MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 1 of 132  Not logged in MUGAST
Fixed, e744s, Fri Apr 12 22:00:42 2019, Diego, TARGET, General, , very different target thickness Very_different_target_thickness.png
Fixed, e744s, Tue Apr 16 12:44:22 2019, Marion, Dieter, BEAM, General, Carbon, ventilation problem CSS2 12:43  run134_scaler_afterbeamrestart_13h26.png
ventilation problem CSS2 12:43

Beam back at 13h24 (see scaler attached)
Fixed, e793s, Fri Mar 12 23:16:16 2021, julien, nishu, RUN, Hardware, CD2, vamos count rate goes down to 0 once again IMG20210312231358.jpgIMG20210312230429.jpg
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:.
Fixed, e744s, Tue Apr 16 11:39:40 2019, Valerian, OFFLINE, Software, CH2, two proton kinematics and center of mass reconstruction with all stat All_stat_2p.png
Fixed, , Sun Jul 21 16:51:30 2019, Marlène, Christian, Ksenia, BEAM, General, , trial of tracking of the implantation of 15O 
Looking at AGATA count rate, we have seen that the highest counting rate for 511 keV line is seen in the inner ring (0*A clusters).
The outer ring detectors (10B for example) counts 10 times less.

Our conclusion is that the beam is partly implanted at the entrance of MUGAST chamber.
The outer ring probably sees the implantation on MUST2 masks.

A more refined analysis is needed to backtrack where the 15O are implanted.
Fixed, TEST, Sun Feb 23 22:17:49 2020, Marlene, RUN, Hardware, , tracetek error 
When filling the coolers with alcohol the tracetek cable triggered and switched off water and supplies.
Beam is off
Fixed, e744s, Mon Apr 8 18:47:54 2019, iulian, OTHER, Hardware, N/A, todo to do list for Tuesday and 14N beam todo list e744s.pdfE744_14N.pdf
To do list

- Id plots with Vamos
- Prepare Agata Or - HFpropre and Agata 52 – HFpropre for beam intensity monitoring.
- Check the E_Agata inside Mugast acq why is not working
- Check that Or Agata is divided only when goes to trigger not before fan-in fan out
- Obtain the E_Agata spectra and T_Agata_HF spectra in the acq (ckeck ADC entry ok)
- Solve the MM3 EY problems
- Understand Vamos (40% efficency) (advances, the finger cuts 20%, the other 20 % might be due to the beam time structure) and Agata efficiency (5% efficiency Agata instead of 10%) (seams that maximum efficiency is 8%-9%, despite having 10 % for Eu source) for 2H(16O,p)17O
- write a document about starting the acq from scratch
- Prepare the Vigru pages for Vamos & Mugast to be checked by the peoples in Shifts
- Prepare the similar online check list for Agata

- Add Beam Blocker into the acq scalers
Fixed, e744s, Tue Apr 16 19:50:20 2019, iulian valerian francois sylvan , OTHER, General, N/A, todo list after beam time 
0) Heating the electronics of MUGAST
1) Calibration 3a with pedestals (10 min)
2) Calibration 3a 24 h
2b) Make the electronics drawing (with a lot of pictures). Include TAC ranges and measure delays
3) Calimero (time calibration of MUGAST)
4) TAC calibration (MUGAST + VAMOS)
5) Vamos ?!
Fixed, e793s, Fri Mar 12 15:52:15 2021, Adrien, RUN, General, N/A, to do during run 
Every 1-2h:

Online: take screen shot of
  • Impact Matrix (MM and MG)
  • E-TOF (MM and MG)
  • E-DE (MM and MG)
  • Raw Tac
  • MW TDC
  • Scaler

Check the Vamos Q and D value on the left computer in the VAMOS daq ROOM (next to inspection line)
Fixed, com2019, Sat Apr 6 10:57:35 2019, Nicolas, OFFLINE, Software, CD2, time of flight v.s. energy in MUGAST (run 256, all stat) ToF_dE_MUGAST_run256_all_stat.pdf
Fixed, e768s, Thu Jul 18 14:38:04 2019, mugast, GRIT, General, N/A, time calibrator for MG10 X TAC_MUGAST_HF_StripByStrip_MG10_20190718.pngcalibT_StripByStrip_MG10_20190718.png
Here is the plot
Fixed, TEST, Thu Mar 7 14:02:03 2019, Marlène Iulian, MUST2, General, N/A, test of MUST2 electronics  
Test with pulser at 20 kHz
The OR of MUVI was scaled down by a factor of 100, to provoke some resets
Fixed, TEST, Fri Feb 22 14:36:35 2019, iulian, MUST2, Hardware, 3-alpha, test new cable for Must2 detectors. Cables OK! 
Cables put on Muvi3.
Testing procedure. Use the numbered cables to conect the annular detector (MG11) and check if ok: GECO writting on MUVI3 , ORD Present, DECS present, STOP present.
Couldn't check the spectra as they do not exist.

MUVI3

Entry 1Entry 2Entry 3Entry 4
Cable 1Cable 2Cable 3Cable 4
GECO writting OKOKOKOK
ORD Present OKOKOKOK
DECS Present NONONONO
STOP Present OKOKOKOK
Fixed, e744s, Sat Apr 13 11:44:21 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, General, CH2, tempory beam interruption 
ventilation problem SPIRAL& - beam stopped for presumably appro. 10 min (PCP info)

beam is back at 11:52 h
Fixed, , Mon Apr 8 08:01:04 2019, iulian, MUST2, Hardware, , swiching off HV & BT (in that order) HV_mugast_end1.pngHV_mugast_end2.pngHV_mugast_end3.pngHV_mugast_end4.png
switching off HV & BT now :
>lpcgrit
>hvm_print MUST2
> hvm_group HV-CsI off
>hvm_group HV-Si off
>hvm_group BTMG-A off
>hvm_group BTMG-B off
>hvm_print MUST2
>hvm_print VAMOS
Fixed, e768s, Wed Jul 17 08:00:34 2019, Francois, BEAM, General, LiF, summary of the night 
0h-2H : beam tuning
2H Qpole down
4H Qpole problem solved but AGATA GGP problem
5H30 merging of AGATA-VAMOS = problem with numexo2 vamos DC...
7H45 solved, it was not numexo2, some soft problem
Ongoing, , Sat Jul 20 09:32:02 2019, Kseniia, Christian, Nikola,, OTHER, General, , summary of the morning shift 
timeline of run 116

09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
10:30 resync AGATA crustal 13C, AGATA was in back-preassure for ~3 min
10:40 run 116 stopped (PCP called, they have a problem with primary beam high intensity reader, they called in the on-call people)
Fixed, e793s, Tue Mar 16 06:08:02 2021, Lynda, Cyril, Nishu, RUN, General, CD2, summary of run#63 @06:00hrs 10x
we had seen sufficient decrements in the beam current from time to time in the last few hours, everything else is going smooth so far..
Fixed, e793s, Sun Mar 14 22:01:04 2021, Miguel, Wilton, Ablaihan,nishu, RUN, General, CD2, summary of run 62@22:00hrs 9x
Fixed, e793s, Fri Mar 12 20:54:30 2021, mugast, RUN, General, CD2, summary of run 61 scalers.pngvamos.pngScreenshot_from_2021-03-12_20-57-53.pngScreenshot_from_2021-03-12_20-58-15.pngScreenshot_from_2021-03-12_20-58-45.png

ELOG Home Page