Fixed, e793s, Sun Mar 14 07:58:51 2021, Léo, Serge, Nishu, ONLINE, General, CD2, run62 screenshots at 7h50 11x
summary of run#62
Fixed, e793s, Sun Mar 14 09:53:50 2021, Faïrouz, Juan Lois, RUN, General, CD2, run62 screenshots at 9h54 (14/03/2021) 8x
 
Fixed, e793s, Sun Mar 14 11:06:07 2021, Faïrouz, Juan Lois, BEAM, General, CD2, Slits open again. Beam intensity ~4.8e5 pps run62_Scaler_graph_11h07.png
 
Fixed, e793s, Sun Mar 14 12:02:10 2021, Faïrouz, Juan Lois, RUN, General, CD2, run62 screenshots at 11h57 (14/03/2021) 8x
 
Fixed, e793s, Sun Mar 14 14:26:29 2021, Faïrouz, Juan Lois, RUN, General, CD2, Snapshots 14:20 8x
 
Fixed, e793s, Sun Mar 14 14:52:14 2021, Franco, OFFLINE, General, CD2, Gating above Sn Gate_above_Sn.png
 
Fixed, e793s, Sun Mar 14 14:57:35 2021, Franco, GRIT, General, CD2, LV & HV of Mugast-MUST2 LV_HV_MUST2_14032021.png
For future reference...
Fixed, e793s, Sun Mar 14 15:20:47 2021, Adrien, OFFLINE, General, CD2, Updated Angular distribution macro 
The angular distribution macro has been updated and now produce TWOFNR calculation on the fly.
Feel free to add new plots and play around with the parameter.
 MakePlot will produce the distribution using Ex and sigmaEx of the state and Eg and sigmaG of the gamma. Efficiency is automatically taken into account
Fixed, e793s, Sun Mar 14 15:52:36 2021, Faïrouz, Juan Lois, Wilton, RUN, General, CD2, run62 screenshots at 15h52 (14/03/2021) 8x
 
Fixed, e793s, Sun Mar 14 18:13:28 2021, Miguel, Wilton, Nishu, Dieter, Ablaihan, RUN, General, CD2, run62 screenshots at 18h14 10x
 
Fixed, e793s, Sun Mar 14 20:11:17 2021, Miguel, Wilton, Nishu, Dieter, Ablaihan, RUN, General, CD2, run62 screenshots at 20h00 10x
Beam progressively down from 5 to 4 10^5. Went to PCP, they were losing intensity in the primary beam, from 500 to 400 nA. Working on it (21:30)...
Fixed, e793s, Sun Mar 14 22:01:04 2021, Miguel, Wilton, Ablaihan,nishu, RUN, General, CD2, summary of run 62@22:00hrs 9x
 
Pending, e793s, Mon Mar 15 00:21:18 2021, Sarah, Louis, Charlie, BEAM, General, CD2, Source is running out run62_Scaler_Mar14_00h40.png
The beam intensity spiked to 9x10^9, so Louis called PCP to ask them to reduce it. He was told that the source was almost depleted, and was presented with
two options:
Fixed, e793s, Mon Mar 15 02:08:19 2021, mugast, BEAM, General, CD2, Beam stopped at 2:08 
Beam stopped at 2h08. The PCP want to make some measurement on the source to get its statues. Should take about 10 min.
Fixed, e793s, Mon Mar 15 02:44:06 2021, Sarah, Louis, Charlie, RUN, General, CD2, Beam returned at 02:45 and stabilised by PCP 
The PCP team were not able to learn anything new about the state of the source from their diagnostic tests, but they told us that they have stabilized the
beam so there should be less fluctuations. They have also opened the slits to their maximum, which now gives us 5e5 pps.
Fixed, e793s, Mon Mar 15 03:08:18 2021, Sarah, Louis, Charlie, RUN, General, CD2, Run 62 screenshots at 03h00 8x
Note that Vigru crashed and had to be reopened, so the canvases have only been populated with the data since beam returned at 02h45.
Fixed, e793s, Mon Mar 15 03:37:32 2021, Louis, OFFLINE, General, CD2, Ex vs Eg analysis and C2S ExEg_sum.pngC2S_run62.pnggamma_unbound.pngAnaPlot.png
1) Summary of the the Ex vs Eg analysis with all the gamma ray identified highlighted in red. Green line shows the corresponding position of the excited
states. 
Fixed, e793s, Mon Mar 15 04:57:32 2021, Sarah, Louis, Charlie, RUN, General, CD2, run 62 screenshots at 04h50 8x
The beam intensity has been surprisingly high so far, [URL=https://caeelog.in2p3.fr/MUGAST/6147]considering the news we were given[/URL] about the source
a few hours ago. It has just taken a dip to ~4.5e5 in the last 10 mins or so.
Fixed, e793s, Mon Mar 15 06:27:54 2021, Sarah, Louis, Charlie, BEAM, General, CD2, Beam lost at 06h25. Returned at 06h30 beamdrop_06h25.png
Electrostatic equipment from the source tripped. Should only be a few minutes of interruption.

EDIT:: Beam back after 5 mins. Screenshot attached.
Fixed, e793s, Mon Mar 15 06:59:02 2021, Sarah, Louis, Charlie, RUN, General, CD2, run 62 screenshots at 06h55 8x
Screenshots attached. Note that the fluctuation issues have returned after the "electrostatic trip"(?) but the beam pps remain pretty high.