MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 127 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Source Subjectdown
Fixede793s Mon Mar 15 06:27:54 2021 Sarah, Louis, CharlieBEAMGeneralCD2Beam lost at 06h25. Returned at 06h30
Electrostatic equipment from the source tripped. Should only be a few minutes of interruption.

EDIT:: Beam back after 5 mins. Screenshot attached.
Attachment 1: beamdrop_06h25.png
beamdrop_06h25.png
Fixede793s Sun Mar 14 03:28:43 2021 Léo, Serge, NishuRUNGeneralCD2Beam lost 3:20-5:55
we lost the beam at 03:20, source unstable

5:55 beam back
sequence of several problems, access issue, HF that went down...

now we run with 5.3e5 pps in Cats
Attachment 1: Screenshot_from_2021-03-14_03-30-10.png
Screenshot_from_2021-03-14_03-30-10.png
Attachment 2: rates_14Mar21_06h04.png
rates_14Mar21_06h04.png
Fixede744s Sun Apr 14 02:04:32 2019 Faïrouz, Chloé, Sylvain & DamienRUNGeneralCH2Beam lost
Beam stopped because of the HF of C01.
L'astreinte va venir. Arrêt estimé une demi-heure ou plus.
On a remarqué sur le spectre impact qu'on a perdu deux strips de plus sur le MUST2 haut-gauche à partir du run 120 6h00 du matin
Attachment 1: run122_Vamos11_1.png
run122_Vamos11_1.png
Attachment 2: run122_Vamos11_2.png
run122_Vamos11_2.png
Attachment 3: run122_Vamos11_3.png
run122_Vamos11_3.png
Attachment 4: run122_Vamos11_4.png
run122_Vamos11_4.png
Attachment 5: run122_Vamos11_5.png
run122_Vamos11_5.png
Attachment 6: run122_Vamos11_6.png
run122_Vamos11_6.png
Attachment 7: run122_Vamos11_7.png
run122_Vamos11_7.png
Attachment 8: run122_Vamos11_8.png
run122_Vamos11_8.png
Attachment 9: run122_Vamos11_9.png
run122_Vamos11_9.png
Attachment 10: run122_Vamos11_10.png
run122_Vamos11_10.png
Attachment 11: run122_Vamos11_11.png
run122_Vamos11_11.png
Attachment 12: run122_1_Mugast_11_1.png
run122_1_Mugast_11_1.png
Attachment 13: run122_1_Mugast_11_2.png
run122_1_Mugast_11_2.png
Attachment 14: run122_1_Mugast_11_3.png
run122_1_Mugast_11_3.png
Attachment 15: run122_1_Mugast_11_4.png
run122_1_Mugast_11_4.png
Attachment 16: run122_1_Mugast_11_5.png
run122_1_Mugast_11_5.png
Attachment 17: run122_1_Mugast_11_6.png
run122_1_Mugast_11_6.png
Attachment 18: run122_1_Mugast_11_7.png
run122_1_Mugast_11_7.png
Attachment 19: run122_1_Mugast_11_8.png
run122_1_Mugast_11_8.png
Fixede744s Wed Apr 17 01:09:45 2019 mugastBEAMGeneralCH2Beam lost
About 1:00am we lost the beam.
We call pcp and they will fix in 15 min
At 01:20 we recover the beam
Fixede744s Wed Apr 17 01:36:01 2019 mugastBEAMGeneralCH2Beam lost

mugast wrote:
About 1:00am we lost the beam.
We call pcp and they will fix in 15 min
At 01:20 we recover the beam



At 01:30 we lost other time the beam for 5 min
Fixede744s Wed Apr 17 02:00:55 2019 mugastBEAMGeneralCH2Beam lost

mugast wrote:

mugast wrote:
About 1:00am we lost the beam.
We call pcp and they will fix in 15 min
At 01:20 we recover the beam



