MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 16 of 132  Not logged in MUGAST
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede768s Sat Jul 20 04:30:42 2019 Serge & FrancoRUNGeneralLiFscreenshots run 116 @ 02h00
Attachment 1: Scalers_run116_6.png
Scalers_run116_6.png
Attachment 2: DC_X_run116_6.png
DC_X_run116_6.png
Attachment 3: DC_Y_run116_6.png
DC_Y_run116_6.png
Attachment 4: DC_E_run116_6.png
DC_E_run116_6.png
Attachment 5: MW_run116_6.png
MW_run116_6.png
Attachment 6: TACS_run116_6.png
TACS_run116_6.png
Attachment 7: REC_run116_6.png
REC_run116_6.png
Attachment 8: DEE_run116_6.png
DEE_run116_6.png
Attachment 9: IC_IC_run116_6.png
IC_IC_run116_6.png
Attachment 10: MM_ETOF_run116_6.png
MM_ETOF_run116_6.png
Attachment 11: MG_ETOF_run116_6.png
MG_ETOF_run116_6.png
Attachment 12: NP_T_run116_6.png
NP_T_run116_6.png
Attachment 13: MM_DEE_run116_6.png
MM_DEE_run116_6.png
Attachment 14: rate_run116_6.png
rate_run116_6.png
Fixede768s Sat Jul 20 04:47:49 2019 Serge & FrancoRUNGeneralLiFscreenshots run 116 @ 04h30
The rate in the diamond was decreasing even if the rate in VAMOS was more or less constant. Now it seems stabilized.
Attachment 1: scalers_run116_7.png
scalers_run116_7.png
Attachment 2: IC2_run116_7.png
IC2_run116_7.png
Attachment 3: EDE_run116_7.png
EDE_run116_7.png
Attachment 4: TACS2_run116_7.png
TACS2_run116_7.png
Attachment 5: IC_run116_7.png
IC_run116_7.png
Attachment 6: DCE_run116_7.png
DCE_run116_7.png
Attachment 7: DCY_run116_7.png
DCY_run116_7.png
Attachment 8: DCX_run116_7.png
DCX_run116_7.png
Attachment 9: TACS_run116_7.png
TACS_run116_7.png
Attachment 10: MG_ETOF_run116_7.png
MG_ETOF_run116_7.png
Attachment 11: MM_EdE_run116_7.png
MM_EdE_run116_7.png
Attachment 12: MM_ETOF_run116_7.png
MM_ETOF_run116_7.png
Attachment 13: MGimpact__run116_7.png
MGimpact__run116_7.png
Attachment 14: MMimpact__run116_7.png
MMimpact__run116_7.png
Attachment 15: rate_run116_7.png
rate_run116_7.png
Pendinge793s Mon Mar 15 00:21:18 2021 Sarah, Louis, CharlieBEAMGeneralCD2Source is running out
The beam intensity spiked to 9x10^9, so Louis called PCP to ask them to reduce it. He was told that the source was almost depleted, and was presented with two options:

A) Keep pushing the source and run at 5x10^5, but run out completely soon (probably during the night shift)
B) Let the rates slowly drop and open the slits as much as possible, to make the source last longer (perhaps another day). This option is strongly preferred by the PCP team, and is the current plan we are following.

Changing the source would apparently take ~12 hrs. There will be a large meeting of all of the technical staff - including the beam and source experts - tomorrow morning at 09:00, so there may be more information about the best course of action after that.

Wilton was consulted as one of the spokespeople of the experiment, and he approves of this action.
Attachment 1: run62_Scaler_Mar14_00h40.png
run62_Scaler_Mar14_00h40.png
Fixede793s Mon Mar 15 02:44:06 2021 Sarah, Louis, CharlieRUNGeneralCD2Beam returned at 02:45 and stabilised by PCP
The PCP team were not able to learn anything new about the state of the source from their diagnostic tests, but they told us that they have stabilized the beam so there should be less fluctuations. They have also opened the slits to their maximum, which now gives us 5e5 pps.
Fixede793s Mon Mar 15 03:08:18 2021 Sarah, Louis, CharlieRUNGeneralCD2Run 62 screenshots at 03h00
Note that Vigru crashed and had to be reopened, so the canvases have only been populated with the data since beam returned at 02h45.
Attachment 1: run62_MM_IMPACT_03h00.png
run62_MM_IMPACT_03h00.png
Attachment 2: run62_MM_ToF_03h00.png
run62_MM_ToF_03h00.png
Attachment 3: run62_MM_DeE_03h00.png
run62_MM_DeE_03h00.png
Attachment 4: run62_MG_TOF_03h00.png
run62_MG_TOF_03h00.png
Attachment 5: run62_TAC_03h00.png
run62_TAC_03h00.png
Attachment 6: run62_VAMOS_03h00.png
run62_VAMOS_03h00.png
Attachment 7: run62_MG_IMPACT_03h00.png
run62_MG_IMPACT_03h00.png
Attachment 8: run62_scaler_03h00.png
run62_scaler_03h00.png
Fixede793s Mon Mar 15 04:57:32 2021 Sarah, Louis, CharlieRUNGeneralCD2run 62 screenshots at 04h50
The beam intensity has been surprisingly high so far, considering the news we were given about the source a few hours ago. It has just taken a dip to ~4.5e5 in the last 10 mins or so.
Attachment 1: run62_scaler_04h50.png
run62_scaler_04h50.png
Attachment 2: run62_MM_IMPACT_04h50.png
run62_MM_IMPACT_04h50.png
Attachment 3: run62_MM_ToF_04h50.png
run62_MM_ToF_04h50.png
Attachment 4: run62_MM_DeE_04h50.png
run62_MM_DeE_04h50.png
Attachment 5: run62_MG_TOF_04h50.png
run62_MG_TOF_04h50.png
Attachment 6: run62_TAC_04h50.png
run62_TAC_04h50.png
Attachment 7: run62_VAMOS_04h50.png
run62_VAMOS_04h50.png
Attachment 8: run62_MG_IMPACT_04h50.png
run62_MG_IMPACT_04h50.png
Fixede793s Mon Mar 15 06:27:54 2021 Sarah, Louis, CharlieBEAMGeneralCD2Beam lost at 06h25. Returned at 06h30
Electrostatic equipment from the source tripped. Should only be a few minutes of interruption.

