MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 16 of 132  Not logged in MUGAST
Status ExpNbr Date Authordown Type Category Target-Source Subject Text Attachments
Fixede768s Sat Jul 20 04:30:42 2019 Serge & FrancoRUNGeneralLiFscreenshots run 116 @ 02h00   14x 
Fixede768s Sat Jul 20 04:47:49 2019 Serge & FrancoRUNGeneralLiFscreenshots run 116 @ 04h30The rate in the diamond was decreasing even
if the rate in VAMOS was more or less constant.
Now it seems stabilized.
 15x 
Pendinge793s Mon Mar 15 00:21:18 2021 Sarah, Louis, CharlieBEAMGeneralCD2Source is running outThe beam intensity spiked to 9x10^9, so Louis
called PCP to ask them to reduce it. He was
told that the source was almost depleted,
 run62_Scaler_Mar14_00h40.png 
Fixede793s Mon Mar 15 02:44:06 2021 Sarah, Louis, CharlieRUNGeneralCD2Beam returned at 02:45 and stabilised by PCPThe PCP team were not able to learn anything
new about the state of the source from their
diagnostic tests, but they told us that they
  
Fixede793s Mon Mar 15 03:08:18 2021 Sarah, Louis, CharlieRUNGeneralCD2Run 62 screenshots at 03h00Note that Vigru crashed and had to be reopened,
so the canvases have only been populated
with the data since beam returned at 02h45.
 8x 
Fixede793s Mon Mar 15 04:57:32 2021 Sarah, Louis, CharlieRUNGeneralCD2run 62 screenshots at 04h50The beam intensity has been surprisingly high
so far, [URL=https://caeelog.in2p3.fr/MUGAST/6147]considering
the news we were given[/URL] about the source
 8x 
Fixede793s Mon Mar 15 06:27:54 2021 Sarah, Louis, CharlieBEAMGeneralCD2Beam lost at 06h25. Returned at 06h30Electrostatic equipment from the source tripped.
Should only be a few minutes of interruption.
 beamdrop_06h25.png 
Fixede793s Mon Mar 15 06:59:02 2021 Sarah, Louis, CharlieRUNGeneralCD2run 62 screenshots at 06h55Screenshots attached. Note that the fluctuation
issues have returned after the "electrostatic
trip"(?) but the beam pps remain pretty high.
 8x 
Fixede793s Fri Mar 12 18:42:51 2021 Sarah, LouisBEAMGeneralCD2Beam BackThe beam is back at 18h40
The beam stopped due to source problems,
going up steadily, currently at ~2e5 pps
  
Fixede793s Tue Mar 16 08:39:46 2021 Sarah, Chloé, AblaihanBEAMGeneralCD2Beam dropped due to electric defect. @ 08h40 back @ 8h45    
Fixede793s Tue Mar 16 11:09:23 2021 Sarah, Chloé, AblaihanRUNGeneralCD2run63 screenshots at 11h05   10x 
Fixede793s Tue Mar 16 14:15:55 2021 Sarah, Chloé, AblaihanRUNGeneralCD2run63_13h58_Screenshots   9x 
Fixede793s Sat Mar 13 17:35:57 2021 Sarah Louis WiltonRUNGeneralCD2run62 screenshots at 17h25   9x 
Fixede793s Sat Mar 13 17:41:57 2021 Sarah Louis WiltonRUNGeneralCD2Beam intensity increasedBertrand saw that the slits were slightly
closed, called the PCP and now we have around
5e5 pps
 Beam_at_17h40.pngScalars_at_17h35.png 
Fixede793s Sat Mar 13 22:16:59 2021 Sarah Louis WiltonONLINEGeneralCD2run62 screenshots at 22h10   10x 
Fixede793s Sat Mar 13 20:05:04 2021 Sarah LouisONLINEGeneralCD2run62 screenshots at 20h00   10x 
Fixede793s Tue Mar 16 08:17:33 2021 Sarah Chloé AblaihanRUNGeneralCD2run63 screenshots at 08h10   10x 
FixedTEST Mon Apr 1 08:50:46 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun*** Run Time Calibrator FSC ***
  - Run: 156
  - MUVI: MUVI1
  
FixedTEST Mon Apr 1 09:00:20 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun*** Run Time Calibrator FSC ***
  - Run: 157
  - MUVI: MUVI1
  
FixedTEST Mon Apr 1 09:09:50 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun*** Run Time Calibrator FSC ***
  - Run: 158
  - MUVI: MUVI2
  

ELOG Home Page