MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 125 of 132  Not logged in MUGAST
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Date Author Type Category Target-Source Subject Text Attachments
Fixede793s Fri Mar 12 02:01:52 2021 Taras, Nishu, Chloe, CharlieRUNGeneralCD2run56 screenshots at 02h10screenshots of run 56 attached below  10x 
Fixede793s Fri Mar 12 03:21:01 2021 Taras, Chloe, NIshu, CharlieVAMOSGeneralCD2VAMOS trip, requires help (FIXED @ 03:55)We received a call from PCP telling us that
VAMOS has tripped. Currents on all focal
planes are 0. We tried stopping and restarting
 PXL_20210312_020550869.jpgPXL_20210312_024401845.jpg 
Fixede793s Fri Mar 12 03:57:46 2021 Taras, Nishu, Chloe, CharlieVAMOSGeneralCD2dipole issue fixedthe alimentation on dipole (G1.G.D4.P) was
turned off,
the value was resetted(322.6) and works fine
 run56_dipolefixed.png 
Fixede793s Fri Mar 12 04:19:51 2021 Taras, Nishu, Chloe, CharlieRUNGeneralCD2run56 screenshots at 04h18Images attached.   14x 
Fixede793s Fri Mar 12 06:23:44 2021 Taras, Nishu, Chloe, CharlieRUNGeneralCD2run56 screenshots at 06h15Screenshots attached  10x 
Fixede793s Fri Mar 12 08:58:09 2021 AdrienBEAMHardwareCD2Beam is stopped 8h55Beam stopped to fix a leak on the accelerator.
Intervention up to 4hours, maybe less.
  
Fixede793s Fri Mar 12 09:52:01 2021 mugast (Sarah, Louis)OFFLINEGeneralCD2Offline analysis run up to 56 8am1) A high energy gamma has been identified
at 3505 keV by gating on 3-5 MeV range in
excitation energy. This transition is unknown
 AngDisrtib.png3MeV_gamma.pngAWBA.png 
Fixede793s Fri Mar 12 09:55:30 2021 FrancoGRITGeneralCD2MM5The first plot attached has been done by artificially
removing 7 deg in theta lab, just to see
if the the kinematic lines of 47K(d,d) and
 square_shifted_theta.pngsquare_shifted_Z.png 
Fixede793s Fri Mar 12 09:57:30 2021 AdrienOTHERSocialN/ALost phone in agata counting roomSomeone lost his/her phone in the agata counting
room. Pictures attached.
 161C9D73-3ED8-49DE-A1EF-4ED9AA11C912.jpeg 
Fixede793s Fri Mar 12 10:07:29 2021 mugastMECHHardware Leak
https://www.hometree.co.uk/energy-advice/home-cover/common-water-leaks-and-how-to-fix-them.html
  
Fixede793s Fri Mar 12 10:32:41 2021 OttoRunRUNGeneralCD2Run57*************************
  [SIZE=3][B]Run  : 57[/B][/SIZE]
*************************
  
Fixede793s Fri Mar 12 10:52:46 2021 AdrienVAMOSHardwareN/AQ pole trip in vamosQ-Pole tripped this night around 4am at the
same time as the dipole but was switch on
again only at 9am.
  
Ongoinge793s Fri Mar 12 12:58:10 2021 Emmanuel COFFLINEGeneral Gamma Gamma Analysis   7x 
Fixede793s Fri Mar 12 13:40:59 2021 OttoRunRUNGeneralCD2Run59*************************
  [SIZE=3][B]Run  : 59[/B][/SIZE]
*************************
  
Fixede793s Fri Mar 12 15:19:35 2021 OttoRunRUNGeneralCD2Run60*************************
  [SIZE=3][B]Run  : 60[/B][/SIZE]
*************************
  
Pinnede793s Fri Mar 12 15:48:35 2021 AdrienRUNGeneralN/AVamos D and Q value and MW HV     
Pinnede793s Fri Mar 12 15:50:12 2021 AdrienRUNGeneralN/AVamos D and Q value and MW HV Attached are the value for D and Q pole of
vamos in case they trip.
Also attached is the computer driving the
 1613EC0C-1F4A-4933-B90A-D98A37421BFF.jpeg4ACA3448-35FF-472C-977C-E642B4ADE6A6.jpeg 
Fixede793s Fri Mar 12 15:52:15 2021 AdrienRUNGeneralN/Ato do during run[B]Every 1-2h:[/B]

[B]Online: take screen shot of[/B]
  
Fixede793s Fri Mar 12 16:58:43 2021 OttoRunRUNGeneralCD2Run61*************************
  [SIZE=3][B]Run  : 61[/B][/SIZE]
*************************
  
Fixede793s Fri Mar 12 18:42:51 2021 Sarah, LouisBEAMGeneralCD2Beam BackThe beam is back at 18h40
The beam stopped due to source problems,
going up steadily, currently at ~2e5 pps
  

ELOG Home Page