Fixed, e793s, Fri Mar 12 20:43:38 2021, Cyril, Louis, OFFLINE, General, CD2, DWBA 
|
DBWA analysis have been performed with TWOFNR, here the comparison with data for the 0, 2 and 4 MeV peaks.
1p1/2 (black line) and 0f7/2 (red line) |
Fixed, e793s, Fri Mar 12 20:54:30 2021, mugast, RUN, General, CD2, summary of run 61    
|
|
Fixed, e793s, Fri Mar 12 22:03:31 2021, Nishu, GiB, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 21:00
|
Back to normal around 22:00 after restarting HV 5 to 11 (except 10 which was still on) |
Fixed, e793s, Fri Mar 12 22:26:55 2021, julien, nishu, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 22:24
|
back again to normal, |
Fixed, e793s, Fri Mar 12 22:31:46 2021, julien, nishu, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 22:24 ans again ~ 22:45  
|
back again to normal after restarting the HV
(22:39) |
Fixed, e793s, Fri Mar 12 23:16:16 2021, julien, nishu, RUN, Hardware, CD2, vamos count rate goes down to 0 once again 
|
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:. |
Fixed, e793s, Fri Mar 12 23:27:58 2021, julien, nishu, RUN, General, CD2, summary of run 61    
|
below attached the screenshots of scalers and spectra |
Fixed, e793s, Fri Mar 12 23:54:52 2021, julien, nishu, Faïrouz, VAMOS, Hardware, CD2, Vamos tripped @ 23h35 & fixed
|
|
Fixed, e793s, Sat Mar 13 01:41:21 2021, Juan Lois & faïrouz, RUN, General, CD2, run61 screenshots at 1h40 8x
|
|
Fixed, e793s, Sat Mar 13 02:31:33 2021, Faïrouz, Juan Lois, VAMOS, Hardware, CD2, Vamos tripped @ 2h32 & fixed
|
|
Fixed, e793s, Sat Mar 13 03:50:54 2021, Faïrouz, Juan Lois, RUN, General, CD2, run61 screenshots at 3h44 8x
|
|
Fixed, e793s, Sat Mar 13 05:33:41 2021, Faïrouz, Juan Lois, RUN, General, CD2, run61 screenshots at 5h30 8x
|
|
Fixed, e793s, Sat Mar 13 07:18:10 2021, OttoRun, RUN, General, CD2, Run62
|
*************************
Run : 62
*************************
Start at 2021-03-13 07:17:49.732042
run62. ACQ DT
starting again after centering the beam on the target
Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%
Stop at 2021-03-15 10:05:15.581255
Stop comment: stop run
Stop at 2021-03-17 07:17:25.231024
Stop comment: Vamos stopped writing data at 06:50 |
Fixed, e793s, Sat Mar 13 07:26:40 2021, Faïrouz, Juan Lois, RUN, General, CD2, End of run61 screenshots at 7h20 7x
|
RUN 61 stopped to let Emmanuel fix the AGATA acquisition problem. |
Fixed, e793s, Sat Mar 13 07:29:56 2021, Faïrouz, Juan Lois, AGATA, Software, CD2, AGATA acquisition problem fixed by Emmanuel
|
|
Fixed, e793s, Sat Mar 13 07:31:13 2021, Faïrouz, Juan Lois, RUN, General, CD2, Run 62 scalers
|
|
Fixed, e793s, Sat Mar 13 09:19:14 2021, Lynda, Laetitia, Chloe, ONLINE, General, CD2, run62 screenshots at 9h10 10x
|
Online spectra reset at 9h20 |
Fixed, e793s, Sat Mar 13 10:11:44 2021, Adrien, OFFLINE, General, CD2, Offline analysis of run 51-61 
|
Run 51 to 61 are converted and analysed.
I fixed the gamma/no gamma normalisation after binning change.
We clearly see :
a state at 2.5 MeV that decay directly to the g.s. and a state at around 5 MeV with a 3 gamma cascade.
To do list:
- Add an angle dist in AngDist.C macro for the states around 2MeV (you can remove the Ex plot)
- Put Logy in all the canvas for the angle dist;)
- create a new macro showing the EDC 1D histo gated on several sliding windows in Ex to see the the gamma peak changing height
- add arrow or line indication the gamma rays position on every plots
- build the level scheme based on this (there is a preliminary scheme posted earlier by Manu based on gamma-gamma). |
Fixed, e793s, Sat Mar 13 10:14:16 2021, Lynda, Laetitia, Chloe, VAMOS, General, , Vamos tripped @ 10:10 & fixed
|
Vamos tripped around 10:10. we switched back 3 HV on
Online spectra reset to check |
Fixed, e793s, Sat Mar 13 11:16:38 2021, Lynda, Laetitia, Chloe, BEAM, General, , beam lost and back
|
we loose the beam around 11:12, it should be back in few minutes according to pcp.
11:18: the beam is back (3.5E5 pps) |
|