MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 11 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Source Subjectdown Text Attachments
Fixede768s Wed Jul 24 14:41:09 2019 mugastRUNGeneralN/AVAMOS divison 30VAMOs division is set to 30   
Fixede768s Tue Jul 23 16:19:14 2019 MarlèneOTHERHardware VAMOS divisionVAMOS division was set 10 instead of 100.
CATS 1 & CATS2 scalers are sent to the two
last channels of the scaler
  
Fixede768s Fri Jul 26 15:47:17 2019 mugastVAMOSHardwareLiFVAMOS divisionNew VAMOS division : 10.   
Fixede744s Thu Apr 11 02:36:15 2019 Daniele, AndreaVAMOSGeneralN/AVAMOS cfg[TABLE border="1"]
VAMOS BRO= 0.64050 Phi= 45 Dtrans= 0.66m
T-xFoc=7.995m 
  
Fixede793s Wed Mar 17 07:18:39 2021 Laetitia, CharlieONLINEGeneralCD2VAMOS acquisition stoppedThe acquisition on Vamos get stucked at 6h49.
At 07:18, we stopped and started a new run
(run 64)
  
Fixede793s Wed Mar 17 07:25:24 2021 Laetitia, CharlieONLINEGeneralCD2VAMOS acquisition stoppedVamos acquisition get stucked at 6h49 (with
2 Gbit). We stopped and started a new run
at 07h18 (Run #64)
  
Fixede768s Sat Jul 20 23:57:34 2019 DiegoOFFLINEGeneral VAMOS acceptance, comparison between 9+ and 10+ statesFigures above, simulation of VAMOS acceptance
for 10+ and 9+ 19Ne charge states. Ratio
between them quite big (0.58)
 VAMOS_acceptance.png 
Fixede786s Sun Jun 23 09:06:29 2019 Daniele MVAMOSGeneralN/AVAMOS SETTINGSattached the energy measured in CIME and the
calculated VAMOS settings
 vamos_setttings.jpg 
Pinnede744s Wed Apr 10 11:57:37 2019 A. LemassonOFFLINESoftware VAMOS Conversion HowTo
[B]HOW TO convert a run in VAMOS[/B] 
[LIST]
  
Fixede786s Tue Jun 25 15:33:40 2019 A LemassonVAMOSGeneral VAMOS Analysis - BrhoVAMOS Analysis : 
VAMOS PID with attached SetAlias.C
 8x 
Fixede768s Wed Jul 24 17:21:27 2019 DiegoOTHERGeneral VAMOS Acceptance with different positions of the beam in the target   VAMOS_acceptance_for_different_positions_at_the_target.png 
Fixede793s Sun Mar 14 15:20:47 2021 AdrienOFFLINEGeneralCD2Updated Angular distribution macroThe angular distribution macro has been updated
and now produce TWOFNR calculation on the
fly.
  
Fixede768s Sun Jul 28 08:20:38 2019 Sylvain & FrancoRUNGeneral Update on possible restartThe problem that caused the interruption was
due to a failure in the cooling system.
The last update we've had is that we might
  
Fixede768s Sun Jul 28 16:23:48 2019 NicolasRUNGeneral Update on possible restartSame situation as before lunch, the beam is
still in C0 and not yet in CSS1. We may have
beam in late evening....
  
Ongoinge768s Sun Jul 28 19:58:57 2019 NicolasRUNGeneral Update on possible restartBeam is now at the exit of CSS2 though We
may have beam around midnight....[/quote]
  
Fixede768s Sun Jul 28 21:59:43 2019 NicolasRUNGeneral Update on possible restartBeam is in G1 with 3e6 pps. PCP will optimize
for about 1-1,5h before we take the beam.
  
FixedTEST Wed Mar 11 18:12:40 2020 Marlène & FrancoGRITHardwareN/AUpdate on Mugast(Probably) final update of the status of the
detector before the experiment:
  
Fixede786s Wed Jun 26 07:04:06 2019 FreddyCATSGeneralN/AUpdate of CATS calibrationsNew calibrations in :
/home/mugast/analysis/nptool/Projects/calibration/cats/CATS2_X.vamos2019_e786s.npt
/home/mugast/analysis/nptool/Projects/calibration/cats/CATS2_X.vamos2019_e786s.npt
 run56_cats_newcal.pngrun_58_cats_newcal.png 
Fixede793s Tue Mar 9 10:22:16 2021 mugastDAQHardwareN/AU2M scaler configurationU2M

1-FAG
  
Fixede768s Sat Jul 20 19:21:56 2019 Marlene, Nicolas, Christian, FairouzOFFLINEGeneral Trying to understand AGATA g-ray yieldsgoal: we want to check whether the yields
of the 1297.7 keV (from 19Ne 1536, 3/2+,
l=1 state) and 1340 keV (from 19Ne 1615,
  

ELOG Home Page