Statusdown ExpNbr Date Author Type Category Target-Source Subject
Fixede793s Thu Mar 11 03:37:45 2021 LouisOFFLINEGeneralCD2Offline analyis run 53
1) Some angular distribution were extracted (without any efficiency corrections) with gate on Ex btw 0 and 2 MeV (where p orbitals are populated) and btw 2 and 4 MeV (where f orbitals are populated). More counts are observed btw 110 and 120 degrees in Lab angle with the 0-2MeV gate compared to the 2-4MeV gate which is expected from the AWBA calculus. Kinematic cuts the large angles at high excitation energies. Geometrical efficiency is needed to compare this angular range. Looks like we well distinguish L=1 and L=3 transfers.

2) Some gamma spectra obtained with Ex gate btw -1 and 1, 1 and 3, 3 and 5 MeV.

3) Some strange horizontal lines are observed in the E-TOF id in MUST2. The spectra was obtained with gate on the promt signal in vamos so it can not be the beam intercepting directly must2...

4) the Ex vs Eg matrix
Attachment 1: AngDistrib.png
AngDistrib.png
Attachment 2: Eg_Ex.png
Eg_Ex.png
Attachment 3: ETofMM.png
ETofMM.png
Attachment 4: ExEg.png
ExEg.png
Attachment 5: Ex_Theta.png
Ex_Theta.png
Fixede793s Thu Mar 11 04:34:58 2021 ablaihan, louisCATSHardwareCD2CATS and VAMOS tripped
at 4h15 CATS and VAMOS tripped probably due to too high beam intensity (~1.2x10^6 pps). We switched them on again at 4h30. All the 6 CATS in Board2 in HV by 525 V instead of 530 V.

We did not stop the run to not risk to crash the RCC. Events btw 4h15 and 4h30 will therefore have no time.
Attachment 1: Scaler_run53_4h30.png
Scaler_run53_4h30.png
Fixede793s Thu Mar 11 04:38:31 2021 Ablaihan, LouisBEAMGeneralCD2Beam stopped due to a equipment tripped in CSS1
Beam stopped 4h30 due to a equipment tripped in CSS1. They are going to fix it. Estimated timing of the intervention ~10/20min.
Beam went back at 4h52 at 3.5x10^5 pps in CATS and 3.0x10^5 pps in VAMOS. transmision ~ 85%
Attachment 1: Scaler_run53_4h30.png
Scaler_run53_4h30.png
Fixede793s Thu Mar 11 05:12:36 2021 Ablaihan, LouisRUNGeneralCD2run 53 new screenshots
Attachment 1: run53_1_MMMG_T.png
run53_1_MMMG_T.png
Attachment 2: run53_1_MM_Impact.png
run53_1_MM_Impact.png
Attachment 3: run53_1_MG_impact.png
run53_1_MG_impact.png
Fixede793s Thu Mar 11 09:04:38 2021 adrienONLINEGeneralCD2Elastic scattering in MM5
looking at E vs strip number in MM5 we see clearly the pp and dd elastic scattering.
Attachment 1: run53_mm5_elastic.png
run53_mm5_elastic.png
Fixede793s Thu Mar 11 09:17:17 2021 Nicolas, Lynda, CharlieRUNGeneralCD2run 53 new screenshots
Attachment 1: run53_mm_impact_matrix_01.png
run53_mm_impact_matrix_01.png
Attachment 2: run53_vamos_01.png
run53_vamos_01.png
Attachment 3: run53_tac_01.png
run53_tac_01.png
Attachment 4: run53_mg_e_tof_01.png
run53_mg_e_tof_01.png
Attachment 5: run53_mm_de_e_01.png
run53_mm_de_e_01.png
Attachment 6: run53_mm_e_tof_01.png
run53_mm_e_tof_01.png
Attachment 7: run53_mg_impact_matrix_01.png
run53_mg_impact_matrix_01.png
Fixede793s Thu Mar 11 09:43:56 2021 OttoRunRUNGeneralCD2Run54
*************************
Run : 54
*************************

Start at 2021-03-11 09:42:58.222892

Production run.

(ATC6 crystal stopped)

Beam: 2.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-11 10:15:45.347353
Stop comment: AGATA DAQ did not start
Fixede793s Thu Mar 11 10:18:48 2021 OttoRunRUNGeneralCD2Run55
*************************
Run : 55
*************************

Start at 2021-03-11 10:17:52.398357

Production run.

(ATC6 crystal stopped)
New beam tune with better centering from Bertrand

Beam: 2.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-11 11:23:27.810702
Stop comment: beam tuning by Bertrand to center it
Fixede793s Thu Mar 11 10:25:30 2021 Nicolas, Lynda, CharlieRUNGeneralCD2run 55 screenshots
Start of run, so scaler only - low stats in vigru plots
Attachment 1: run54_start_Scalers.png
run54_start_Scalers.png
Fixede793s Thu Mar 11 11:07:05 2021 mugastOFFLINEGeneralCD2run53 - Egamma vs Ex
Attachment 1: Egamma_vs_Ex_run53.png
Egamma_vs_Ex_run53.png
Fixede793s Thu Mar 11 11:20:35 2021 Nicolas, Lynda, CharlieBEAMGeneralCD2End of run 55
MM impact matrix after tuning to center the beam by Bertrand
Attachment 1: run54_MM_impact_matrx.png
run54_MM_impact_matrx.png
Fixede793s Thu Mar 11 11:25:33 2021 OttoRunRUNGeneralCD2Run56
*************************
Run : 56
*************************

Start at 2021-03-11 11:25:08.768341

Production run.

