Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e793s |
Fri Mar 12 20:43:38 2021 |
Cyril, Louis | OFFLINE | General | CD2 | DWBA |
DBWA analysis have been performed with TWOFNR, here the comparison with data for the 0, 2 and 4 MeV peaks.
1p1/2 (black line) and 0f7/2 (red line) |
Attachment 1: DWBA.png
|
|
Attachment 2: DWBA2.png
|
|
Fixed | e793s |
Fri Mar 12 20:54:30 2021 |
mugast | RUN | General | CD2 | summary of run 61 |
|
Attachment 1: scalers.png
|
|
Attachment 2: vamos.png
|
|
Attachment 3: Screenshot_from_2021-03-12_20-57-53.png
|
|
Attachment 4: Screenshot_from_2021-03-12_20-58-15.png
|
|
Attachment 5: Screenshot_from_2021-03-12_20-58-45.png
|
|
Fixed | e793s |
Fri Mar 12 22:03:31 2021 |
Nishu, GiB | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 21:00 |
Back to normal around 22:00 after restarting HV 5 to 11 (except 10 which was still on) |
Attachment 1: Screenshot_from_2021-03-12_22-07-22.png
|
|
Fixed | e793s |
Fri Mar 12 22:26:55 2021 |
julien, nishu | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 22:24 |
back again to normal, |
Fixed | e793s |
Fri Mar 12 22:31:46 2021 |
julien, nishu | VAMOS | Hardware | CD2 | VAMOS tripped @ ~ 22:24 ans again ~ 22:45 |
back again to normal after restarting the HV
(22:39) |
Attachment 1: vamos_nc.png
|
|
Attachment 2: Screenshot_from_2021-03-12_22-33-47.png
|
|
Attachment 3: Screenshot_from_2021-03-12_22-47-38.png
|
|
Fixed | e793s |
Fri Mar 12 23:16:16 2021 |
julien, nishu | RUN | Hardware | CD2 | vamos count rate goes down to 0 once again |
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:. |
Attachment 1: IMG20210312231358.jpg
|
|
Attachment 2: IMG20210312230429.jpg
|
|
Fixed | e793s |
Fri Mar 12 23:27:58 2021 |
julien, nishu | RUN | General | CD2 | summary of run 61 |
below attached the screenshots of scalers and spectra |
Attachment 1: Screenshot_from_2021-03-12_23-31-23.png
|
|
Attachment 2: Screenshot_from_2021-03-12_23-31-07.png
|
|
Attachment 3: Screenshot_from_2021-03-12_23-30-43.png
|
|
Attachment 4: Screenshot_from_2021-03-12_23-30-22.png
|
|
Attachment 5: Screenshot_from_2021-03-12_23-29-52.png
|
|
Fixed | e793s |
Fri Mar 12 23:54:52 2021 |
julien, nishu, Faïrouz | VAMOS | Hardware | CD2 | Vamos tripped @ 23h35 & fixed |
|
Fixed | e793s |
Sat Mar 13 01:41:21 2021 |
Juan Lois & faïrouz | RUN | General | CD2 | run61 screenshots at 1h40 |
|
Attachment 1: run61_TAC_01h35.png
|
|
Attachment 2: run61_MG_ToF_01h35.png
|
|
Attachment 3: run61_MM_DeE_01h35.png
|
|
Attachment 4: run61_MM_ToF_01h35.png
|
|
Attachment 5: run61_MG_IMPACT_MATRIX_01h35.png
|
|
Attachment 6: run61_Vamos-MW_01h35.png
|
|
Attachment 7: run61_MM_IMPACT_MATRIX_01h35.png
|
|
Attachment 8: run61_Scalers_01h34.png
|
|
Fixed | e793s |
Sat Mar 13 02:31:33 2021 |
Faïrouz, Juan Lois | VAMOS | Hardware | CD2 | Vamos tripped @ 2h32 & fixed |
|
Fixed | e793s |
Sat Mar 13 03:50:54 2021 |
Faïrouz, Juan Lois | RUN | General | CD2 | run61 screenshots at 3h44 |
|
Attachment 1: Run61_scalers_03h44.png
|
|
Attachment 2: Run61_MG_IMPACT_03h44.png
|
|
Attachment 3: Run61_MM_ToF_03h44.png
|
|
Attachment 4: Run61_MM_DeE_03h44.png
|
|
Attachment 5: Run61_NG_TOF_03h44.png
|
|
Attachment 6: Run61_TAC_03h44.png
|
|
Attachment 7: Run61_VAMOS_MW_03h44.png
|
|
Attachment 8: Run61_MM_IMPACT_03h44.png
|
|
Fixed | e793s |
Sat Mar 13 05:33:41 2021 |
Faïrouz, Juan Lois | RUN | General | CD2 | run61 screenshots at 5h30 |
|
Attachment 1: run61_scalers_05h30.png