At 01:30 we lost other time the beam for 5 min


At 02:00 again and we recovered soon. Seems unstable
Fixede793s Sat Mar 13 11:52:26 2021 Lynda, Laetitia, ChloeBEAMGeneralCD2Beam lost
A security problem occurs at a door near CSS1 ( AFR alarm ), need to call the security to fix the problem
The person needs to come so it will take ~1h
Fixede793s Fri Mar 12 08:58:09 2021 AdrienBEAMHardwareCD2Beam is stopped 8h55
Beam stopped to fix a leak on the accelerator. Intervention up to 4hours, maybe less.
Fixede768s Fri Jul 19 09:32:45 2019 mugastBEAMGeneralLiFBeam is fluctuating
There was a temporary beam loss during the run 113
Attachment 1: run_113_temporary_beam_loss.png
run_113_temporary_beam_loss.png
Fixede768s Fri Jul 19 15:55:38 2019 mugastRUNGeneral Beam is fluctuating
Run 115 stopped at 16h40.
Attachment 1: VAMOS_MUGAST_IDENTIFICATION1.png
VAMOS_MUGAST_IDENTIFICATION1.png
Attachment 2: run_115_scaler3.png
run_115_scaler3.png
Attachment 3: run_115_scaler2.png
run_115_scaler2.png
Attachment 4: run_115_scaler1.png
run_115_scaler1.png
Attachment 5: run_115_IC_IC.png
run_115_IC_IC.png
Attachment 6: run_115_REC.png
run_115_REC.png
Attachment 7: run_115_TAC.png
run_115_TAC.png
Attachment 8: run_115_IC2.png
run_115_IC2.png
Attachment 9: run_115_IC.png
run_115_IC.png
Attachment 10: run_115_Ewire.png
run_115_Ewire.png
Attachment 11: run_115_DCY.png
run_115_DCY.png
Attachment 12: run_115_DCXpng.png
run_115_DCXpng.png
Attachment 13: run_115_MM_MG_ERaw.png
run_115_MM_MG_ERaw.png
Attachment 14: run_115_Tac.png
run_115_Tac.png
Attachment 15: run_115_MG_ToF.png
run_115_MG_ToF.png
Attachment 16: run_115_MM_DeE.png
run_115_MM_DeE.png
Attachment 17: run_115_MM_Tof.png
run_115_MM_Tof.png
Attachment 18: run_115_MG_impact.png
run_115_MG_impact.png
Attachment 19: run_115_MM_impact.png
run_115_MM_impact.png
Fixede768s Tue Jul 30 16:22:21 2019 mugastRUNGeneralLiFBeam is back. Intensity= 7e6 pps. Start a new run : run 160
Run 160.
Attachment 1: scalers_run160_1.png
scalers_run160_1.png
Attachment 2: 20190730_161935.jpg
20190730_161935.jpg
Fixede744s Sun Apr 14 04:04:33 2019 Faïrouz, Chloé, Sylvain, Damien & IuliaRUNGeneralCH2Beam is back @ 3e4 pps in CATS
Attachment 1: run122_1_scalers_v13.png
run122_1_scalers_v13.png
Fixede744s Sat Apr 13 05:10:01 2019 Mariluz Nikola NicolasBEAMGeneralCH2Beam is back @ 2e4 pps (CATS)
Beam is back, yeah!
Fixede793s Sat Mar 13 14:41:28 2021 Lynda, Laetitia, ChloeBEAMGeneralCD2Beam is back
Beam is back ~ 14h35, safety problem fixed
PCP said that the source is unstable so the beam intensity will fluctuate
Attachment 1: run62_scaler_graph_14h48.png
run62_scaler_graph_14h48.png
Fixede744s Sun Apr 14 04:11:22 2019 Faïrouz, Chloé, Sylvain, Damien & IuliaRUNGeneralCH2Beam is @ 6e4 pps in CATS
Beam Beam is @ 6e4 pps in CATS now but it continuous increasing
Fixede786s Mon Jun 24 05:27:21 2019 LouisOTHERGeneralCryo-3HeBeam interuption
Beam stopped due to a neutron excess in a restricted area. Have to call the SPR. At least 1h of interruption..
Fixede786s Wed Jun 26 16:59:07 2019 LouisBEAMGeneralCryo-3HeBeam interuption
Beam stopped from 15h to 17h due to source instabilities
Fixede793s Mon Mar 15 16:00:58 2021 Taras, cyril, LéoONLINEGeneralCD2Beam interruption at 15h30
Beam interrupted at 15h30 (security alarm), back at around 15h55
Attachment 1: run63_sclalers_16h00.png
run63_sclalers_16h00.png
Attachment 2: run63_graph_16h00.png
run63_graph_16h00.png
Fixede793s Mon Mar 15 15:04:13 2021 Taras, cyril, LéoONLINEGeneralCD2Beam interruption at 15h10
Beam interrupted at 15h10 for security problems, back at 15h20
Attachment 1: run63_sclalers_15h22.png
run63_sclalers_15h22.png
Attachment 2: run63_graph_15h22.png
run63_graph_15h22.png
Fixede793s Mon Mar 15 11:19:26 2021 Taras, cyril, LéoONLINEGeneralCD2Beam interruption at 11.19
Due to a safety alert, beam has been interrupted

ELOG Home Page