MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 120 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Source Subjectdown Text Attachments
Fixedcom2019 Sun Apr 7 16:09:22 2019 Freddy, Valérian, Adrien, AntoineOFFLINEGeneralN/AExcitation Energy and Gammas[quote="Freddy, Valérian, Adrien, Antoine"]This
is it!
  
Fixede768s Fri Jul 26 23:45:18 2019 Franco, Andres, DanieleOFFLINEGeneralLiFExEgamma spectra for 15O from run 112 to 152_0   19Ne_112-152.png 
Fixede768s Tue Jul 23 02:09:38 2019 Freddy, JennOFFLINEGeneralLiFEx-Egamma (update)Ex Egamma for run 112 115 116 117 118 119
120 121 122 124 125 126(partial)
 ExEgamma_kine_r112_126ongoing.pdf 
Fixede768s Mon Jul 22 15:27:35 2019 Freddy, Valerian, AdrienOFFLINEGeneralLiFEx-EgammaEx Egamma for run 112 115 116 117 118 119
120 121.
 ExGamma_run115-121.pngExEgamma_r112_121_kine.png 
Fixede793s Mon Mar 15 03:37:32 2021 LouisOFFLINEGeneralCD2Ex vs Eg analysis and C2S1) Summary of the the Ex vs Eg analysis with
all the gamma ray identified highlighted
in red. Green line shows the corresponding
 ExEg_sum.pngC2S_run62.pnggamma_unbound.pngAnaPlot.png 
Fixede793s Mon Mar 15 13:36:42 2021 Louis, ChloeOFFLINEGeneralCD2Ex vs Eg analysis and C2S[quote="Louis"]1) Summary of the the Ex vs
Eg analysis with all the gamma ray identified
highlighted in red. Green line shows the
  
Fixede768s Thu Jul 18 19:40:11 2019 iulianOFFLINEGeneralLiFEx in 19F from run 72 Excitation energy spectra in 19F obtained
by conditioning Z==9 and (A/Q*8-19)<0.3 in
Vamos for 
 mg5_19F_Ex_run72_0.pngmg11_19F_Ex_run72_0.pngallMugast_deToF_Q9_and8_19FVam_run72_0.pngallBackward_deToF_Q9_and8_19FVam_run72_1.png 
Fixede768s Thu Jul 18 22:50:58 2019 iulian, Jenn, FrancoOFFLINEGeneralLiFEx in 19F from run 72 Gamma energy vs excitation energy in 19F with
all backward detectors for run 0072_0
 Egamma_vs_Ex_8_19FVam_run72_0.png 
Fixede768s Sat Jul 20 19:23:37 2019 ChristiqnOFFLINEGeneralLiFEx in 19F from run 72
[B]Data: Total integral for peak region around
4 MeV in 19F during run 72:
  
Fixedcom2019 Sun Apr 7 14:24:18 2019 ValerianOFFLINESoftwareCD2Ex and E gamma with all statistic (run 256+257)   bilan_run256_and_257_Ex_Egamma.png 
FixedTEST Wed Mar 27 11:06:33 2019 Valerian and CyrilGRITHardware3-alphaEvolution of resolution with temperatureFor the mugast telescope, changing the temperature
from 13deg to minus 4deg doesn't seem to
have an impact as strong as for the MUST2
 MG4_13_deg.pngMG4_minus_4_deg.png 
Fixede744s Mon Apr 15 17:05:24 2019 ValerianOFFLINESoftwareCH2Evolution of deEEvolution of dEE between run 122 (8e4pps)
and 129 (2.5e5pps)
 DeEEvolutionWithIntensity.png 
Fixede744s Mon Apr 15 17:10:54 2019 ValerianOFFLINESoftwareCH2Evolution of deEEvolution of dEE between run 122 (8e4pps)
and 130 (2.5e5pps)
 DeEEvolutionWithIntensityIC1vsIC2.png 
Fixede793s Mon Mar 8 19:01:26 2021 FrancoGRITGeneral3-alphaEnergy and time calibrations before experimentEnergy resolutions:

MG1: 45 keV
 8x 
Fixede793s Sat Mar 13 07:26:40 2021 Faïrouz, Juan LoisRUNGeneralCD2End of run61 screenshots at 7h20RUN 61 stopped to let Emmanuel fix the AGATA
acquisition problem. 
 7x 
Fixede793s Thu Mar 11 11:20:35 2021 Nicolas, Lynda, CharlieBEAMGeneralCD2End of run 55MM impact matrix after tuning to center the
beam by Bertrand
 run54_MM_impact_matrx.png 
Fixede768s Sat Jul 20 10:50:01 2019 NikolaONLINEGeneral End of run 116 (beam problem) -> screenshots run 116 end @ 10h401. A monitor of the primary beam failed and
the astreinte had to be call (PCP did it).
 22x 
Fixede744s Wed Apr 24 15:01:01 2019 ValerianOTHERHardwareN/AElectronic scheme on the MUGAST side after experiment e744Attached are schematics of the electronics.  MUGAST_Electronic_scheme_afterE744.pdf 
FixedTEST Wed Apr 3 15:49:02 2019 Valerian and Jenn, Chloé and François OTHERHardwareN/AElectronic scheme of VAMOS and MUGASTEdit : 4/04/19 Valerian and Jenn small correction
of MUGAST scheme
 VAMOS_electronic_scheme.pdfVAMOS_electronic_scheme.pptxMUGAST_Electronic_scheme_v2.pptxMUGAST_Electronic_scheme_v3.pdfMUGAST_Electronic_scheme_v3.pptx 
Fixedcom2019 Fri Apr 5 23:32:29 2019 FairouzCATSGeneralCD2Electronic changesCATS detectors were removed.

For the MUVI stop, we send now HF propre.
  

ELOG Home Page