Fixed, e793s, Fri Mar 12 13:40:59 2021, OttoRun, RUN, General, CD2, Run59
|
*************************
Run : 59
*************************
Start at 2021-03-12 13:40:31.431982
Test run. ACQ DT
(ATC6 crystal stopped)
starting again after beam line reparation of power supply
Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%
Stop at 2021-03-12 13:42:17.319503
Stop comment: stopping daq because agata daq did not start |
Fixed, e793s, Fri Mar 12 15:19:35 2021, OttoRun, RUN, General, CD2, Run60
|
*************************
Run : 60
*************************
Start at 2021-03-12 15:19:14.732769
Test run. ACQ DT
ATC6 pos 0 is back
14C is removed
starting again after beam line reparation of power supply
Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%
Stop at 2021-03-12 16:53:37.438208
Stop comment: stop run after tuning of the beam |
Pinned, e793s, Fri Mar 12 15:48:35 2021, Adrien, RUN, General, N/A, Vamos D and Q value and MW HV
|
|
Pinned, e793s, Fri Mar 12 15:50:12 2021, Adrien, RUN, General, N/A, Vamos D and Q value and MW HV 
|
Attached are the value for D and Q pole of vamos in case they trip.
Also attached is the computer driving the HV of the focal plan. |
Fixed, e793s, Fri Mar 12 15:52:15 2021, Adrien, RUN, General, N/A, to do during run
|
Every 1-2h:
Online: take screen shot of
- Impact Matrix (MM and MG)
- E-TOF (MM and MG)
- E-DE (MM and MG)
- Raw Tac
- MW TDC
- Scaler
Check the Vamos Q and D value on the left computer in the VAMOS daq ROOM (next to inspection line)
|
Fixed, e793s, Fri Mar 12 16:58:43 2021, OttoRun, RUN, General, CD2, Run61
|
*************************
Run : 61
*************************
Start at 2021-03-12 16:57:56.722818
Test run. ACQ DT
starting again after centering the beam on the target
Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%
Stop at 2021-03-13 07:09:09.949615
Stop comment: run 61 stopped to fix AGATA acquisition problem |
Fixed, e793s, Fri Mar 12 18:42:51 2021, Sarah, Louis, BEAM, General, CD2, Beam Back
|
The beam is back at 18h40
The beam stopped due to source problems, going up steadily, currently at ~2e5 pps |
Fixed, e793s, Fri Mar 12 19:15:19 2021, Charlie, Nigel (watched by Wilton), RUN, General, CD2, Beam alignment tuning
|
During part of run #61, Nigel tuned the beam alignment (using the MUST2 hit pattern as the diagnostic). The beam had shifted after the restarting of the ISOL TIS. The beam came back at around 18:30 and tuning finished at 19:15.
** Disregard the data from this run between ~17:15 (beam lost) and 19:15 (tuning finished).
The run should be OK after 19:15.
** Don't tell Bertrand that Nigel used the d*p*le ... |
Fixed, e793s, Fri Mar 12 20:43:38 2021, Cyril, Louis, OFFLINE, General, CD2, DWBA 
|
DBWA analysis have been performed with TWOFNR, here the comparison with data for the 0, 2 and 4 MeV peaks.
1p1/2 (black line) and 0f7/2 (red line) |
Fixed, e793s, Fri Mar 12 20:54:30 2021, mugast, RUN, General, CD2, summary of run 61    
|
|
Fixed, e793s, Fri Mar 12 22:03:31 2021, Nishu, GiB, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 21:00
|
Back to normal around 22:00 after restarting HV 5 to 11 (except 10 which was still on) |
Fixed, e793s, Fri Mar 12 22:26:55 2021, julien, nishu, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 22:24
|
back again to normal, |
Fixed, e793s, Fri Mar 12 22:31:46 2021, julien, nishu, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 22:24 ans again ~ 22:45  
|
back again to normal after restarting the HV
(22:39) |
Fixed, e793s, Fri Mar 12 23:16:16 2021, julien, nishu, RUN, Hardware, CD2, vamos count rate goes down to 0 once again 
|
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:. |
Fixed, e793s, Fri Mar 12 23:27:58 2021, julien, nishu, RUN, General, CD2, summary of run 61    
|
below attached the screenshots of scalers and spectra |
Fixed, e793s, Fri Mar 12 23:54:52 2021, julien, nishu, Faïrouz, VAMOS, Hardware, CD2, Vamos tripped @ 23h35 & fixed
|
|
Fixed, e793s, Sat Mar 13 01:41:21 2021, Juan Lois & faïrouz, RUN, General, CD2, run61 screenshots at 1h40 8x
|
|
Fixed, e793s, Sat Mar 13 02:31:33 2021, Faïrouz, Juan Lois, VAMOS, Hardware, CD2, Vamos tripped @ 2h32 & fixed
|
|
Fixed, e793s, Sat Mar 13 03:50:54 2021, Faïrouz, Juan Lois, RUN, General, CD2, run61 screenshots at 3h44 8x
|
|
Pending, e793s, Sat Mar 13 05:11:08 2021, Faïrouz, Juan Lois, AGATA, Software, CD2, Problem with AGATA acquisition started at 4h40
|
There is a problem with AGATA Acquisition. All the bars in the global status & control are yellow!!!
This problem started at 4h40.
We called the acquisition astreinte but he doesn't know how to fix the problem.
We called Emmanuel but we got on the answering machine. We will call him again at 7 am.
The count rate of AGATA in the scaler looks ok: ~ 1200 |
|