(ATC6 crystal stopped)
New beam tune with better centering from Bertrand

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-12 08:55:44.216996
Stop comment: 8h55 beam is stopped to repair a leak. probably 4h intervention
Fixede793s Thu Mar 11 12:11:16 2021 Freddy AdrienOFFLINEGeneralN/AElastic - Fixed MM5 position
We roughly fixed the position of MM5 in the mugast.detector file.

Kinematic line for elastic channels are now clearly visible.
Attachment 1: ELabThetaLabwithElastic.png
ELabThetaLabwithElastic.png
Fixede793s Thu Mar 11 12:39:01 2021 Nicolas, Lynda, Charlie, SarahRUNGeneralCD2run 56 screenshots
Attachment 1: run56_mm_impact_matrix_01.png
run56_mm_impact_matrix_01.png
Attachment 2: run56_vamos_01.png
run56_vamos_01.png
Attachment 3: run56_tac_01.png
run56_tac_01.png
Attachment 4: run56_mg_e_tof_01.png
run56_mg_e_tof_01.png
Attachment 5: run56_mm_de_e_01.png
run56_mm_de_e_01.png
Attachment 6: run56_mm_e_tof_01.png
run56_mm_e_tof_01.png
Attachment 7: run56_mg_impact_matrix_01.png
run56_mg_impact_matrix_01.png
Fixede793s Thu Mar 11 15:26:37 2021 Nicolas, Lynda, Charlie, SarahRUNGeneralCD2run 56 screenshots 15h30
online histograms reset around 15h45
Attachment 1: run56_mg_impact_matrix_02.png
run56_mg_impact_matrix_02.png
Attachment 2: run56_mm_de_e_02.png
run56_mm_de_e_02.png
Attachment 3: run56_mg_e_tof_02.png
run56_mg_e_tof_02.png
Attachment 4: run56_tac_02.png
run56_tac_02.png
Attachment 5: run56_FSC_02.png
run56_FSC_02.png
Attachment 6: run56_vamos_02.png
run56_vamos_02.png
Attachment 7: run56_mm_impact_matrix_02.png
run56_mm_impact_matrix_02.png
Attachment 8: run56_scaler_15h30.png
run56_scaler_15h30.png
Fixede793s Thu Mar 11 15:48:14 2021 mugastOFFLINEGeneralN/ABeam energy and Beta
Beam energy entering G1: 7.6922 MeV/u (Beta= 0.1277)

CATS2 thickness: 2.8 um of Mylar in total + about 4 cm of isobutane at 4 mbar
7.62783 / 7.61264 / 7.54789

Beam energy after CATS: 7.54789 MeV/u (Beta= 0.1265)

Beam at mid CD2 target : 7.45118 MeV/u (Beta= 0.1257)

Beam after target: 7.35381 MeV/u (Beta= 0.1249)
Fixede793s Thu Mar 11 17:32:07 2021 Faïrouz, Franco, SarahRUNGeneralCD2run 56 screenshots 17h30
Attachment 1: run56_MG_IMPACT_MATRIX_17h30.png
run56_MG_IMPACT_MATRIX_17h30.png
Attachment 2: run56_MM_ToF_17h30.png
run56_MM_ToF_17h30.png
Attachment 3: run56_MM_DeE_17h27.png
run56_MM_DeE_17h27.png
Attachment 4: run56_MG-ToF_17h27.png
run56_MG-ToF_17h27.png
Attachment 5: run56_TAC_17h27.png
run56_TAC_17h27.png
Attachment 6: run56_Vamos_MW_17h26.png
run56_Vamos_MW_17h26.png
Attachment 7: run56_MM_Impact_Matrix_17h26.png
run56_MM_Impact_Matrix_17h26.png
Attachment 8: run56_scaler_17h25.png
run56_scaler_17h25.png
Fixede793s Thu Mar 11 20:23:58 2021 Faïrouz, FrancoRUNGeneralCD2run56 screenshots at 20h18
Attachment 1: run56_MG_IMPACT_MATRIX_20h18.png
run56_MG_IMPACT_MATRIX_20h18.png
Attachment 2: run56_MM_TOF_20h18.png
run56_MM_TOF_20h18.png
Attachment 3: run56_MM_DeE_20h18.png
run56_MM_DeE_20h18.png
Attachment 4: run56_MG_TOF_20h18.png
run56_MG_TOF_20h18.png
Attachment 5: run56_TAC_20h18.png
run56_TAC_20h18.png
Attachment 6: run56_VAMOS_MW_20h18.png
run56_VAMOS_MW_20h18.png
Attachment 7: run56_MM_IMPACT_MATRX_20h18.png
run56_MM_IMPACT_MATRX_20h18.png
Attachment 8: run56_Scaler_20h18.png
run56_Scaler_20h18.png
Fixede793s Thu Mar 11 21:14:26 2021 Fairouz & FrancoOFFLINEGeneralCD2Plots run 51-56
Top left: kinematic plot with the main levels observed. The orange lines are (d,p), (d,t), (d,d) and (12C,12C) reactions by 47Ti. The yellow line is 47K(p,p), the green line 47K(d,d).
Top right: in black Ex spectrum with gate on VAMOS, in red with also the gate on a gamma and scaled by a factor 3 for better comparison.
Bottom left: Egamma vs Ex with gate on VAMOS.
Bottom right: Egamma with gate on VAMOS.
Attachment 1: plots_51-56.png
plots_51-56.png
Attachment 2: Ex_thetalab_51-56.png
Ex_thetalab_51-56.png
Fixede793s Thu Mar 11 21:29:43 2021 FrancoRUNGeneralCD2Alignment in time of the VAMOS sections
The aligned time is saved in a variable called MWT in the output tree
Attachment 1: VAMOS_T_alignment.png
VAMOS_T_alignment.png