MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 124 of 132  Not logged in MUGAST
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Date Author Type Category Target-Source Subject
Fixede793s Thu Mar 11 09:04:38 2021 adrienONLINEGeneralCD2Elastic scattering in MM5
looking at E vs strip number in MM5 we see clearly the pp and dd elastic scattering.
Attachment 1: run53_mm5_elastic.png
run53_mm5_elastic.png
Fixede793s Thu Mar 11 09:17:17 2021 Nicolas, Lynda, CharlieRUNGeneralCD2run 53 new screenshots
Attachment 1: run53_mm_impact_matrix_01.png
run53_mm_impact_matrix_01.png
Attachment 2: run53_vamos_01.png
run53_vamos_01.png
Attachment 3: run53_tac_01.png
run53_tac_01.png
Attachment 4: run53_mg_e_tof_01.png
run53_mg_e_tof_01.png
Attachment 5: run53_mm_de_e_01.png
run53_mm_de_e_01.png
Attachment 6: run53_mm_e_tof_01.png
run53_mm_e_tof_01.png
Attachment 7: run53_mg_impact_matrix_01.png
run53_mg_impact_matrix_01.png
Fixede793s Thu Mar 11 09:43:56 2021 OttoRunRUNGeneralCD2Run54
*************************
Run : 54
*************************

Start at 2021-03-11 09:42:58.222892

Production run.

(ATC6 crystal stopped)

Beam: 2.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-11 10:15:45.347353
Stop comment: AGATA DAQ did not start
Fixede793s Thu Mar 11 10:18:48 2021 OttoRunRUNGeneralCD2Run55
*************************
Run : 55
*************************

Start at 2021-03-11 10:17:52.398357

Production run.

(ATC6 crystal stopped)
New beam tune with better centering from Bertrand

Beam: 2.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-11 11:23:27.810702
Stop comment: beam tuning by Bertrand to center it
Fixede793s Thu Mar 11 10:25:30 2021 Nicolas, Lynda, CharlieRUNGeneralCD2run 55 screenshots
Start of run, so scaler only - low stats in vigru plots
Attachment 1: run54_start_Scalers.png
run54_start_Scalers.png
Fixede793s Thu Mar 11 11:07:05 2021 mugastOFFLINEGeneralCD2run53 - Egamma vs Ex
Attachment 1: Egamma_vs_Ex_run53.png
Egamma_vs_Ex_run53.png
Pendinge793s Thu Mar 11 11:14:04 2021 AdrienOFFLINEGeneralCD2TODO LIST for Offline analysis
Miscelanous
  • Cleanup branches in npanalysis (remove old vamos branch and add MW TDC ones)
  • Check the MW TDC, make an offset calibration to align them
  • Implement the calibration in the analysis and out a MW_T branch with all the time
  • Allow for multiplicity in EDC


A clean macro for offline analysis producing a standardise Tcanvas to be put in the elog:
  • Ex And Ex normalised with coinc gamma overlay (Tac conditions for both) Indicate the Sn on this plot.
  • Kinematic plot with kinematic all line overlay (add fonctions to add kine line for 47Kdp 47Tidp 47Kpp 47Kdd 47Kdt 47KCC)
  • Ex vs EDC
  • Ex vs ThetaLab
  • Gamma-Gamma


Angular distribution
  • Add a separate macro with gate on gamma to produce ThetaLab distribution for each states
  • Do a simulation and produce a Solid angle for the g.s. And apply it to the distribution
  • Overlay the ADWA calculation with appropriate scaling (on a reference angle bin to be chosen)
Fixede793s Thu Mar 11 11:20:35 2021 Nicolas, Lynda, CharlieBEAMGeneralCD2End of run 55
MM impact matrix after tuning to center the beam by Bertrand
Attachment 1: run54_MM_impact_matrx.png
run54_MM_impact_matrx.png
Fixede793s Thu Mar 11 11:25:33 2021 OttoRunRUNGeneralCD2Run56
*************************
Run : 56
*************************

Start at 2021-03-11 11:25:08.768341

Production run.

(ATC6 crystal stopped)
New beam tune with better centering from Bertrand

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-12 08:55:44.216996
Stop comment: 8h55 beam is stopped to repair a leak. probably 4h intervention
Ongoinge793s Thu Mar 11 11:27:28 2021 Nicolas, Lynda, CharlieRUNGeneralCD2run 56 screenshots
Scaler only
Attachment 1: run56_scalar_start.png
run56_scalar_start.png
Fixede793s Thu Mar 11 12:11:16 2021 Freddy AdrienOFFLINEGeneralN/AElastic - Fixed MM5 position
We roughly fixed the position of MM5 in the mugast.detector file.

Kinematic line for elastic channels are now clearly visible.
Attachment 1: ELabThetaLabwithElastic.png
ELabThetaLabwithElastic.png
Fixede793s Thu Mar 11 12:39:01 2021 Nicolas, Lynda, Charlie, SarahRUNGeneralCD2run 56 screenshots
Attachment 1: run56_mm_impact_matrix_01.png
run56_mm_impact_matrix_01.png
Attachment 2: run56_vamos_01.png
run56_vamos_01.png
Attachment 3: run56_tac_01.png
run56_tac_01.png
Attachment 4: run56_mg_e_tof_01.png
run56_mg_e_tof_01.png
Attachment 5: run56_mm_de_e_01.png
run56_mm_de_e_01.png
Attachment 6: run56_mm_e_tof_01.png
run56_mm_e_tof_01.png
Attachment 7: run56_mg_impact_matrix_01.png
run56_mg_impact_matrix_01.png
Fixede793s Thu Mar 11 15:26:37 2021 Nicolas, Lynda, Charlie, SarahRUNGeneralCD2run 56 screenshots 15h30
online histograms reset around 15h45
Attachment 1: run56_mg_impact_matrix_02.png
run56_mg_impact_matrix_02.png
Attachment 2: run56_mm_de_e_02.png
run56_mm_de_e_02.png
Attachment 3: run56_mg_e_tof_02.png
run56_mg_e_tof_02.png
Attachment 4: run56_tac_02.png
run56_tac_02.png
Attachment 5: run56_FSC_02.png
run56_FSC_02.png
Attachment 6: run56_vamos_02.png
run56_vamos_02.png
Attachment 7: run56_mm_impact_matrix_02.png
run56_mm_impact_matrix_02.png
Attachment 8: run56_scaler_15h30.png
run56_scaler_15h30.png
Fixede793s Thu Mar 11 15:48:14 2021 mugastOFFLINEGeneralN/ABeam energy and Beta
Beam energy entering G1: 7.6922 MeV/u (Beta= 0.1277)

