MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 127 of 132  Not logged in MUGAST
Fixed, e793s, Mon Mar 15 06:27:54 2021, Sarah, Louis, Charlie, BEAM, General, CD2, Beam lost at 06h25. Returned at 06h30 beamdrop_06h25.png
Electrostatic equipment from the source tripped. Should only be a few minutes of interruption.

EDIT:: Beam back after 5 mins. Screenshot attached.
Fixed, e793s, Sun Mar 14 03:28:43 2021, Léo, Serge, Nishu, RUN, General, CD2, Beam lost 3:20-5:55 Screenshot_from_2021-03-14_03-30-10.pngrates_14Mar21_06h04.png
we lost the beam at 03:20, source unstable

5:55 beam back
sequence of several problems, access issue, HF that went down...

now we run with 5.3e5 pps in Cats
Fixed, e744s, Sun Apr 14 02:04:32 2019, Faïrouz, Chloé, Sylvain & Damien, RUN, General, CH2, Beam lost 19x
Beam stopped because of the HF of C01.
L'astreinte va venir. Arrêt estimé une demi-heure ou plus.
On a remarqué sur le spectre impact qu'on a perdu deux strips de plus sur le MUST2 haut-gauche à partir du run 120 6h00 du matin
Fixed, e744s, Wed Apr 17 01:09:45 2019, mugast, BEAM, General, CH2, Beam lost 
About 1:00am we lost the beam.
We call pcp and they will fix in 15 min
At 01:20 we recover the beam
    Fixed, e744s, Wed Apr 17 01:36:01 2019, mugast, BEAM, General, CH2, Beam lost 

mugast wrote:
About 1:00am we lost the beam.
We call pcp and they will fix in 15 min
At 01:20 we recover the beam



At 01:30 we lost other time the beam for 5 min
    Fixed, e744s, Wed Apr 17 02:00:55 2019, mugast, BEAM, General, CH2, Beam lost 

mugast wrote:

mugast wrote:
About 1:00am we lost the beam.
We call pcp and they will fix in 15 min
At 01:20 we recover the beam



At 01:30 we lost other time the beam for 5 min


At 02:00 again and we recovered soon. Seems unstable
Fixed, e793s, Sat Mar 13 11:52:26 2021, Lynda, Laetitia, Chloe, BEAM, General, CD2, Beam lost 
A security problem occurs at a door near CSS1 ( AFR alarm ), need to call the security to fix the problem
The person needs to come so it will take ~1h
Fixed, e793s, Fri Mar 12 08:58:09 2021, Adrien, BEAM, Hardware, CD2, Beam is stopped 8h55 
Beam stopped to fix a leak on the accelerator. Intervention up to 4hours, maybe less.
Fixed, e768s, Fri Jul 19 09:32:45 2019, mugast, BEAM, General, LiF, Beam is fluctuating run_113_temporary_beam_loss.png
There was a temporary beam loss during the run 113
Fixed, e768s, Fri Jul 19 15:55:38 2019, mugast, RUN, General, , Beam is fluctuating 19x
Run 115 stopped at 16h40.
Fixed, e768s, Tue Jul 30 16:22:21 2019, mugast, RUN, General, LiF, Beam is back. Intensity= 7e6 pps. Start a new run : run 160  scalers_run160_1.png20190730_161935.jpg
Run 160.
Fixed, e744s, Sun Apr 14 04:04:33 2019, Faïrouz, Chloé, Sylvain, Damien & Iulia, RUN, General, CH2, Beam is back @ 3e4 pps in CATS run122_1_scalers_v13.png
Fixed, e744s, Sat Apr 13 05:10:01 2019, Mariluz Nikola Nicolas, BEAM, General, CH2, Beam is back @ 2e4 pps (CATS) 
Beam is back, yeah!
Fixed, e793s, Sat Mar 13 14:41:28 2021, Lynda, Laetitia, Chloe, BEAM, General, CD2, Beam is back run62_scaler_graph_14h48.png
Beam is back ~ 14h35, safety problem fixed
PCP said that the source is unstable so the beam intensity will fluctuate
Fixed, e744s, Sun Apr 14 04:11:22 2019, Faïrouz, Chloé, Sylvain, Damien & Iulia, RUN, General, CH2, Beam is @ 6e4 pps in CATS 
Beam Beam is @ 6e4 pps in CATS now but it continuous increasing
Fixed, e786s, Mon Jun 24 05:27:21 2019, Louis, OTHER, General, Cryo-3He, Beam interuption 
Beam stopped due to a neutron excess in a restricted area. Have to call the SPR. At least 1h of interruption..
Fixed, e786s, Wed Jun 26 16:59:07 2019, Louis, BEAM, General, Cryo-3He, Beam interuption 
Beam stopped from 15h to 17h due to source instabilities
Fixed, e793s, Mon Mar 15 16:00:58 2021, Taras, cyril, Léo, ONLINE, General, CD2, Beam interruption at 15h30 run63_sclalers_16h00.pngrun63_graph_16h00.png
Beam interrupted at 15h30 (security alarm), back at around 15h55
Fixed, e793s, Mon Mar 15 15:04:13 2021, Taras, cyril, Léo, ONLINE, General, CD2, Beam interruption at 15h10 run63_sclalers_15h22.pngrun63_graph_15h22.png
Beam interrupted at 15h10 for security problems, back at 15h20
Fixed, e793s, Mon Mar 15 11:19:26 2021, Taras, cyril, Léo, ONLINE, General, CD2, Beam interruption at 11.19 
Due to a safety alert, beam has been interrupted

ELOG Home Page