MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 120 of 132  Not logged in MUGAST
    Fixed, com2019, Sun Apr 7 16:09:22 2019, Freddy, Valérian, Adrien, Antoine, OFFLINE, General, N/A, Excitation Energy and Gammas 
[quote="Freddy, Valérian, Adrien, Antoine"]This is it!

M.J.
Fixed, e768s, Fri Jul 26 23:45:18 2019, Franco, Andres, Daniele, OFFLINE, General, LiF, ExEgamma spectra for 15O from run 112 to 152_0 19Ne_112-152.png
 
Fixed, e768s, Tue Jul 23 02:09:38 2019, Freddy, Jenn, OFFLINE, General, LiF, Ex-Egamma (update) ExEgamma_kine_r112_126ongoing.pdf
Ex Egamma for run 112 115 116 117 118 119 120 121 122 124 125 126(partial)
Fixed, e768s, Mon Jul 22 15:27:35 2019, Freddy, Valerian, Adrien, OFFLINE, General, LiF, Ex-Egamma ExGamma_run115-121.pngExEgamma_r112_121_kine.png
Ex Egamma for run 112 115 116 117 118 119 120 121.
Fixed, e793s, Mon Mar 15 03:37:32 2021, Louis, OFFLINE, General, CD2, Ex vs Eg analysis and C2S ExEg_sum.pngC2S_run62.pnggamma_unbound.pngAnaPlot.png
1) Summary of the the Ex vs Eg analysis with all the gamma ray identified highlighted in red. Green line shows the corresponding position of the excited
states. 
    Fixed, e793s, Mon Mar 15 13:36:42 2021, Louis, Chloe, OFFLINE, General, CD2, Ex vs Eg analysis and C2S 
[quote="Louis"]1) Summary of the the Ex vs Eg analysis with all the gamma ray identified highlighted in red. Green line shows the corresponding position
of the excited states. 
Fixed, e768s, Thu Jul 18 19:40:11 2019, iulian, OFFLINE, General, LiF, Ex in 19F from run 72  mg5_19F_Ex_run72_0.pngmg11_19F_Ex_run72_0.pngallMugast_deToF_Q9_and8_19FVam_run72_0.pngallBackward_deToF_Q9_and8_19FVam_run72_1.png
Excitation energy spectra in 19F obtained by conditioning Z==9 and (A/Q*8-19)<0.3 in Vamos for 
MG5
MG11
    Fixed, e768s, Thu Jul 18 22:50:58 2019, iulian, Jenn, Franco, OFFLINE, General, LiF, Ex in 19F from run 72  Egamma_vs_Ex_8_19FVam_run72_0.png
Gamma energy vs excitation energy in 19F with all backward detectors for run 0072_0
    Fixed, e768s, Sat Jul 20 19:23:37 2019, Christiqn, OFFLINE, General, LiF, Ex in 19F from run 72  

[B]Data: Total integral for peak region around 4 MeV in 19F during run 72:
[/B]
Fixed, com2019, Sun Apr 7 14:24:18 2019, Valerian, OFFLINE, Software, CD2, Ex and E gamma with all statistic (run 256+257) bilan_run256_and_257_Ex_Egamma.png
 
Fixed, TEST, Wed Mar 27 11:06:33 2019, Valerian and Cyril, GRIT, Hardware, 3-alpha, Evolution of resolution with temperature MG4_13_deg.pngMG4_minus_4_deg.png
For the mugast telescope, changing the temperature from 13deg to minus 4deg doesn't seem to have an impact as strong as for the MUST2 telescopes.
Still, the resolution improve with a lower temperature, but the improvement is of only 0.1 channel... (See joined screenshots)
Fixed, e744s, Mon Apr 15 17:05:24 2019, Valerian, OFFLINE, Software, CH2, Evolution of deE DeEEvolutionWithIntensity.png
Evolution of dEE between run 122 (8e4pps) and 129 (2.5e5pps)
Fixed, e744s, Mon Apr 15 17:10:54 2019, Valerian, OFFLINE, Software, CH2, Evolution of deE DeEEvolutionWithIntensityIC1vsIC2.png
Evolution of dEE between run 122 (8e4pps) and 130 (2.5e5pps)
Fixed, e793s, Mon Mar 8 19:01:26 2021, Franco, GRIT, General, 3-alpha, Energy and time calibrations before experiment 8x
Energy resolutions:

MG1: 45 keV
Fixed, e793s, Sat Mar 13 07:26:40 2021, Faïrouz, Juan Lois, RUN, General, CD2, End of run61 screenshots at 7h20 7x
RUN 61 stopped to let Emmanuel fix the AGATA acquisition problem. 
Fixed, e793s, Thu Mar 11 11:20:35 2021, Nicolas, Lynda, Charlie, BEAM, General, CD2, End of run 55 run54_MM_impact_matrx.png
MM impact matrix after tuning to center the beam by Bertrand
Fixed, e768s, Sat Jul 20 10:50:01 2019, Nikola, ONLINE, General, , End of run 116 (beam problem) -> screenshots run 116 end @ 10h40 22x
1. A monitor of the primary beam failed and the astreinte had to be call (PCP did it).

2. The H2O cold box went in default. The cold water for AGATA digitizer; vamos crates and CTA went up to 25 deg!
Fixed, e744s, Wed Apr 24 15:01:01 2019, Valerian, OTHER, Hardware, N/A, Electronic scheme on the MUGAST side after experiment e744 MUGAST_Electronic_scheme_afterE744.pdf
Attached are schematics of the electronics.
Fixed, TEST, Wed Apr 3 15:49:02 2019, Valerian and Jenn, Chloé and François , OTHER, Hardware, N/A, Electronic scheme of VAMOS and MUGAST VAMOS_electronic_scheme.pdfVAMOS_electronic_scheme.pptxMUGAST_Electronic_scheme_v2.pptxMUGAST_Electronic_scheme_v3.pdfMUGAST_Electronic_scheme_v3.pptx
Edit : 4/04/19 Valerian and Jenn small correction of MUGAST scheme
Fixed, com2019, Fri Apr 5 23:32:29 2019, Fairouz, CATS, General, CD2, Electronic changes 
CATS detectors were removed.

For the MUVI stop, we send now HF propre.

ELOG Home Page