CATS2 thickness: 2.8 um of Mylar in total + about 4 cm of isobutane at 4 mbar
7.62783 / 7.61264 / 7.54789

Beam energy after CATS: 7.54789 MeV/u (Beta= 0.1265)

Beam at mid CD2 target : 7.45118 MeV/u (Beta= 0.1257)

Beam after target: 7.35381 MeV/u (Beta= 0.1249)
Fixede793s Thu Mar 11 17:32:07 2021 Faïrouz, Franco, SarahRUNGeneralCD2run 56 screenshots 17h30
Attachment 1: run56_MG_IMPACT_MATRIX_17h30.png
run56_MG_IMPACT_MATRIX_17h30.png
Attachment 2: run56_MM_ToF_17h30.png
run56_MM_ToF_17h30.png
Attachment 3: run56_MM_DeE_17h27.png
run56_MM_DeE_17h27.png
Attachment 4: run56_MG-ToF_17h27.png
run56_MG-ToF_17h27.png
Attachment 5: run56_TAC_17h27.png
run56_TAC_17h27.png
Attachment 6: run56_Vamos_MW_17h26.png
run56_Vamos_MW_17h26.png
Attachment 7: run56_MM_Impact_Matrix_17h26.png
run56_MM_Impact_Matrix_17h26.png
Attachment 8: run56_scaler_17h25.png
run56_scaler_17h25.png
Fixede793s Thu Mar 11 20:23:58 2021 Faïrouz, FrancoRUNGeneralCD2run56 screenshots at 20h18
Attachment 1: run56_MG_IMPACT_MATRIX_20h18.png
run56_MG_IMPACT_MATRIX_20h18.png
Attachment 2: run56_MM_TOF_20h18.png
run56_MM_TOF_20h18.png
Attachment 3: run56_MM_DeE_20h18.png
run56_MM_DeE_20h18.png
Attachment 4: run56_MG_TOF_20h18.png
run56_MG_TOF_20h18.png
Attachment 5: run56_TAC_20h18.png
run56_TAC_20h18.png
Attachment 6: run56_VAMOS_MW_20h18.png
run56_VAMOS_MW_20h18.png
Attachment 7: run56_MM_IMPACT_MATRX_20h18.png
run56_MM_IMPACT_MATRX_20h18.png
Attachment 8: run56_Scaler_20h18.png
run56_Scaler_20h18.png
Fixede793s Thu Mar 11 21:14:26 2021 Fairouz & FrancoOFFLINEGeneralCD2Plots run 51-56
Top left: kinematic plot with the main levels observed. The orange lines are (d,p), (d,t), (d,d) and (12C,12C) reactions by 47Ti. The yellow line is 47K(p,p), the green line 47K(d,d).
Top right: in black Ex spectrum with gate on VAMOS, in red with also the gate on a gamma and scaled by a factor 3 for better comparison.
Bottom left: Egamma vs Ex with gate on VAMOS.
Bottom right: Egamma with gate on VAMOS.
Attachment 1: plots_51-56.png
plots_51-56.png
Attachment 2: Ex_thetalab_51-56.png
Ex_thetalab_51-56.png
Fixede793s Thu Mar 11 21:29:43 2021 FrancoRUNGeneralCD2Alignment in time of the VAMOS sections
The aligned time is saved in a variable called MWT in the output tree
Attachment 1: VAMOS_T_alignment.png
VAMOS_T_alignment.png
Fixede793s Thu Mar 11 23:30:27 2021 Faïrouz, FrancoRUNGeneralCD2run56 screenshots at 23h20
Attachment 1: run56_VAMOS_MW_23h20.png
run56_VAMOS_MW_23h20.png
Attachment 2: run56_MM_IMPACT_MATRIX_23h20.png
run56_MM_IMPACT_MATRIX_23h20.png
Attachment 3: run56_MG-IMPACT_MATRIX_23h20.png
run56_MG-IMPACT_MATRIX_23h20.png
Attachment 4: run56_MM_ToF_23h20.png
run56_MM_ToF_23h20.png
Attachment 5: run56_MM_DeE_23h20.png
run56_MM_DeE_23h20.png
Attachment 6: run56_MG_ToF_23h24.png
run56_MG_ToF_23h24.png
Attachment 7: run56_TAC_23h20.png
run56_TAC_23h20.png
Attachment 8: run56_Scaler_23h20.png
run56_Scaler_23h20.png
Fixede793s Thu Mar 11 23:38:02 2021 Faïrouz, FrancoRUNGeneralCD2No beam at 23h35 for a duration of ~1à mn
The beam operators took the beam at 23h35 for 10 mn.
Attachment 1: run56_Scalers_23h44.png
run56_Scalers_23h44.png

ELOG Home Page