|
|
Attachment 2: run61_MM_IMPACT_05h30.png
|
|
Attachment 3: run61_VAMOS_MW_05h30.png
|
|
Attachment 4: run61_TAC_05h30.png
|
|
Attachment 5: run61_MG_ToF_05h30.png
|
|
Attachment 6: run61_MM_DeE_05h30.png
|
|
Attachment 7: run61_MM_ToF_05h30.png
|
|
Attachment 8: run61_MG_IMPACT_5h30.png
|
|
Fixed | e793s |
Sat Mar 13 07:18:10 2021 |
OttoRun | RUN | General | CD2 | Run62 |
*************************
Run : 62
*************************
Start at 2021-03-13 07:17:49.732042
run62. ACQ DT
starting again after centering the beam on the target
Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%
Stop at 2021-03-15 10:05:15.581255
Stop comment: stop run
Stop at 2021-03-17 07:17:25.231024
Stop comment: Vamos stopped writing data at 06:50 |
Fixed | e793s |
Sat Mar 13 07:26:40 2021 |
Faïrouz, Juan Lois | RUN | General | CD2 | End of run61 screenshots at 7h20 |
RUN 61 stopped to let Emmanuel fix the AGATA acquisition problem. |
Attachment 1: run61_MG_IMPACT_7h20.png
|
|
Attachment 2: run61_MM_ToF_7h20.png
|
|
Attachment 3: run61_MM_DeE_7h20.png
|
|
Attachment 4: run61_MG_ToF_7h20.png
|
|
Attachment 5: run61_TAC_7h20.png
|
|
Attachment 6: run61_Vamos-MW_7h20.png
|
|
Attachment 7: run62_MM_IMPACT_7h20.png
|
|
Fixed | e793s |
Sat Mar 13 07:29:56 2021 |
Faïrouz, Juan Lois | AGATA | Software | CD2 | AGATA acquisition problem fixed by Emmanuel |
|
Fixed | e793s |
Sat Mar 13 07:31:13 2021 |
Faïrouz, Juan Lois | RUN | General | CD2 | Run 62 scalers |
|
Attachment 1: run62_scaler_7h20.png
|
|
Fixed | e793s |
Sat Mar 13 09:19:14 2021 |
Lynda, Laetitia, Chloe | ONLINE | General | CD2 | run62 screenshots at 9h10 |
Online spectra reset at 9h20 |
Attachment 1: run62_MG_IMPACT_9h10.png
|
|
Attachment 2: run62_MM_ToF_9h10.png
|
|
Attachment 3: run62_MM_DeE_9h10.png
|
|
Attachment 4: run62_MG_ToF_9h10.png
|
|
Attachment 5: run62_TAC_9h10.png
|
|
Attachment 6: run62_FSC_9h10.png
|
|
Attachment 7: run62_Vamos-MW_9h10.png
|
|
Attachment 8: run62_MM_IMPACT_9h10.png
|
|
Attachment 9: run62_Theta_E_9h10.png
|
|
Attachment 10: run62_scaler_9h15.png
|
|
Fixed | e793s |
Sat Mar 13 10:11:44 2021 |
Adrien | OFFLINE | General | CD2 | Offline analysis of run 51-61 |
Run 51 to 61 are converted and analysed.
I fixed the gamma/no gamma normalisation after binning change.
We clearly see :
a state at 2.5 MeV that decay directly to the g.s. and a state at around 5 MeV with a 3 gamma cascade.
To do list:
- Add an angle dist in AngDist.C macro for the states around 2MeV (you can remove the Ex plot)
- Put Logy in all the canvas for the angle dist;)
- create a new macro showing the EDC 1D histo gated on several sliding windows in Ex to see the the gamma peak changing height
- add arrow or line indication the gamma rays position on every plots
- build the level scheme based on this (there is a preliminary scheme posted earlier by Manu based on gamma-gamma). |
Attachment 1: Plot51-61.png
|
|
Attachment 2: Angle51-61.png
|
|
Fixed | e793s |
Sat Mar 13 10:14:16 2021 |
Lynda, Laetitia, Chloe | VAMOS | General | | Vamos tripped @ 10:10 & fixed |
Vamos tripped around 10:10. we switched back 3 HV on
Online spectra reset to check |
Attachment 1: run62_scaler_9h16.png
|
|
Fixed | e793s |
Sat Mar 13 11:16:38 2021 |
Lynda, Laetitia, Chloe | BEAM | General | | beam lost and back |
we loose the beam around 11:12, it should be back in few minutes according to pcp.
11:18: the beam is back (3.5E5 pps) |