Fixed, e744s, Fri Apr 12 22:00:42 2019, Diego, TARGET, General, , very different target thickness
|
|
Fixed, e744s, Tue Apr 16 12:44:22 2019, Marion, Dieter, BEAM, General, Carbon, ventilation problem CSS2 12:43
|
ventilation problem CSS2 12:43
Beam back at 13h24 (see scaler attached) |
Fixed, e793s, Fri Mar 12 23:16:16 2021, julien, nishu, RUN, Hardware, CD2, vamos count rate goes down to 0 once again 
|
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:. |
Fixed, e744s, Tue Apr 16 11:39:40 2019, Valerian, OFFLINE, Software, CH2, two proton kinematics and center of mass reconstruction with all stat
|
|
Fixed, , Sun Jul 21 16:51:30 2019, Marlène, Christian, Ksenia, BEAM, General, , trial of tracking of the implantation of 15O
|
Looking at AGATA count rate, we have seen that the highest counting rate for 511 keV line is seen in the inner ring (0*A clusters).
The outer ring detectors (10B for example) counts 10 times less.
|
Fixed, TEST, Sun Feb 23 22:17:49 2020, Marlene, RUN, Hardware, , tracetek error
|
When filling the coolers with alcohol the tracetek cable triggered and switched off water and supplies.
Beam is off |
Fixed, e744s, Mon Apr 8 18:47:54 2019, iulian, OTHER, Hardware, N/A, todo to do list for Tuesday and 14N beam todo list 
|
To do list
- [COLOR=red]Id plots with Vamos[/COLOR]
|
Fixed, e744s, Tue Apr 16 19:50:20 2019, iulian valerian francois sylvan , OTHER, General, N/A, todo list after beam time
|
0) Heating the electronics of MUGAST
1) Calibration 3a with pedestals (10 min)
2) Calibration 3a 24 h
|
Fixed, e793s, Fri Mar 12 15:52:15 2021, Adrien, RUN, General, N/A, to do during run
|
[B]Every 1-2h:[/B]
[B]Online: take screen shot of[/B]
|
Fixed, com2019, Sat Apr 6 10:57:35 2019, Nicolas, OFFLINE, Software, CD2, time of flight v.s. energy in MUGAST (run 256, all stat)
|
|
Fixed, e768s, Thu Jul 18 14:38:04 2019, mugast, GRIT, General, N/A, time calibrator for MG10 X 
|
Here is the plot |
Fixed, TEST, Thu Mar 7 14:02:03 2019, Marlène Iulian, MUST2, General, N/A, test of MUST2 electronics
|
Test with pulser at 20 kHz
The OR of MUVI was scaled down by a factor of 100, to provoke some resets |
Fixed, TEST, Fri Feb 22 14:36:35 2019, iulian, MUST2, Hardware, 3-alpha, test new cable for Must2 detectors. Cables OK!
|
Cables put on Muvi3.
Testing procedure. Use the numbered cables to conect the annular detector (MG11) and check if ok: GECO writting on MUVI3 , ORD Present, DECS present, STOP
present.
|
Fixed, e744s, Sat Apr 13 11:44:21 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, General, CH2, tempory beam interruption
|
ventilation problem SPIRAL& - beam stopped for presumably appro. 10 min (PCP info)
beam is back at 11:52 h |
Fixed, , Mon Apr 8 08:01:04 2019, iulian, MUST2, Hardware, , swiching off HV & BT (in that order)   
|
switching off HV & BT now :
>lpcgrit
>hvm_print MUST2
|
Fixed, e768s, Wed Jul 17 08:00:34 2019, Francois, BEAM, General, LiF, summary of the night
|
0h-2H : beam tuning
2H Qpole down
4H Qpole problem solved but AGATA GGP problem
|
Ongoing, , Sat Jul 20 09:32:02 2019, Kseniia, Christian, Nikola,, OTHER, General, , summary of the morning shift
|
timeline of run 116
09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
|
Fixed, e793s, Tue Mar 16 06:08:02 2021, Lynda, Cyril, Nishu, RUN, General, CD2, summary of run#63 @06:00hrs 10x
|
we had seen sufficient decrements in the beam current from time to time in the last few hours, everything else is going smooth so far.. |
Fixed, e793s, Sun Mar 14 22:01:04 2021, Miguel, Wilton, Ablaihan,nishu, RUN, General, CD2, summary of run 62@22:00hrs 9x
|
|
Fixed, e793s, Fri Mar 12 20:54:30 2021, mugast, RUN, General, CD2, summary of run 61    
|
|
|