MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 16 of 132  Not logged in MUGAST
Fixed, e768s, Sat Jul 20 04:30:42 2019, Serge & Franco, RUN, General, LiF, screenshots run 116 @ 02h00 14x
 
Fixed, e768s, Sat Jul 20 04:47:49 2019, Serge & Franco, RUN, General, LiF, screenshots run 116 @ 04h30 15x
The rate in the diamond was decreasing even if the rate in VAMOS was more or less constant. Now it seems stabilized.
Pending, e793s, Mon Mar 15 00:21:18 2021, Sarah, Louis, Charlie, BEAM, General, CD2, Source is running out run62_Scaler_Mar14_00h40.png
The beam intensity spiked to 9x10^9, so Louis called PCP to ask them to reduce it. He was told that the source was almost depleted, and was presented with
two options:
Fixed, e793s, Mon Mar 15 02:44:06 2021, Sarah, Louis, Charlie, RUN, General, CD2, Beam returned at 02:45 and stabilised by PCP 
The PCP team were not able to learn anything new about the state of the source from their diagnostic tests, but they told us that they have stabilized the
beam so there should be less fluctuations. They have also opened the slits to their maximum, which now gives us 5e5 pps.
Fixed, e793s, Mon Mar 15 03:08:18 2021, Sarah, Louis, Charlie, RUN, General, CD2, Run 62 screenshots at 03h00 8x
Note that Vigru crashed and had to be reopened, so the canvases have only been populated with the data since beam returned at 02h45.
Fixed, e793s, Mon Mar 15 04:57:32 2021, Sarah, Louis, Charlie, RUN, General, CD2, run 62 screenshots at 04h50 8x
The beam intensity has been surprisingly high so far, [URL=https://caeelog.in2p3.fr/MUGAST/6147]considering the news we were given[/URL] about the source
a few hours ago. It has just taken a dip to ~4.5e5 in the last 10 mins or so.
Fixed, e793s, Mon Mar 15 06:27:54 2021, Sarah, Louis, Charlie, BEAM, General, CD2, Beam lost at 06h25. Returned at 06h30 beamdrop_06h25.png
Electrostatic equipment from the source tripped. Should only be a few minutes of interruption.

EDIT:: Beam back after 5 mins. Screenshot attached.
Fixed, e793s, Mon Mar 15 06:59:02 2021, Sarah, Louis, Charlie, RUN, General, CD2, run 62 screenshots at 06h55 8x
Screenshots attached. Note that the fluctuation issues have returned after the "electrostatic trip"(?) but the beam pps remain pretty high.
Fixed, e793s, Fri Mar 12 18:42:51 2021, Sarah, Louis, BEAM, General, CD2, Beam Back 
The beam is back at 18h40
The beam stopped due to source problems, going up steadily, currently at ~2e5 pps
Fixed, e793s, Tue Mar 16 08:39:46 2021, Sarah, Chloé, Ablaihan, BEAM, General, CD2, Beam dropped due to electric defect. @ 08h40 back @ 8h45 
 
Fixed, e793s, Tue Mar 16 11:09:23 2021, Sarah, Chloé, Ablaihan, RUN, General, CD2, run63 screenshots at 11h05 10x
 
Fixed, e793s, Tue Mar 16 14:15:55 2021, Sarah, Chloé, Ablaihan, RUN, General, CD2, run63_13h58_Screenshots 9x
 
Fixed, e793s, Sat Mar 13 17:35:57 2021, Sarah Louis Wilton, RUN, General, CD2, run62 screenshots at 17h25 9x
 
Fixed, e793s, Sat Mar 13 17:41:57 2021, Sarah Louis Wilton, RUN, General, CD2, Beam intensity increased Beam_at_17h40.pngScalars_at_17h35.png
Bertrand saw that the slits were slightly closed, called the PCP and now we have around 5e5 pps
we can see the increase on the figure at 17h20 
Fixed, e793s, Sat Mar 13 22:16:59 2021, Sarah Louis Wilton, ONLINE, General, CD2, run62 screenshots at 22h10 10x
 
Fixed, e793s, Sat Mar 13 20:05:04 2021, Sarah Louis, ONLINE, General, CD2, run62 screenshots at 20h00 10x
 
Fixed, e793s, Tue Mar 16 08:17:33 2021, Sarah Chloé Ablaihan, RUN, General, CD2, run63 screenshots at 08h10 10x
 
Fixed, TEST, Mon Apr 1 08:50:46 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 156
  - MUVI: MUVI1
Fixed, TEST, Mon Apr 1 09:00:20 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 157
  - MUVI: MUVI1
Fixed, TEST, Mon Apr 1 09:09:50 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 158
  - MUVI: MUVI2

ELOG Home Page