vigru pages for Vamos & Mugast to be checked by the peoples in Shifts
- Prepare the similar online check list for Agata

- Add Beam Blocker into the acq scalers
Attachment 1: e744s.pdf
e744s.pdf e744s.pdf e744s.pdf e744s.pdf e744s.pdf e744s.pdf e744s.pdf
Attachment 2: E744_14N.pdf
E744_14N.pdf
Fixede744s Tue Apr 16 19:50:20 2019 iulian valerian francois sylvan OTHERGeneralN/Atodo list after beam time
0) Heating the electronics of MUGAST
1) Calibration 3a with pedestals (10 min)
2) Calibration 3a 24 h
2b) Make the electronics drawing (with a lot of pictures). Include TAC ranges and measure delays
3) Calimero (time calibration of MUGAST)
4) TAC calibration (MUGAST + VAMOS)
5) Vamos ?!
Fixede793s Fri Mar 12 15:52:15 2021 AdrienRUNGeneralN/Ato do during run
Every 1-2h:

Online: take screen shot of
  • Impact Matrix (MM and MG)
  • E-TOF (MM and MG)
  • E-DE (MM and MG)
  • Raw Tac
  • MW TDC
  • Scaler

Check the Vamos Q and D value on the left computer in the VAMOS daq ROOM (next to inspection line)
Fixedcom2019 Sat Apr 6 10:57:35 2019 NicolasOFFLINESoftwareCD2time of flight v.s. energy in MUGAST (run 256, all stat)
Attachment 1: ToF_dE_MUGAST_run256_all_stat.pdf
ToF_dE_MUGAST_run256_all_stat.pdf
Fixede768s Thu Jul 18 14:38:04 2019 mugastGRITGeneralN/Atime calibrator for MG10 X
Here is the plot
Attachment 1: TAC_MUGAST_HF_StripByStrip_MG10_20190718.png
TAC_MUGAST_HF_StripByStrip_MG10_20190718.png
Attachment 2: calibT_StripByStrip_MG10_20190718.png
calibT_StripByStrip_MG10_20190718.png
FixedTEST Thu Mar 7 14:02:03 2019 Marlène IulianMUST2GeneralN/Atest of MUST2 electronics
Test with pulser at 20 kHz
The OR of MUVI was scaled down by a factor of 100, to provoke some resets
FixedTEST Fri Feb 22 14:36:35 2019 iulianMUST2Hardware3-alphatest new cable for Must2 detectors. Cables OK!
Cables put on Muvi3.
Testing procedure. Use the numbered cables to conect the annular detector (MG11) and check if ok: GECO writting on MUVI3 , ORD Present, DECS present, STOP present.
Couldn't check the spectra as they do not exist.

MUVI3

Entry 1Entry 2Entry 3Entry 4
Cable 1Cable 2Cable 3Cable 4
GECO writting OKOKOKOK
ORD Present OKOKOKOK
DECS Present NONONONO
STOP Present OKOKOKOK
Fixede744s Sat Apr 13 11:44:21 2019 Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaHBEAMGeneralCH2tempory beam interruption
ventilation problem SPIRAL& - beam stopped for presumably appro. 10 min (PCP info)

beam is back at 11:52 h
Fixed  Mon Apr 8 08:01:04 2019 iulianMUST2Hardware swiching off HV & BT (in that order)
switching off HV & BT now :
>lpcgrit
>hvm_print MUST2
> hvm_group HV-CsI off
>hvm_group HV-Si off
>hvm_group BTMG-A off
>hvm_group BTMG-B off
>hvm_print MUST2
>hvm_print VAMOS
Attachment 1: HV_mugast_end1.png
HV_mugast_end1.png
Attachment 2: HV_mugast_end2.png
HV_mugast_end2.png
Attachment 3: HV_mugast_end3.png
HV_mugast_end3.png
Attachment 4: HV_mugast_end4.png
HV_mugast_end4.png
Fixede768s Wed Jul 17 08:00:34 2019 FrancoisBEAMGeneralLiFsummary of the night
0h-2H : beam tuning
2H Qpole down
4H Qpole problem solved but AGATA GGP problem
5H30 merging of AGATA-VAMOS = problem with numexo2 vamos DC...
7H45 solved, it was not numexo2, some soft problem
Ongoing  Sat Jul 20 09:32:02 2019 Kseniia, Christian, Nikola,OTHERGeneral summary of the morning shift
timeline of run 116

