Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e768s |
Wed Jul 24 14:41:09 2019 |
mugast | RUN | General | N/A | VAMOS divison 30 | VAMOs division is set to 30 |
|
Fixed | e768s |
Tue Jul 23 16:19:14 2019 |
Marlène | OTHER | Hardware | | VAMOS division | VAMOS division was set 10 instead of 100.
CATS 1 & CATS2 scalers are sent to the two
last channels of the scaler |
|
Fixed | e768s |
Fri Jul 26 15:47:17 2019 |
mugast | VAMOS | Hardware | LiF | VAMOS division | New VAMOS division : 10. |
|
Fixed | e744s |
Thu Apr 11 02:36:15 2019 |
Daniele, Andrea | VAMOS | General | N/A | VAMOS cfg | [TABLE border="1"]
VAMOS BRO= 0.64050 Phi= 45 Dtrans= 0.66m
T-xFoc=7.995m
|
|
Fixed | e793s |
Wed Mar 17 07:18:39 2021 |
Laetitia, Charlie | ONLINE | General | CD2 | VAMOS acquisition stopped | The acquisition on Vamos get stucked at 6h49.
At 07:18, we stopped and started a new run
(run 64) |
|
Fixed | e793s |
Wed Mar 17 07:25:24 2021 |
Laetitia, Charlie | ONLINE | General | CD2 | VAMOS acquisition stopped | Vamos acquisition get stucked at 6h49 (with
2 Gbit). We stopped and started a new run
at 07h18 (Run #64) |
|
Fixed | e768s |
Sat Jul 20 23:57:34 2019 |
Diego | OFFLINE | General | | VAMOS acceptance, comparison between 9+ and 10+ states | Figures above, simulation of VAMOS acceptance
for 10+ and 9+ 19Ne charge states. Ratio
between them quite big (0.58)
|
|
Fixed | e786s |
Sun Jun 23 09:06:29 2019 |
Daniele M | VAMOS | General | N/A | VAMOS SETTINGS | attached the energy measured in CIME and the
calculated VAMOS settings |
|
Pinned | e744s |
Wed Apr 10 11:57:37 2019 |
A. Lemasson | OFFLINE | Software | | VAMOS Conversion HowTo |
[B]HOW TO convert a run in VAMOS[/B]
[LIST]
|
|
Fixed | e786s |
Tue Jun 25 15:33:40 2019 |
A Lemasson | VAMOS | General | | VAMOS Analysis - Brho | VAMOS Analysis :
VAMOS PID with attached SetAlias.C
|
8x |
Fixed | e768s |
Wed Jul 24 17:21:27 2019 |
Diego | OTHER | General | | VAMOS Acceptance with different positions of the beam in the target | |
|
Fixed | e793s |
Sun Mar 14 15:20:47 2021 |
Adrien | OFFLINE | General | CD2 | Updated Angular distribution macro | The angular distribution macro has been updated
and now produce TWOFNR calculation on the
fly.
|
|
Fixed | e768s |
Sun Jul 28 08:20:38 2019 |
Sylvain & Franco | RUN | General | | Update on possible restart | The problem that caused the interruption was
due to a failure in the cooling system.
The last update we've had is that we might |
|
Fixed | e768s |
Sun Jul 28 16:23:48 2019 |
Nicolas | RUN | General | | Update on possible restart | Same situation as before lunch, the beam is
still in C0 and not yet in CSS1. We may have
beam in late evening.... |
|
Ongoing | e768s |
Sun Jul 28 19:58:57 2019 |
Nicolas | RUN | General | | Update on possible restart | Beam is now at the exit of CSS2 though We
may have beam around midnight....[/quote] |
|
Fixed | e768s |
Sun Jul 28 21:59:43 2019 |
Nicolas | RUN | General | | Update on possible restart | Beam is in G1 with 3e6 pps. PCP will optimize
for about 1-1,5h before we take the beam. |
|
Fixed | TEST |
Wed Mar 11 18:12:40 2020 |
Marlène & Franco | GRIT | Hardware | N/A | Update on Mugast | (Probably) final update of the status of the
detector before the experiment:
|
|
Fixed | e786s |
Wed Jun 26 07:04:06 2019 |
Freddy | CATS | General | N/A | Update of CATS calibrations | New calibrations in :
/home/mugast/analysis/nptool/Projects/calibration/cats/CATS2_X.vamos2019_e786s.npt
/home/mugast/analysis/nptool/Projects/calibration/cats/CATS2_X.vamos2019_e786s.npt
|
 |
Fixed | e793s |
Tue Mar 9 10:22:16 2021 |
mugast | DAQ | Hardware | N/A | U2M scaler configuration | U2M
1-FAG
|
|
Fixed | e768s |
Sat Jul 20 19:21:56 2019 |
Marlene, Nicolas, Christian, Fairouz | OFFLINE | General | | Trying to understand AGATA g-ray yields | goal: we want to check whether the yields
of the 1297.7 keV (from 19Ne 1536, 3/2+,
l=1 state) and 1340 keV (from 19Ne 1615, |
|