MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 128 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Source Subjectdown
Fixede744s Mon Apr 15 04:34:25 2019 Fredy, Magda, Mihai, JaromirRUNHardwareCH2Beam interruption /N2 leak/
Alarm (probably N2) appeared 4:30, beam was stopped at 4:34 with an announcement by PCP.


Beam back @ 5:00
Fixede768s Tue Jul 30 01:20:21 2019 Jenn & FrancoBEAMGeneralLiFBeam intensity, profile check and SUMMARY night
In run 158 at around 01:00am PCP took the beam to try to optimize it. We got the beam back after ~15 minutes.

Beam intensity ~1.2e7
OR MUGAST ~ 160
OR VAMOS ~ 650

30 minutes later: comparing the actual beam profile with the previous ones it looks like the beam has shifted on the horizontal axis (before the centroid was -1.9, now it is -3.4).
At the same time we noticed an increase in the AGATA counting rate (~ 35k). AGATA itself is not very stable, each now and then all the detectors go in back pressure for few
seconds and then they come back to the normal status. Moreover we see more counts on the second line in the correlation matrix (see figure attached). We think that maybe
with the last optimization the beam is slightly touching somewhere out of the target.

At 02:15am there was a problem with the vacuum on the PCP side so the beam went off. We wait for a guy to come in ~45min and solve this issue or understand WThell is happening.
RUN 158 won't be stopped to avoid DAQ problems.

TO UNDERSTAND: even after beam stopped 30 min ago, OR Vamos is still counting ~100 Hz while AGATA and MUGAST are counting nothing.
Attachment 1: photo_2019-07-30_00-19-19.jpg
photo_2019-07-30_00-19-19.jpg
Attachment 2: scaler_4.png
scaler_4.png
Attachment 3: correlation.png
correlation.png
Fixede768s Tue Jul 30 04:25:49 2019 Jenn & Franco & TeodoraBEAMGeneralLiFBeam intensity, profile check and SUMMARY night

This is what we were seeing in agata. We think it might be possible we were having a bit of beam implanted somewhere. We called PCP to check.



Jenn & Franco wrote:
In run 158 at around 01:00am PCP took the beam to try to optimize it. We got the beam back after ~15 minutes.

Beam intensity ~1.2e7
OR MUGAST ~ 160
OR VAMOS ~ 650

30 minutes later: comparing the actual beam profile with the previous ones it looks like the beam has shifted on the horizontal axis (before the centroid was -1.9, now it is -3.4).
At the same time we noticed an increase in the AGATA counting rate (~ 35k). AGATA itself is not very stable, each now and then all the detectors go in back pressure for few
seconds and then they come back to the normal status. Moreover we see more counts on the second line in the correlation matrix (see figure attached). We think that maybe
with the last optimization the beam is slightly touching somewhere out of the target.

At 02:15am there was a problem with the vacuum on the PCP side so the beam went off. We wait for a guy to come in ~45min and solve this issue or understand WThell is happening.
RUN 158 won't be stopped to avoid DAQ problems.

TO UNDERSTAND: even after beam stopped 30 min ago, OR Vamos is still counting ~100 Hz while AGATA and MUGAST are counting nothing.
Attachment 1: IMG_20190730_042215.jpg
IMG_20190730_042215.jpg
Fixede768s Wed Jul 17 01:42:46 2019 mugastVAMOSGeneralLiFBeam intensity versus Trigger Vamos
Masque mobile at +7 mm

