MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 126 of 132  Not logged in MUGAST
Statusdown ExpNbr Date Author Type Category Target-Source Subject
Fixede793s Fri Mar 12 20:43:38 2021 Cyril, LouisOFFLINEGeneralCD2DWBA
DBWA analysis have been performed with TWOFNR, here the comparison with data for the 0, 2 and 4 MeV peaks.
1p1/2 (black line) and 0f7/2 (red line)
Fixede793s Fri Mar 12 20:54:30 2021 mugastRUNGeneralCD2summary of run 61
Fixede793s Fri Mar 12 22:03:31 2021 Nishu, GiBVAMOSHardwareCD2 VAMOS tripped @ ~ 21:00
Back to normal around 22:00 after restarting HV 5 to 11 (except 10 which was still on)
Fixede793s Fri Mar 12 22:26:55 2021 julien, nishuVAMOSHardwareCD2VAMOS tripped @ ~ 22:24
back again to normal,
Fixede793s Fri Mar 12 22:31:46 2021 julien, nishuVAMOSHardwareCD2VAMOS tripped @ ~ 22:24 ans again ~ 22:45
back again to normal after restarting the HV
(22:39)
Fixede793s Fri Mar 12 23:16:16 2021 julien, nishuRUNHardwareCD2vamos count rate goes down to 0 once again
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:.
Fixede793s Fri Mar 12 23:27:58 2021 julien, nishuRUNGeneralCD2summary of run 61
below attached the screenshots of scalers and spectra
Fixede793s Fri Mar 12 23:54:52 2021 julien, nishu, FaïrouzVAMOSHardwareCD2Vamos tripped @ 23h35 & fixed
Fixede793s Sat Mar 13 01:41:21 2021 Juan Lois & faïrouzRUNGeneralCD2run61 screenshots at 1h40
Fixede793s Sat Mar 13 02:31:33 2021 Faïrouz, Juan LoisVAMOSHardwareCD2Vamos tripped @ 2h32 & fixed
Fixede793s Sat Mar 13 03:50:54 2021 Faïrouz, Juan LoisRUNGeneralCD2run61 screenshots at 3h44
Fixede793s Sat Mar 13 05:33:41 2021 Faïrouz, Juan LoisRUNGeneralCD2run61 screenshots at 5h30
Fixede793s Sat Mar 13 07:18:10 2021 OttoRunRUNGeneralCD2Run62
*************************
Run : 62
*************************

Start at 2021-03-13 07:17:49.732042

run62. ACQ DT


starting again after centering the beam on the target

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-15 10:05:15.581255
Stop comment: stop run

Stop at 2021-03-17 07:17:25.231024
Stop comment: Vamos stopped writing data at 06:50
Fixede793s Sat Mar 13 07:26:40 2021 Faïrouz, Juan LoisRUNGeneralCD2End of run61 screenshots at 7h20
RUN 61 stopped to let Emmanuel fix the AGATA acquisition problem.
Fixede793s Sat Mar 13 07:29:56 2021 Faïrouz, Juan LoisAGATASoftwareCD2AGATA acquisition problem fixed by Emmanuel
Fixede793s Sat Mar 13 07:31:13 2021 Faïrouz, Juan LoisRUNGeneralCD2Run 62 scalers
Fixede793s Sat Mar 13 09:19:14 2021 Lynda, Laetitia, ChloeONLINEGeneralCD2run62 screenshots at 9h10
Online spectra reset at 9h20
Fixede793s Sat Mar 13 10:11:44 2021 AdrienOFFLINEGeneralCD2Offline analysis of run 51-61
Run 51 to 61 are converted and analysed.
I fixed the gamma/no gamma normalisation after binning change.

We clearly see :
a state at 2.5 MeV that decay directly to the g.s. and a state at around 5 MeV with a 3 gamma cascade.

To do list:
- Add an angle dist in AngDist.C macro for the states around 2MeV (you can remove the Ex plot)
- Put Logy in all the canvas for the angle dist;)
- create a new macro showing the EDC 1D histo gated on several sliding windows in Ex to see the the gamma peak changing height
- add arrow or line indication the gamma rays position on every plots
- build the level scheme based on this (there is a preliminary scheme posted earlier by Manu based on gamma-gamma).
Fixede793s Sat Mar 13 10:14:16 2021 Lynda, Laetitia, ChloeVAMOSGeneral Vamos tripped @ 10:10 & fixed
Vamos tripped around 10:10. we switched back 3 HV on
Online spectra reset to check
Fixede793s Sat Mar 13 11:16:38 2021 Lynda, Laetitia, ChloeBEAMGeneral beam lost and back
we loose the beam around 11:12, it should be back in few minutes according to pcp.

11:18: the beam is back (3.5E5 pps)

ELOG Home Page