MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 131 of 132  Not logged in MUGAST
Fixed, e775s, Thu Feb 27 09:54:17 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 
Start at 09h50 (Feb. 27th)
Stop at

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Thu Feb 27 09:56:19 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 - analysis 

Nicolas, Sylvain, Antoine, Adrien wrote:
Start at 09h50 (Feb. 27th)
Stop at

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Thu Feb 27 09:56:39 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 - Beam intensity time evolution 

Nicolas, Sylvain, Antoine, Adrien wrote:
Start at 09h50 (Feb. 27th)
Stop at

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Thu Feb 27 10:03:03 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 - minutes of what happened during the run 
Here is a brief summary of what happened over the course of the run:

From beginning of run to 12 pm (February 27th)



Nicolas, Sylvain, Antoine, Adrien wrote:
Start at 09h50 (Feb. 27th)
Stop at

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
Fixed, e775s, Thu Feb 27 11:51:34 2020, Nicolas Sylvain Marlène, RUN, General, , run 139 
Start at 09h51 (Feb. 27th)
Stop at 11h22 (Feb. 27th)

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
Fixed, e775s, Thu Feb 27 11:53:34 2020, mugast, RUN, General, , run 140 
Start at 11h41 (Feb. 27th)
Stop at (Feb. 27th)

Beam: 19O
Intensity: 4e5 pps

Target; CD2 (350 ug/cm2, NO gold) #3
Fixed, e775s, Thu Feb 27 12:35:39 2020, Marlène Nicolas, GRIT, General, , RUN128-137_138 analysis Elab_Thetalab_RUN128_137_138.pngExEg_RUN128_137_139.pngEx_RUN128_137_138.png
Kinematic lines for the full statistics up to now
States above E*>7 MeV are cut in the angles >140 because of energy threshold.
Pinned, e775s, Thu Feb 27 12:44:37 2020, Nicolas, OFFLINE, Software, , How to produce control spectra 
In /home/mugast/analysis/nptool/Projects/MUGAST/e775s directory there is the Control.C macro which draws: Ex, Ex vs Eg and Elab vs thetalab for each run (run number must be given in argument) or for chained runs (argument must be 0)
Fixed, e775s, Thu Feb 27 15:51:03 2020, mugast, RUN, General, , RUN 140 
Target CD2 thin target
Beam intensity ~ 5e+5 pps


to check the gammas from 20O
Fixed, , Thu Feb 27 15:54:09 2020, Marlène , RUN, General, , RUN 141 junk (problem at start) 
Fixed, , Thu Feb 27 15:56:09 2020, Marlène, RUN, General, , RUN 142 AGATA- 143 VAMOS-MUGAST 
RUN142 on AGATA and RUN143 on MUGAST/VAMOS

target CD2 (350ug/cm2)
Trigger MUGAST
Beam intensity : 5e+5pps



!!!! there is a shift in the run number on AGATA with respect to VAMOS/MUGAST
    Fixed, , Thu Feb 27 16:25:45 2020, Marlène, RUN, General, , RUN 142-143 screenshots RUN143_ElabThetaLab.pngRUN143_impact.pngRUN143_tac.pngRUN143_tof.png

Marlène wrote:
RUN142 on AGATA and RUN143 on MUGAST/VAMOS

target CD2 (350ug/cm2)
Trigger MUGAST
Beam intensity : 5e+5pps



!!!! there is a shift in the run number on AGATA with respect to VAMOS/MUGAST
    Fixed, , Thu Feb 27 16:30:53 2020, Marlène, RUN, General, , RUN 142 -143 preliminary analysis  RUN143_ana_Elab_Thetalab.pngRUN143_ana_Ex_Eg.pngRUN143_ana_Ex.png

Marlène wrote:

Marlène wrote:
RUN142 on AGATA and RUN143 on MUGAST/VAMOS

target CD2 (350ug/cm2)
Trigger MUGAST
Beam intensity : 5e+5pps



!!!! there is a shift in the run number on AGATA with respect to VAMOS/MUGAST
    Pinned, e775s, Thu Feb 27 16:35:26 2020, Nicolas, OFFLINE, Software, , How to produce control spectra 

Nicolas wrote:
In /home/mugast/analysis/nptool/Projects/MUGAST/e775s directory there is the Control.C macro which draws: Ex, Ex vs Eg and Elab vs thetalab for each run (run number must be given in argument) or for chained runs (argument must be 0)



A new file has been created to look into the CD2 target runs : Control_CD2.C
    Fixed, e775s, Thu Feb 27 16:36:25 2020, Nicolas Sylvain Marlène, RUN, General, , run 139 

Nicolas Sylvain Marlène wrote:
Start at 09h51 (Feb. 27th)
Stop at 11h22 (Feb. 27th)

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2



temperature on MUFEE was checked to be between 0 and 12 degress depending on the boards.
The current of the detectors are stable.
Fixed, , Fri Feb 28 11:20:22 2020, Marlène, GRIT, General, , RUN 150 
RUN 150
target CD2 300 ug/cm2
Beam intensity 4e+5pps

Note that there is no 144,145,146,147, 148 ans 149 runs
Fixed, e775s, Fri Feb 28 11:21:31 2020, Marlène, RUN, General, , RUN 151 
RUN 151

Change of target now : CD2+AU #2
Beam intensity : 4e+5pps
, e775s, Fri Feb 28 13:58:31 2020, Marlène, , , ,  
    Fixed, e775s, Fri Feb 28 14:00:08 2020, Marlène, RUN, General, , RUN 151 beam stop 

Marlène wrote:
RUN 151

Change of target now : CD2+AU #2
Beam intensity : 4e+5pps



beam stopped due to unstable equipment in CSS1.
expected duration : 15 min
Fixed, e775s, Sun Mar 1 17:04:43 2020, Marlène François, RUN, General, , Preliminary analysis of runs from 128 up to now (169) 6x
Preliminary analysis with all stat up to now.

ELOG Home Page