Beam: 10^5 pps, Fag:10, Trigger VAMOS:10
Beam: 8.10^5 pps, Fag:15, Trigger VAMOS:15
Beam: 10^7 pps, Fag:241, Trigger VAMOS:271
Fixede768s Sat Jul 20 19:24:31 2019 Faïrouz & SylvainRUNGeneralLiFBeam intensity is decreasing.
The beam intensity decreased by half since 19h00 (600 in Vamos-or)due to the primary beam.
The operators are working on it since.
The intensity of 10^7 pps came back at 8 pm.
Intensity measurement with the profiler 1.1x10^7 pps for Or-Vamos=1100
Fixede768s Mon Jul 29 13:46:11 2019 Faïtrouz, Nicolas & FreddyRUNGeneralLiFBeam intensity increased to 7e6 pps
Attachment 1: beam-profile-run156-3.jpg
beam-profile-run156-3.jpg
Attachment 2: Scalers-run156_5.png
Scalers-run156_5.png
Fixede744s Mon Apr 15 13:28:25 2019 Nikola Faïrouz Damien KseniaRUNGeneralCH2Beam intensity increased to 1.8e5 pps
Attachment 1: run128_1_scalers_2.png
run128_1_scalers_2.png
Fixede793s Sat Mar 13 17:41:57 2021 Sarah Louis WiltonRUNGeneralCD2Beam intensity increased
Bertrand saw that the slits were slightly closed, called the PCP and now we have around 5e5 pps
we can see the increase on the figure at 17h20
Attachment 1: Beam_at_17h40.png
Beam_at_17h40.png
Attachment 2: Scalars_at_17h35.png
Scalars_at_17h35.png
Fixede793s Tue Mar 16 01:31:37 2021 Lynda, Cyril, NishuBEAMGeneralCD2Beam intensity increased
We asked for a beam intensity increase around 01h10
The slits L5 were opened and more power (~ 100 W) on primary target
Now ~ 5.6e5 pps on Cats2
Attachment 1: run63_sclalers_01h35.png
run63_sclalers_01h35.png
Fixede793s Sun Mar 14 10:01:36 2021 Juan Lois & faïrouz & AdrienBEAMHardwareCD2Beam intensity escalated up to 1.6e6 pps
At 9:57 the intensity increased up to 1.6e6 pps and we had to call the pcp to put it again to the normal values.

It was solved by 10:07 .

Same incidence happend at 10:17 and then again at 10h30.

The beam operators close little bit the slits to decrease the beam intensity.
The intensity is now 3.e5 pps
Attachment 1: BeanItensityJump_09h57_14_03_21.png
BeanItensityJump_09h57_14_03_21.png
Attachment 2: Scaler_graph_10h47.png
Scaler_graph_10h47.png
Fixede768s Wed Jul 31 14:32:53 2019 Valerian & CoRUNGeneralN/ABeam intensity dropped
unstable beam since 15min... Intensity dropped from 8e6 to 1e5

Edit : Beam is back at 8 10^6 pps
Attachment 1: index.jpg
index.jpg
Attachment 2: scalers_run160_11.png
scalers_run160_11.png
Fixede793s Tue Mar 16 07:22:12 2021 Lynda, Cyril, NishuBEAMGeneralCD2Beam intensity decrease
The beam intensity decreased around 6h55 to less than 1e5 pps
It is due to a change of the state of the source, PCP is working to increase the intensity
Attachment 1: run63_sclalers_07h20_16march.png
run63_sclalers_07h20_16march.png
Fixede768s Sun Jul 21 04:48:52 2019 Jenn & FranckBEAMGeneralN/ABeam intensity check
OR Vamos: 1300 /s
Vamos gas profiler: 1.7x10^7 pps
Fixede768s Sun Jul 21 09:10:50 2019 Didier & NicolasBEAMGeneralN/ABeam intensity check

Jenn & Franck wrote:
OR Vamos: 1300 /s
Vamos gas profiler: 1.7x10^7 pps


OR VAMOS: ~ 1280 Hz
VAMOS gas profiler: 1.7e7 pps
Attachment 1: IMG_20190721_090616_beamcheck.jpg
IMG_20190721_090616_beamcheck.jpg
Fixede768s Sun Jul 21 20:13:57 2019 Kseniia, Franco & NicolasBEAMGeneralN/ABeam intensity check

Didier & Nicolas wrote:

