MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 124 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Source Subjectdown
Fixedcom2019 Wed Apr 3 16:24:37 2019 AdrienCATSSoftwareN/ACalib file from T.Roger
Here are the calibration file provided by T. Roger.
PinnedTEST Tue Feb 26 09:30:21 2019 FreddyOTHERHardwareN/ACabling - MUVI / HT-BT / SA-SL
Cabling scheme - to update until final
Fixede744s Thu Apr 11 00:57:34 2019 iulianOTHERHardwareCH2CH2 target thickness
target CH2 104 um (2nd position)

Brho 14N6+ CATS2
Fixede768s Mon Jul 22 05:30:37 2019 Faïrouz & SylvainRUNGeneralLiFCF put because AGATA went crazy
CF put because AGATA went crazy.
The beam profile is shifted in comparison to the initial profile at midnight. The beam is touching somewhere.
We asked the beam operators to try to center the beam.
Fixede744s Tue Apr 16 08:23:38 2019 Marion, DieterCATSHardwareCH2CATS tripping - lowering bias
8:24 Faraday in.
-5V on CATS.
550V.
8:25 Faraday out
Fixede786s Fri Jun 28 08:57:21 2019 FreddyCATSGeneralCryo-3HeCATS scaler not compatible with beam rate
The CATS scaler si now around 100-120 kHz while the beam rate is still 40 kHz.

I checked the CATS signal and there is clearly noise who induce double logic signals. Not all of them are validated by FAG.

We should raise the threshold- call sebastien

9h32 : Stop beam to enter and raise the threshold.
Fixede744s Fri Apr 12 08:19:31 2019 MarlèneOFFLINEGeneral CATS profiles RUN87
Fixedcom2019 Fri Apr 5 14:54:09 2019 mugastCATSHardwareN/ACATS high voltage lowered by 20V
CATS high voltage lowered by 20V from 580V to 560V (on request of J. Pancin)
Fixede744s Thu Apr 11 19:47:15 2019 MarlèneOFFLINEGeneral CATS charges in RUN76 and RUN77
Offline analysis to reconstruct the charges in X and Y for CATS.
The charges are lower in RUN77 because bias was reduced to 580V.
Wires seem to be all OK.
Fixede793s Thu Mar 11 04:34:58 2021 ablaihan, louisCATSHardwareCD2CATS and VAMOS tripped
at 4h15 CATS and VAMOS tripped probably due to too high beam intensity (~1.2x10^6 pps). We switched them on again at 4h30. All the 6 CATS in Board2 in HV by 525 V instead of 530 V.

We did not stop the run to not risk to crash the RCC. Events btw 4h15 and 4h30 will therefore have no time.
Fixede744s Thu Apr 11 09:05:37 2019 mugastCATSGeneralN/ACATS HV changed to 580
CATS HV changed from 600V to 580V.
Fixede744s Tue Apr 16 11:40:04 2019 mugastCATSHardwareN/ACATS HV
CATS2 HV was decreased to 540 V at 11h30 to avoid the overcurrent.

Need to monitor Efficiency, Time resolution as soon as the run restart with new target.
Fixede786s Mon Jun 24 03:08:49 2019 MarlèneRUNGeneralCryo-3HeBrho issue
We observe a change in the Brho of VAMOS : the charged states are divided in 2 !!!

Édit: it is now understood as ice water cracking on the upstream of the target.
Fixede768s Fri Jul 19 00:03:25 2019 JennBEAMGeneral Brho information 15 Oxygen beam 4.7MeV/u
Fixede768s Fri Jul 19 00:06:35 2019 JennBEAMGeneral Brho information 15 Oxygen beam 4.7MeV/u
Fixede744s Fri Apr 12 01:56:35 2019 Jenn, Louis, Cyril,Daniele and ChloeBEAMGeneralEmptyBrho for the new 14O setting RUN86
CATS2 on and target position 1: hole
Beam intensity in CATS: 4E4
VAMOS intensity 1.3E4

CATS2 off and target position 1 = hole
Beam intensity in VAMOS = 4e4 pps (~100% transmission)
Fixed  Fri Apr 5 19:05:56 2019 Marlène NicolasGRITGeneral Brho beam & 17O
Brho of 16O @ 6 MeV/A after 1mg/cm2 = 0.68906
Brho of 17O for g.s. after 1 mg/cm2=0.71065
Brho of 17O @ 871 keV after 1mg/cm2=0.70831
Fixede744s Fri Apr 12 06:51:59 2019 LouisBEAMGeneralN/ABrho and energy of the 14O beam
Fixede744s Mon Apr 15 10:07:23 2019 AntoineVAMOSHardware Brho VAMOS

During the change, Johan entered in G1 and connected a mass cable for the drift chambers.
Fixede768s Tue Jul 16 15:13:01 2019 Jenn, DIegoVAMOSGeneral Brho

ELOG Home Page