MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 1 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Source Subjectdown Text Attachments
Fixede744s Fri Apr 12 22:00:42 2019 DiegoTARGETGeneral very different target thickness   Very_different_target_thickness.png 
Fixede744s Tue Apr 16 12:44:22 2019 Marion, DieterBEAMGeneralCarbonventilation problem CSS2 12:43 ventilation problem CSS2 12:43 

Beam back at 13h24 (see scaler attached)
 run134_scaler_afterbeamrestart_13h26.png 
Fixede793s Fri Mar 12 23:16:16 2021 julien, nishuRUNHardwareCD2vamos count rate goes down to 0 once againWe reduced the high voltage limit to 520v
from 525v.
please see the screen shots of the focal
 IMG20210312231358.jpgIMG20210312230429.jpg 
Fixede744s Tue Apr 16 11:39:40 2019 ValerianOFFLINESoftwareCH2two proton kinematics and center of mass reconstruction with all stat   All_stat_2p.png 
Fixed  Sun Jul 21 16:51:30 2019 Marlène, Christian, KseniaBEAMGeneral trial of tracking of the implantation of 15OLooking at AGATA count rate, we have seen
that the highest counting rate for 511 keV
line is seen in the inner ring (0*A clusters).
  
FixedTEST Sun Feb 23 22:17:49 2020 MarleneRUNHardware tracetek errorWhen filling the coolers with alcohol the
tracetek cable triggered and switched off
water and supplies.
  
Fixede744s Mon Apr 8 18:47:54 2019 iulianOTHERHardwareN/Atodo to do list for Tuesday and 14N beam todo listTo do list

- [COLOR=red]Id plots with Vamos[/COLOR]
 e744s.pdfE744_14N.pdf 
Fixede744s Tue Apr 16 19:50:20 2019 iulian valerian francois sylvan OTHERGeneralN/Atodo list after beam time0)  Heating the electronics of MUGAST
1)  Calibration 3a with pedestals (10 min)
2)  Calibration 3a 24 h
  
Fixede793s Fri Mar 12 15:52:15 2021 AdrienRUNGeneralN/Ato do during run[B]Every 1-2h:[/B]

[B]Online: take screen shot of[/B]
  
Fixedcom2019 Sat Apr 6 10:57:35 2019 NicolasOFFLINESoftwareCD2time of flight v.s. energy in MUGAST (run 256, all stat)   ToF_dE_MUGAST_run256_all_stat.pdf 
Fixede768s Thu Jul 18 14:38:04 2019 mugastGRITGeneralN/Atime calibrator for MG10 XHere is the plot   TAC_MUGAST_HF_StripByStrip_MG10_20190718.pngcalibT_StripByStrip_MG10_20190718.png 
FixedTEST Thu Mar 7 14:02:03 2019 Marlène IulianMUST2GeneralN/Atest of MUST2 electronics Test with pulser at 20 kHz
The OR of MUVI was scaled down by a factor
of 100, to provoke some resets
  
FixedTEST Fri Feb 22 14:36:35 2019 iulianMUST2Hardware3-alphatest new cable for Must2 detectors. Cables OK!Cables put on Muvi3.
Testing procedure. Use the numbered cables
to conect the annular detector (MG11) and
  
Fixede744s Sat Apr 13 11:44:21 2019 Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaHBEAMGeneralCH2tempory beam interruptionventilation problem SPIRAL& - beam stopped
for presumably appro. 10 min (PCP info)
  
Fixed  Mon Apr 8 08:01:04 2019 iulianMUST2Hardware swiching off HV & BT (in that order)switching off HV & BT now :
>lpcgrit
>hvm_print MUST2
 HV_mugast_end1.pngHV_mugast_end2.pngHV_mugast_end3.pngHV_mugast_end4.png 
Fixede768s Wed Jul 17 08:00:34 2019 FrancoisBEAMGeneralLiFsummary of the night0h-2H : beam tuning
2H Qpole down
4H Qpole problem solved but AGATA GGP problem
  
Ongoing  Sat Jul 20 09:32:02 2019 Kseniia, Christian, Nikola,OTHERGeneral summary of the morning shifttimeline of run 116

09:15 resync AGATA crustal 13C, AGATA was
  
Fixede793s Tue Mar 16 06:08:02 2021 Lynda, Cyril, NishuRUNGeneralCD2summary of run#63 @06:00hrswe had seen sufficient decrements in the beam
current from time to time in the last few
hours, everything else is going smooth so
 10x 
Fixede793s Sun Mar 14 22:01:04 2021 Miguel, Wilton, Ablaihan,nishuRUNGeneralCD2summary of run 62@22:00hrs   9x 
Fixede793s Fri Mar 12 20:54:30 2021 mugastRUNGeneralCD2summary of run 61   scalers.pngvamos.pngScreenshot_from_2021-03-12_20-57-53.pngScreenshot_from_2021-03-12_20-58-15.pngScreenshot_from_2021-03-12_20-58-45.png 

ELOG Home Page