EDIT:: Beam back after 5 mins. Screenshot attached.
Attachment 1: beamdrop_06h25.png
beamdrop_06h25.png
Fixede793s Mon Mar 15 06:59:02 2021 Sarah, Louis, CharlieRUNGeneralCD2run 62 screenshots at 06h55
Screenshots attached. Note that the fluctuation issues have returned after the "electrostatic trip"(?) but the beam pps remain pretty high.
Attachment 1: run62_scaler_06h55.png
run62_scaler_06h55.png
Attachment 2: run62_MM_DeE_06h55.png
run62_MM_DeE_06h55.png
Attachment 3: run62_MM_ToF_06h55.png
run62_MM_ToF_06h55.png
Attachment 4: run62_MG_TOF_06h55.png
run62_MG_TOF_06h55.png
Attachment 5: run62_TAC_06h55.png
run62_TAC_06h55.png
Attachment 6: run62_VAMOS_06h55.png
run62_VAMOS_06h55.png
Attachment 7: run62_MM_IMPACT_06h55.png
run62_MM_IMPACT_06h55.png
Attachment 8: run62_MG_IMPACT_06h55.png
run62_MG_IMPACT_06h55.png
Fixede793s Fri Mar 12 18:42:51 2021 Sarah, LouisBEAMGeneralCD2Beam Back
The beam is back at 18h40
The beam stopped due to source problems, going up steadily, currently at ~2e5 pps
Fixede793s Tue Mar 16 08:39:46 2021 Sarah, Chloé, AblaihanBEAMGeneralCD2Beam dropped due to electric defect. @ 08h40 back @ 8h45
Fixede793s Tue Mar 16 11:09:23 2021 Sarah, Chloé, AblaihanRUNGeneralCD2run63 screenshots at 11h05
Attachment 1: run63_Etheta_11h05.png
run63_Etheta_11h05.png
Attachment 2: run63_MM_IMPACT_11h05.png
run63_MM_IMPACT_11h05.png
Attachment 3: run63_vamos_11h05.png
run63_vamos_11h05.png
Attachment 4: run63_fsc_11h05.png
run63_fsc_11h05.png
Attachment 5: run63_tac_11h05.png
run63_tac_11h05.png
Attachment 6: run63_mgtof_11h05.png
run63_mgtof_11h05.png
Attachment 7: run63_mmdE_11h05.png
run63_mmdE_11h05.png
Attachment 8: run63_mmtof_11h05.png
run63_mmtof_11h05.png
Attachment 9: run63_mgimpact_11h05.png
run63_mgimpact_11h05.png
Attachment 10: run63_sclalers_11h10.png
run63_sclalers_11h10.png
Fixede793s Tue Mar 16 14:15:55 2021 Sarah, Chloé, AblaihanRUNGeneralCD2run63_13h58_Screenshots
Attachment 1: run63_13h58_Scaler2.png
run63_13h58_Scaler2.png
Attachment 2: run63_13h58_Scaler1.png
run63_13h58_Scaler1.png
Attachment 3: run63_13h58_MW_TDC.png
run63_13h58_MW_TDC.png
Attachment 4: run63_13h58_Raw_TAC.png
run63_13h58_Raw_TAC.png
Attachment 5: run63_13h58_E_dE_MM.png
run63_13h58_E_dE_MM.png
Attachment 6: run63_13h58_E_TOF_MG.png
run63_13h58_E_TOF_MG.png
Attachment 7: run63_13h58_E_TOF_MM.png
run63_13h58_E_TOF_MM.png
Attachment 8: run63_13h58_Impact_Matrix_MG.png
run63_13h58_Impact_Matrix_MG.png
Attachment 9: run63_13h58_Impact_Matrix_MM.png
run63_13h58_Impact_Matrix_MM.png
Fixede793s Sat Mar 13 17:35:57 2021 Sarah Louis WiltonRUNGeneralCD2run62 screenshots at 17h25
Attachment 1: run62_Theta_E_17h25.png
run62_Theta_E_17h25.png
Attachment 2: run62_MM_IMPACT_17h25.png
run62_MM_IMPACT_17h25.png
Attachment 3: run62_Vamos-MW_17h25.png
run62_Vamos-MW_17h25.png
Attachment 4: run62_FSC_17h25.png
run62_FSC_17h25.png
Attachment 5: run62_TAC_17h25.png
run62_TAC_17h25.png
Attachment 6: run62_MG_ToF_17h25.png
run62_MG_ToF_17h25.png
Attachment 7: run62_MM_DeE_17h25.png
run62_MM_DeE_17h25.png
