MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 1 of 132  Not logged in MUGAST
Fixed, e744s, Fri Apr 12 22:00:42 2019, Diego, TARGET, General, , very different target thickness Very_different_target_thickness.png
 
Fixed, e744s, Tue Apr 16 12:44:22 2019, Marion, Dieter, BEAM, General, Carbon, ventilation problem CSS2 12:43  run134_scaler_afterbeamrestart_13h26.png
ventilation problem CSS2 12:43 

Beam back at 13h24 (see scaler attached)
Fixed, e793s, Fri Mar 12 23:16:16 2021, julien, nishu, RUN, Hardware, CD2, vamos count rate goes down to 0 once again IMG20210312231358.jpgIMG20210312230429.jpg
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:.
Fixed, e744s, Tue Apr 16 11:39:40 2019, Valerian, OFFLINE, Software, CH2, two proton kinematics and center of mass reconstruction with all stat All_stat_2p.png
 
Fixed, , Sun Jul 21 16:51:30 2019, Marlène, Christian, Ksenia, BEAM, General, , trial of tracking of the implantation of 15O 
Looking at AGATA count rate, we have seen that the highest counting rate for 511 keV line is seen in the inner ring (0*A clusters).
The outer ring detectors (10B for example) counts 10 times less.
Fixed, TEST, Sun Feb 23 22:17:49 2020, Marlene, RUN, Hardware, , tracetek error 
When filling the coolers with alcohol the tracetek cable triggered and switched off water and supplies.
Beam is off
Fixed, e744s, Mon Apr 8 18:47:54 2019, iulian, OTHER, Hardware, N/A, todo to do list for Tuesday and 14N beam todo list e744s.pdfE744_14N.pdf
To do list

- [COLOR=red]Id plots with Vamos[/COLOR]
Fixed, e744s, Tue Apr 16 19:50:20 2019, iulian valerian francois sylvan , OTHER, General, N/A, todo list after beam time 
0)  Heating the electronics of MUGAST
1)  Calibration 3a with pedestals (10 min)
2)  Calibration 3a 24 h
Fixed, e793s, Fri Mar 12 15:52:15 2021, Adrien, RUN, General, N/A, to do during run 
[B]Every 1-2h:[/B]

[B]Online: take screen shot of[/B]
Fixed, com2019, Sat Apr 6 10:57:35 2019, Nicolas, OFFLINE, Software, CD2, time of flight v.s. energy in MUGAST (run 256, all stat) ToF_dE_MUGAST_run256_all_stat.pdf
 
Fixed, e768s, Thu Jul 18 14:38:04 2019, mugast, GRIT, General, N/A, time calibrator for MG10 X TAC_MUGAST_HF_StripByStrip_MG10_20190718.pngcalibT_StripByStrip_MG10_20190718.png
Here is the plot 
Fixed, TEST, Thu Mar 7 14:02:03 2019, Marlène Iulian, MUST2, General, N/A, test of MUST2 electronics  
Test with pulser at 20 kHz
The OR of MUVI was scaled down by a factor of 100, to provoke some resets
Fixed, TEST, Fri Feb 22 14:36:35 2019, iulian, MUST2, Hardware, 3-alpha, test new cable for Must2 detectors. Cables OK! 
Cables put on Muvi3.
Testing procedure. Use the numbered cables to conect the annular detector (MG11) and check if ok: GECO writting on MUVI3 , ORD Present, DECS present, STOP
present.
Fixed, e744s, Sat Apr 13 11:44:21 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, General, CH2, tempory beam interruption 
ventilation problem SPIRAL& - beam stopped for presumably appro. 10 min (PCP info)

beam is back at 11:52 h
Fixed, , Mon Apr 8 08:01:04 2019, iulian, MUST2, Hardware, , swiching off HV & BT (in that order) HV_mugast_end1.pngHV_mugast_end2.pngHV_mugast_end3.pngHV_mugast_end4.png
switching off HV & BT now :
>lpcgrit
>hvm_print MUST2
Fixed, e768s, Wed Jul 17 08:00:34 2019, Francois, BEAM, General, LiF, summary of the night 
0h-2H : beam tuning
2H Qpole down
4H Qpole problem solved but AGATA GGP problem
Ongoing, , Sat Jul 20 09:32:02 2019, Kseniia, Christian, Nikola,, OTHER, General, , summary of the morning shift 
timeline of run 116

09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
Fixed, e793s, Tue Mar 16 06:08:02 2021, Lynda, Cyril, Nishu, RUN, General, CD2, summary of run#63 @06:00hrs 10x
we had seen sufficient decrements in the beam current from time to time in the last few hours, everything else is going smooth so far..
Fixed, e793s, Sun Mar 14 22:01:04 2021, Miguel, Wilton, Ablaihan,nishu, RUN, General, CD2, summary of run 62@22:00hrs 9x
 
Fixed, e793s, Fri Mar 12 20:54:30 2021, mugast, RUN, General, CD2, summary of run 61 scalers.pngvamos.pngScreenshot_from_2021-03-12_20-57-53.pngScreenshot_from_2021-03-12_20-58-15.pngScreenshot_from_2021-03-12_20-58-45.png
 

ELOG Home Page