MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 126 of 132  Not logged in MUGAST
Fixed, e768s, Mon Jul 29 17:49:18 2019, Freddy, Sylvain, RUN, General, LiF, Beam status 
At about 17:15 beam suddenly stopped. PCP operators are investigating the issue.
Fixed, e793s, Mon Mar 15 02:44:06 2021, Sarah, Louis, Charlie, RUN, General, CD2, Beam returned at 02:45 and stabilised by PCP 
The PCP team were not able to learn anything new about the state of the source from their diagnostic tests, but they told us that they have stabilized the
beam so there should be less fluctuations. They have also opened the slits to their maximum, which now gives us 5e5 pps.
Fixed, e768s, Mon Jul 22 08:29:19 2019, Faïrouz, Sylvain, Francois et Franck, Bertrand, BEAM, General, LiF, Beam profile updated index.jpgscalers_run124_0.png
To solve the very high counting rate observed on AGATA (and on MUST2 with a lesser degree), the beam was retuned. 

After inspection of the beam profile in VAMOS, Bertrand tuned the vertical steerers G1.DC21-VE (from 0.5 -> 0.0A). The consequence is a shift of 2mm in
Fixed, e768s, Sun Jul 28 01:49:25 2019, Jenn and Andres, ONLINE, General, LiF, Beam profile and scaler run 154 overnight Scalers_run154_6.pngBeam_profiler.jpg
OR VAMOS ~ 500
BEAM Profiler ~ 1.4e7
Fixed, e768s, Mon Jul 29 15:58:53 2019, Freddy, Sylvain, BEAM, General, N/A, Beam profile and scaler r156  Scalers-run156_6.png20190729_155640.jpg
beam down to 3.4*10^6 pps at 16h00 (or VAMOS 200 pps)
Fixed, e768s, Wed Jul 31 08:16:34 2019, Sylvain, Nicolas, BEAM, General, LiF, Beam profile and scaler at 08:00 index.jpgscalers_run160_10.png
 
Fixed, e768s, Sat Jul 27 14:10:49 2019, Fairouz, Beyhan, Daniele, RUN, General, LiF, Beam profile and scaler 154 @ 14h10 Beam-profile-154-1.jpgscaler-run154.png20190727_133807.jpgIMG_3506.jpg
mugast
Fixed, e768s, Sat Jul 27 07:02:44 2019, Sylvain & Andrea, ONLINE, General, LiF, Beam profile and scaler 
 
Fixed, e768s, Mon Jul 22 11:42:22 2019, Marlène, François D, Franck, BEAM, General, LiF, Beam profile and intensity IMG_20190722_113900.jpg
Intensity = 1.8e7 pps

Slight shifts in x and y compared to this morning 8:30
Fixed, e768s, Mon Jul 29 15:20:50 2019, Sylvain Andres, Freddy, Adrien, Franck, BEAM, General, LiF, Beam profile after beam intensity obtimisation index.jpg
Beam recover at around 15:00 after beam optimisation by PCP
Fixed, e768s, Wed Jul 31 03:22:42 2019, Freddy, Chloé, BEAM, General, , Beam profile (run160) @2h24 20190731_022419.jpg
 
Fixed, e768s, Tue Jul 30 23:46:25 2019, Faïrouz & Ksenia, RUN, General, LiF, Beam profile & scalers (run160) @23h45 scalers_run160_5.png20190730_235130-23h54.jpg
 
Fixed, e768s, Tue Jul 30 21:36:43 2019, Faïrouz & Ksenia, RUN, General, LiF, Beam profile & scalers (run160) @21h36 20190730_213330-21h35.jpgscalers_run160_4.png
 
Fixed, e768s, Wed Jul 31 14:07:24 2019, Sylvain & Nicolas, BEAM, General, LiF, Beam profile & scalers 20190731_135809.jpg
 
Fixed, e768s, Sat Jul 20 14:32:18 2019, Nicolas, BEAM, General, LiF, Beam profile & intensity (run 117 @ 14h30) IMG_20190720_142852.jpg
Beam intensity: 1.4e7 pps
VAMOS: ~ 1200
Fixed, e768s, Mon Jul 22 10:01:12 2019, Franck, François D, BEAM, General, LiF, Beam profile IMG_20190722_095235.jpg
Slight shift in vertical +1 mm (with respect to this morning at 8:30)?

Intensity = 1.7e7 pps
Fixed, e768s, Mon Jul 22 14:45:34 2019, François D, Franck, BEAM, General, LiF, Beam profile Beam_profile_run125_22July2019_14h39.jpg
Intensity = 1.3e7 pps

Beam position shift compared to this morning 8:30
Fixed, e768s, Tue Jul 23 11:02:54 2019, Kseniia, Gilbert, BEAM, General, , Beam profile FF0E1C03-CD2A-4BAB-8E82-26422F7EB866.jpegScreenshot_from_2019-07-23_11-04-17.pngScreenshot_from_2019-07-23_11-04-05.png
 
Fixed, e768s, Sun Jul 28 04:22:15 2019, Jenn, Andres and Daniele, BEAM, General, N/A, Beam problems and DC trip IMG_20190728_043633.jpg
- Updated from PCP about the problem with the beam: cyclotron went down and estimation of ~5h to have the beam back.
- After the beam went down, the Drift Chambers tripped making all the other biases go down (crate problem?). We tried to recover the biases but they don't
go up. We decided not to call Diego at the moment, as the beam will take long to come back. We will call him when we have more news from PCP.
    Fixed, e768s, Sun Jul 28 14:57:26 2019, Franco & Sylvain, BEAM, General, N/A, Beam problems and DC trip 
The HV and the vacuum in VAMOS are now recovered and back to the normal values. The water tray is 20% filled and under control. Mugast voltages and currents
seem all ok.
Latest news from PCP are that they are still tuning CSS1 and CSS2. Updates concerning the beam schedule are for the moment no more optimistic than before.

ELOG Home Page