Attachment 8: run62_MM_ToF_17h25.png
run62_MM_ToF_17h25.png
Attachment 9: run62_MG_IMPACT_17h25.png
run62_MG_IMPACT_17h25.png
Fixede793s Sat Mar 13 17:41:57 2021 Sarah Louis WiltonRUNGeneralCD2Beam intensity increased
Bertrand saw that the slits were slightly closed, called the PCP and now we have around 5e5 pps
we can see the increase on the figure at 17h20
Attachment 1: Beam_at_17h40.png
Beam_at_17h40.png
Attachment 2: Scalars_at_17h35.png
Scalars_at_17h35.png
Fixede793s Sat Mar 13 22:16:59 2021 Sarah Louis WiltonONLINEGeneralCD2run62 screenshots at 22h10
Attachment 1: Scalars_at_22h15.png
Scalars_at_22h15.png
Attachment 2: run62_MG_IMPACT_22h15.png
run62_MG_IMPACT_22h15.png
Attachment 3: run62_MM_ToF_22h15.png
run62_MM_ToF_22h15.png
Attachment 4: run62_MM_DeE_22h10.png
run62_MM_DeE_22h10.png
Attachment 5: run62_MG_ToF_22h10.png
run62_MG_ToF_22h10.png
Attachment 6: run62_TAC_22h05.png
run62_TAC_22h05.png
Attachment 7: run62_FSC_22h05.png
run62_FSC_22h05.png
Attachment 8: run62_Vamos-MW_22h05.png
run62_Vamos-MW_22h05.png
Attachment 9: run62_MG_IMPACT_22h05.png
run62_MG_IMPACT_22h05.png
Attachment 10: run62_Theta_E_22h05.png
run62_Theta_E_22h05.png
Fixede793s Sat Mar 13 20:05:04 2021 Sarah LouisONLINEGeneralCD2run62 screenshots at 20h00
Attachment 1: Scalars_at_20h00.png
Scalars_at_20h00.png
Attachment 2: run62_MG_IMPACT_20h00.png
run62_MG_IMPACT_20h00.png
Attachment 3: run62_MM_ToF_20h00.png
run62_MM_ToF_20h00.png
Attachment 4: run62_MM_DeE_20h00.png
run62_MM_DeE_20h00.png
Attachment 5: run62_MG_ToF_20h00.png
run62_MG_ToF_20h00.png
Attachment 6: run62_TAC_20h00.png
run62_TAC_20h00.png
Attachment 7: run62_FSC_20h00.png
run62_FSC_20h00.png
Attachment 8: run62_Vamos-MW_20h00.png
run62_Vamos-MW_20h00.png
Attachment 9: run62_MM_IMPACT_20h00.png
run62_MM_IMPACT_20h00.png
Attachment 10: run62_Theta_E_20h00.png
run62_Theta_E_20h00.png
Fixede793s Tue Mar 16 08:17:33 2021 Sarah Chloé AblaihanRUNGeneralCD2run63 screenshots at 08h10
Attachment 1: run63_sclalers_08h10.png
run63_sclalers_08h10.png
Attachment 2: run63_fsc_08h10.png
run63_fsc_08h10.png
Attachment 3: run63_tac_08h10.png
run63_tac_08h10.png
Attachment 4: run63_mgtof_08h10.png
run63_mgtof_08h10.png
Attachment 5: run63_mmdE_08h11.png
run63_mmdE_08h11.png
Attachment 6: run63_mmtof_08h10.png
run63_mmtof_08h10.png
Attachment 7: run63_mgimpact_08h10.png
run63_mgimpact_08h10.png
Attachment 8: run63_vamos_08h10.png
run63_vamos_08h10.png
Attachment 9: run63_MM_IMPACT_08h10.png
run63_MM_IMPACT_08h10.png
Attachment 10: run63_Etheta_08h10.png
run63_Etheta_08h10.png
FixedTEST Mon Apr 1 08:50:46 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 156
- MUVI: MUVI1
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
FixedTEST Mon Apr 1 09:00:20 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 157
- MUVI: MUVI1
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4
FixedTEST Mon Apr 1 09:09:50 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 158
- MUVI: MUVI2
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4

ELOG Home Page