Fixed | e744s |
Fri Apr 12 22:00:42 2019 |
Diego | TARGET | General | | very different target thickness | |
|
Fixed | e744s |
Tue Apr 16 12:44:22 2019 |
Marion, Dieter | BEAM | General | Carbon | ventilation problem CSS2 12:43 | ventilation problem CSS2 12:43
Beam back at 13h24 (see scaler attached) |
|
Fixed | e793s |
Fri Mar 12 23:16:16 2021 |
julien, nishu | RUN | Hardware | CD2 | vamos count rate goes down to 0 once again | We reduced the high voltage limit to 520v
from 525v.
please see the screen shots of the focal |
 |
Fixed | e744s |
Tue Apr 16 11:39:40 2019 |
Valerian | OFFLINE | Software | CH2 | two proton kinematics and center of mass reconstruction with all stat | |
|
Fixed | |
Sun Jul 21 16:51:30 2019 |
Marlène, Christian, Ksenia | BEAM | General | | trial of tracking of the implantation of 15O | Looking at AGATA count rate, we have seen
that the highest counting rate for 511 keV
line is seen in the inner ring (0*A clusters).
|
|
Fixed | TEST |
Sun Feb 23 22:17:49 2020 |
Marlene | RUN | Hardware | | tracetek error | When filling the coolers with alcohol the
tracetek cable triggered and switched off
water and supplies.
|
|
Fixed | e744s |
Mon Apr 8 18:47:54 2019 |
iulian | OTHER | Hardware | N/A | todo to do list for Tuesday and 14N beam todo list | To do list
- [COLOR=red]Id plots with Vamos[/COLOR]
|
 |
Fixed | e744s |
Tue Apr 16 19:50:20 2019 |
iulian valerian francois sylvan | OTHER | General | N/A | todo list after beam time | 0) Heating the electronics of MUGAST
1) Calibration 3a with pedestals (10 min)
2) Calibration 3a 24 h
|
|
Fixed | e793s |
Fri Mar 12 15:52:15 2021 |
Adrien | RUN | General | N/A | to do during run | [B]Every 1-2h:[/B]
[B]Online: take screen shot of[/B]
|
|
Fixed | com2019 |
Sat Apr 6 10:57:35 2019 |
Nicolas | OFFLINE | Software | CD2 | time of flight v.s. energy in MUGAST (run 256, all stat) | |
|
Fixed | e768s |
Thu Jul 18 14:38:04 2019 |
mugast | GRIT | General | N/A | time calibrator for MG10 X | Here is the plot |
 |
Fixed | TEST |
Thu Mar 7 14:02:03 2019 |
Marlène Iulian | MUST2 | General | N/A | test of MUST2 electronics | Test with pulser at 20 kHz
The OR of MUVI was scaled down by a factor
of 100, to provoke some resets |
|
Fixed | TEST |
Fri Feb 22 14:36:35 2019 |
iulian | MUST2 | Hardware | 3-alpha | test new cable for Must2 detectors. Cables OK! | Cables put on Muvi3.
Testing procedure. Use the numbered cables
to conect the annular detector (MG11) and |
|
Fixed | e744s |
Sat Apr 13 11:44:21 2019 |
Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH | BEAM | General | CH2 | tempory beam interruption | ventilation problem SPIRAL& - beam stopped
for presumably appro. 10 min (PCP info)
|
|
Fixed | |
Mon Apr 8 08:01:04 2019 |
iulian | MUST2 | Hardware | | swiching off HV & BT (in that order) | switching off HV & BT now :
>lpcgrit
>hvm_print MUST2
|
   |
Fixed | e768s |
Wed Jul 17 08:00:34 2019 |
Francois | BEAM | General | LiF | summary of the night | 0h-2H : beam tuning
2H Qpole down
4H Qpole problem solved but AGATA GGP problem
|
|
Ongoing | |
Sat Jul 20 09:32:02 2019 |
Kseniia, Christian, Nikola, | OTHER | General | | summary of the morning shift | timeline of run 116
09:15 resync AGATA crustal 13C, AGATA was |
|
Fixed | e793s |
Tue Mar 16 06:08:02 2021 |
Lynda, Cyril, Nishu | RUN | General | CD2 | summary of run#63 @06:00hrs | we had seen sufficient decrements in the beam
current from time to time in the last few
hours, everything else is going smooth so |
10x |
Fixed | e793s |
Sun Mar 14 22:01:04 2021 |
Miguel, Wilton, Ablaihan,nishu | RUN | General | CD2 | summary of run 62@22:00hrs | |
9x |
Fixed | e793s |
Fri Mar 12 20:54:30 2021 |
mugast | RUN | General | CD2 | summary of run 61 | |
    |