Jenn & Franck wrote:
OR Vamos: 1300 /s
Vamos gas profiler: 1.7x10^7 pps


OR VAMOS: ~ 1280 Hz
VAMOS gas profiler: 1.7e7 pps


OR VAMOS: ~ 1700 Hz
VAMOS gas profiler: 6e6 pps

beam moved in the horizontal plane (compare last 2 pictures of beam profiler)
Attachment 1: IMG_20190721_194258_beamcheck.jpg
IMG_20190721_194258_beamcheck.jpg
Fixede768s Tue Jul 23 09:03:07 2019 Kseniia, Gilbert, YorickBEAMGeneral Beam intensity and screenshots
The beam has been pretty stable since yesterday 
Attachment 1: E1248B05-DA9D-43EF-A7B4-4FAD97F7D0B1.jpeg
E1248B05-DA9D-43EF-A7B4-4FAD97F7D0B1.jpeg
Attachment 2: Screenshot_from_2019-07-23_09-14-34.png
Screenshot_from_2019-07-23_09-14-34.png
Attachment 3: Screenshot_from_2019-07-23_09-14-15.png
Screenshot_from_2019-07-23_09-14-15.png
Attachment 4: Screenshot_from_2019-07-23_09-13-55.png
Screenshot_from_2019-07-23_09-13-55.png
Attachment 5: Screenshot_from_2019-07-23_09-13-35.png
Screenshot_from_2019-07-23_09-13-35.png
Attachment 6: Screenshot_from_2019-07-23_09-13-06.png
Screenshot_from_2019-07-23_09-13-06.png
Attachment 7: Screenshot_from_2019-07-23_09-12-49.png
Screenshot_from_2019-07-23_09-12-49.png
Attachment 8: Screenshot_from_2019-07-23_09-12-33.png
Screenshot_from_2019-07-23_09-12-33.png
Attachment 9: Screenshot_from_2019-07-23_09-12-15.png
Screenshot_from_2019-07-23_09-12-15.png
Attachment 10: Screenshot_from_2019-07-23_09-12-01.png
Screenshot_from_2019-07-23_09-12-01.png
Attachment 11: Screenshot_from_2019-07-23_09-10-57.png
Screenshot_from_2019-07-23_09-10-57.png
Attachment 12: Screenshot_from_2019-07-23_09-10-29.png
Screenshot_from_2019-07-23_09-10-29.png
Attachment 13: Screenshot_from_2019-07-23_09-10-11.png
Screenshot_from_2019-07-23_09-10-11.png
Attachment 14: Screenshot_from_2019-07-23_09-09-41.png
Screenshot_from_2019-07-23_09-09-41.png
Attachment 15: Screenshot_from_2019-07-23_09-09-15.png
Screenshot_from_2019-07-23_09-09-15.png
Attachment 16: Screenshot_from_2019-07-23_09-08-43.png
Screenshot_from_2019-07-23_09-08-43.png
Attachment 17: Screenshot_from_2019-07-23_09-06-56.png
Screenshot_from_2019-07-23_09-06-56.png
Attachment 18: Screenshot_from_2019-07-23_09-05-56.png
Screenshot_from_2019-07-23_09-05-56.png
Attachment 19: Screenshot_from_2019-07-23_09-05-37.png
Screenshot_from_2019-07-23_09-05-37.png
Attachment 20: Screenshot_from_2019-07-23_09-05-19.png
Screenshot_from_2019-07-23_09-05-19.png
Attachment 21: Screenshot_from_2019-07-23_09-05-03.png
Screenshot_from_2019-07-23_09-05-03.png
Attachment 22: Screenshot_from_2019-07-23_09-04-48.png
Screenshot_from_2019-07-23_09-04-48.png
Attachment 23: Screenshot_from_2019-07-23_09-04-34.png
Screenshot_from_2019-07-23_09-04-34.png
Attachment 24: Screenshot_from_2019-07-23_09-02-54.png
Screenshot_from_2019-07-23_09-02-54.png
Attachment 25: Screenshot_from_2019-07-23_09-02-27.png
Screenshot_from_2019-07-23_09-02-27.png
Fixede768s Mon Jul 22 19:34:16 2019 Didier & FrancoRUNGeneralLiFBeam intensity and profile check
Attachment 1: scalers_run126_1.png
scalers_run126_1.png
Attachment 2: a792a9dd-1.jpg
a792a9dd-1.jpg
Fixede768s Tue Jul 23 00:01:23 2019 Freddy, JennBEAMGeneralLiFBeam intensity and profile check
Attachment 1: scalers_run126_3.png
scalers_run126_3.png
Attachment 2: Profile.jpg
Profile.jpg
Fixede768s Tue Jul 23 04:34:03 2019 Jenn & ChristianBEAMGeneral Beam intensity and profile check
VAMOS OR: ~1200
BEAM INTENSITY ~ 2E7
Attachment 1: photo_2019-07-23_03-26-41.jpg
photo_2019-07-23_03-26-41.jpg
Fixede768s Tue Jul 23 06:49:54 2019 Jenn & Christian & KseniiaBEAMGeneral Beam intensity and profile check
VAMOS OR ~ 870
BEAM INTENSITY ~ 1.4E7
Attachment 1: photo_2019-07-23_05-50-19.jpg
photo_2019-07-23_05-50-19.jpg

ELOG Home Page