Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e768s |
Sat Jul 20 04:30:42 2019 |
Serge & Franco | RUN | General | LiF | screenshots run 116 @ 02h00 | |
14x |
Fixed | e768s |
Sat Jul 20 04:47:49 2019 |
Serge & Franco | RUN | General | LiF | screenshots run 116 @ 04h30 | The rate in the diamond was decreasing even
if the rate in VAMOS was more or less constant.
Now it seems stabilized. |
15x |
Pending | e793s |
Mon Mar 15 00:21:18 2021 |
Sarah, Louis, Charlie | BEAM | General | CD2 | Source is running out | The beam intensity spiked to 9x10^9, so Louis
called PCP to ask them to reduce it. He was
told that the source was almost depleted, |
|
Fixed | e793s |
Mon Mar 15 02:44:06 2021 |
Sarah, Louis, Charlie | RUN | General | CD2 | Beam returned at 02:45 and stabilised by PCP | The PCP team were not able to learn anything
new about the state of the source from their
diagnostic tests, but they told us that they |
|
Fixed | e793s |
Mon Mar 15 03:08:18 2021 |
Sarah, Louis, Charlie | RUN | General | CD2 | Run 62 screenshots at 03h00 | Note that Vigru crashed and had to be reopened,
so the canvases have only been populated
with the data since beam returned at 02h45. |
8x |
Fixed | e793s |
Mon Mar 15 04:57:32 2021 |
Sarah, Louis, Charlie | RUN | General | CD2 | run 62 screenshots at 04h50 | The beam intensity has been surprisingly high
so far, [URL=https://caeelog.in2p3.fr/MUGAST/6147]considering
the news we were given[/URL] about the source |
8x |
Fixed | e793s |
Mon Mar 15 06:27:54 2021 |
Sarah, Louis, Charlie | BEAM | General | CD2 | Beam lost at 06h25. Returned at 06h30 | Electrostatic equipment from the source tripped.
Should only be a few minutes of interruption.
|
|
Fixed | e793s |
Mon Mar 15 06:59:02 2021 |
Sarah, Louis, Charlie | RUN | General | CD2 | run 62 screenshots at 06h55 | Screenshots attached. Note that the fluctuation
issues have returned after the "electrostatic
trip"(?) but the beam pps remain pretty high. |
8x |
Fixed | e793s |
Fri Mar 12 18:42:51 2021 |
Sarah, Louis | BEAM | General | CD2 | Beam Back | The beam is back at 18h40
The beam stopped due to source problems,
going up steadily, currently at ~2e5 pps |
|
Fixed | e793s |
Tue Mar 16 08:39:46 2021 |
Sarah, Chloé, Ablaihan | BEAM | General | CD2 | Beam dropped due to electric defect. @ 08h40 back @ 8h45 | |
|
Fixed | e793s |
Tue Mar 16 11:09:23 2021 |
Sarah, Chloé, Ablaihan | RUN | General | CD2 | run63 screenshots at 11h05 | |
10x |
Fixed | e793s |
Tue Mar 16 14:15:55 2021 |
Sarah, Chloé, Ablaihan | RUN | General | CD2 | run63_13h58_Screenshots | |
9x |
Fixed | e793s |
Sat Mar 13 17:35:57 2021 |
Sarah Louis Wilton | RUN | General | CD2 | run62 screenshots at 17h25 | |
9x |
Fixed | e793s |
Sat Mar 13 17:41:57 2021 |
Sarah Louis Wilton | RUN | General | CD2 | Beam intensity increased | Bertrand saw that the slits were slightly
closed, called the PCP and now we have around
5e5 pps
|
 |
Fixed | e793s |
Sat Mar 13 22:16:59 2021 |
Sarah Louis Wilton | ONLINE | General | CD2 | run62 screenshots at 22h10 | |
10x |
Fixed | e793s |
Sat Mar 13 20:05:04 2021 |
Sarah Louis | ONLINE | General | CD2 | run62 screenshots at 20h00 | |
10x |
Fixed | e793s |
Tue Mar 16 08:17:33 2021 |
Sarah Chloé Ablaihan | RUN | General | CD2 | run63 screenshots at 08h10 | |
10x |
Fixed | TEST |
Mon Apr 1 08:50:46 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun | *** Run Time Calibrator FSC ***
- Run: 156
- MUVI: MUVI1
|
|
Fixed | TEST |
Mon Apr 1 09:00:20 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun | *** Run Time Calibrator FSC ***
- Run: 157
- MUVI: MUVI1
|
|
Fixed | TEST |
Mon Apr 1 09:09:50 2019 |
OttoTime | RUN | General | N/A | TimeCalibratorRun | *** Run Time Calibrator FSC ***
- Run: 158
- MUVI: MUVI2
|
|