Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e793s |
Wed Mar 10 15:15:44 2021 |
Charlie | OTHER | General | | 48Ti Kinematics (additional) | Supplementary to Adrien's kinematic calculations
of 47Ti(d,p)48Ti, we have found a paper suggesting
that by far the most strongly populated state |
  |
Fixed | e793s |
Sat Mar 13 14:49:40 2021 |
Charlie | OFFLINE | General | CD2 | TWOFNR for 4 MeV, 0f5/2 | In response to Franco's comment [URL=https://caeelog.in2p3.fr/MUGAST/6119]here[/URL],
I ran some quick TWOFNR simulations for a
0f5/2 transfer on to 4 MeV, on to spin 2 |
  |
Fixed | e793s |
Tue Mar 16 23:57:29 2021 |
Charlie | RUN | General | CD2 | run63 scaler graph at 00h00 | The scaler graph had frozen at 15:45, so all
of the screenshots of it since then show
the same section. Refreshed graph of the |
|
Fixed | e744s |
Sat Apr 13 22:45:27 2019 |
Beyhan, Sylvain, Jaromir | AGATA | Software | N/A | Agata yellow phase 1 minute | Agata yellow 1 minute
All the trigers emitted by (every) single |
|
Fixed | e744s |
Sat Apr 13 19:27:16 2019 |
Beyhan, Jaromir | OTHER | General | N/A | Spreadsheet with a list of runs up to 122 | Resides also in home directory
runs_list.ods
|
    |
Fixed | e744s |
Sun Apr 14 12:32:32 2019 |
Beyhan, François | OTHER | General | | Alarm in G2 but no beam stop | Same issue as Saturday evening.
Alarm in G2 at 12:30 due to Exogam filling
with liquid nitrogen.
|
|
Fixed | e744s |
Mon Apr 15 17:17:57 2019 |
Beyhan +... | OTHER | General | | Spreadsheet with a list of runs up to 130 | |
|
Fixed | e744s |
Wed Apr 10 06:51:35 2019 |
Beyhan | BEAM | General | | 14N7+ beam characteristics and settings at VAMOS | |
   |
Fixed | e744s |
Thu Apr 11 18:36:34 2019 |
Beyhan | BEAM | General | | before optimization : beam reconstructed profil with VAMOS and assoicated settings | target : hole
cats2 out
about 4000 pps triggering VAMOS |
 |
Fixed | e744s |
Sat Apr 13 20:37:16 2019 |
Beyhan | OTHER | General | | Alarm in G2 | Alarm signal from G2.
No beam since 20:30
PCP will have a look in G2, following the |
|
Documents | e744s |
Tue Apr 16 12:15:28 2019 |
Beyhan | OTHER | General | | VAMOS settings for C run | |
|
Fixed | e786s |
Fri Jun 28 09:56:59 2019 |
Bertrand, Valerian and Adrien | BEAM | General | N/A | Dipole stopped in the morning? | Dipole restart at 10. Shoudl be checked with
time stamp. |
|
Fixed | e768s |
Mon Jul 15 12:57:53 2019 |
Aranaud, Nicolas, Marlène, François | TARGET | General | LiF | Targets position | Targets have been mounted on target ladder
and are now in reaction chamber |
6x |
Fixed | e744s |
Fri Apr 12 17:12:42 2019 |
Antoine | OFFLINE | General | CH2 | 13N identified in VAMOS |
Identification plots.
|
  |
Fixed | e744s |
Mon Apr 15 10:07:23 2019 |
Antoine | VAMOS | Hardware | | Brho VAMOS |
During the change, Johan entered in G1 and
connected a mass cable for the drift chambers. |
|
Fixed | e768s |
Fri Jul 26 19:47:18 2019 |
Andres & Franco | RUN | General | LiF | Check beam intensity and profile run152 h 19.30 | |
|
Fixed | e768s |
Fri Jul 26 23:58:08 2019 |
Andres & Franco | RUN | General | LiF | Check beam intensity and profile run152 h 23.40 | |
|
Fixed | com2019 |
Tue Apr 9 17:23:27 2019 |
Adrien, Valerian, Louis et Thomas | OFFLINE | General | CD2 | Beam was not centered in run 256 | [SIZE=3]Here is the impact matrix in MUST2
for impact matrix for run 256. Beam is not
centered.[/SIZE]
|
 |
Fixed | e744s |
Thu Apr 11 15:16:10 2019 |
Adrien, Valerian, Louis | CATS | General | CH2 | run77 CATS efficiency | CATS efficiency has been computed for run
77 using T_FagHF an T_Si_Cats1 with different
triggers:
|
|
Fixed | e793s |
Wed Mar 10 22:19:22 2021 |
Adrien, Freddy, Wilton and Nigel | OFFLINE | General | CD2 | Offline analysis of run 51 and 52 using ganil files | We noted that the gamma ray efficiency calculated
from file converted from AGATA was close
100%. We concluded that the conversion program |
|