09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
10:30 resync AGATA crustal 13C, AGATA was in back-preassure for ~3 min
10:40 run 116 stopped (PCP called, they have a problem with primary beam high intensity reader, they called in the on-call people)
Fixede793s Tue Mar 16 06:08:02 2021 Lynda, Cyril, NishuRUNGeneralCD2summary of run#63 @06:00hrs
we had seen sufficient decrements in the beam current from time to time in the last few hours, everything else is going smooth so far..
Attachment 1: Screenshot_from_2021-03-16_06-13-27.png
Screenshot_from_2021-03-16_06-13-27.png
Attachment 2: Screenshot_from_2021-03-16_06-12-57.png
Screenshot_from_2021-03-16_06-12-57.png
Attachment 3: Screenshot_from_2021-03-16_06-12-05.png
Screenshot_from_2021-03-16_06-12-05.png
Attachment 4: Screenshot_from_2021-03-16_06-11-48.png
Screenshot_from_2021-03-16_06-11-48.png
Attachment 5: Screenshot_from_2021-03-16_06-11-32.png
Screenshot_from_2021-03-16_06-11-32.png
Attachment 6: Screenshot_from_2021-03-16_06-11-12.png
Screenshot_from_2021-03-16_06-11-12.png
Attachment 7: Screenshot_from_2021-03-16_06-10-59.png
Screenshot_from_2021-03-16_06-10-59.png
Attachment 8: Screenshot_from_2021-03-16_06-10-46.png
Screenshot_from_2021-03-16_06-10-46.png
Attachment 9: Screenshot_from_2021-03-16_06-10-34.png
Screenshot_from_2021-03-16_06-10-34.png
Attachment 10: Screenshot_from_2021-03-16_06-09-56.png
Screenshot_from_2021-03-16_06-09-56.png
Fixede793s Sun Mar 14 22:01:04 2021 Miguel, Wilton, Ablaihan,nishuRUNGeneralCD2summary of run 62@22:00hrs
Attachment 1: Screenshot_from_2021-03-14_22-03-45.png
Screenshot_from_2021-03-14_22-03-45.png
Attachment 2: Screenshot_from_2021-03-14_22-03-31.png
Screenshot_from_2021-03-14_22-03-31.png
Attachment 3: Screenshot_from_2021-03-14_22-03-19.png
Screenshot_from_2021-03-14_22-03-19.png
Attachment 4: Screenshot_from_2021-03-14_22-03-01.png
Screenshot_from_2021-03-14_22-03-01.png
Attachment 5: Screenshot_from_2021-03-14_22-02-49.png
Screenshot_from_2021-03-14_22-02-49.png
Attachment 6: Screenshot_from_2021-03-14_22-02-20.png
Screenshot_from_2021-03-14_22-02-20.png
Attachment 7: Screenshot_from_2021-03-14_22-02-06.png
Screenshot_from_2021-03-14_22-02-06.png
Attachment 8: Screenshot_from_2021-03-14_22-08-49.png
Screenshot_from_2021-03-14_22-08-49.png
Attachment 9: Screenshot_from_2021-03-14_22-02-34.png
Screenshot_from_2021-03-14_22-02-34.png
Fixede793s Fri Mar 12 20:54:30 2021 mugastRUNGeneralCD2summary of run 61
Attachment 1: scalers.png
scalers.png
Attachment 2: vamos.png
vamos.png
Attachment 3: Screenshot_from_2021-03-12_20-57-53.png
Screenshot_from_2021-03-12_20-57-53.png
Attachment 4: Screenshot_from_2021-03-12_20-58-15.png
Screenshot_from_2021-03-12_20-58-15.png
Attachment 5: Screenshot_from_2021-03-12_20-58-45.png
Screenshot_from_2021-03-12_20-58-45.png

ELOG Home Page