MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 118 of 132  Not logged in MUGAST
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede768s Tue Jul 23 00:01:23 2019 Freddy, JennBEAMGeneralLiFBeam intensity and profile check
Fixede768s Tue Jul 23 02:04:17 2019 Freddy, JennOTHERGeneralLiFovernight summary (Monday 22 to Tuesday 23rd)
Smooth counting at 1000 KHz in VAMOS (see scalers)

- 1h45 - resync of AGATA 13C
Fixede768s Tue Jul 23 02:09:38 2019 Freddy, JennOFFLINEGeneralLiFEx-Egamma (update)
Ex Egamma for run 112 115 116 117 118 119 120 121 122 124 125 126(partial)
Fixede768s Tue Jul 23 02:15:58 2019 Freddy, JennONLINEGeneralLiFScreenshots run 126 @2h00
FixedTEST Mon Feb 24 16:11:05 2020 Freddy, Franco, Didier, MarlèneRUNGeneral run 123 screenshots
RUN 123
CD2 300ug/cm2
Beam intensity 1e5 pps

reference run
Fixede786s Sun Jun 23 14:37:43 2019 Freddy, Franco and LouisOTHERHardware Temperature error on +2.5v/t3
There is a temperature error on the +2.5 V for MUST2 Telescope. It created error message due to hv_monitor but it does not shutdown the voltage.
We modified the code in hv_monitor to not display popup message and elog message if this channel is concerned.
Fixede768s Wed Jul 31 03:22:42 2019 Freddy, ChloéBEAMGeneral Beam profile (run160) @2h24
Fixede768s Wed Jul 31 03:25:57 2019 Freddy, ChloéBEAMGeneralN/AScaler Evolution run 160
Scaler evolution during run 160 until 3h30 on Wednesday 31st.

- rather stable condition around 1.5 * 10^7 pps
- square detector seems to have some fluctuating trigger rate certainly due to some strips with larger noise or baseline fluctuations.
Fixede768s Wed Jul 31 04:13:31 2019 Freddy, ChloéBEAMGeneralN/AHF CIME disjonction
Disjonction HF CIME at 4h14

Restart at 4h30 (see beam profile and scalers after restart)
Fixede768s Wed Jul 31 04:56:38 2019 Freddy, ChloéRUNGeneralLiFScreenshots run 160 - Wed31 @ 4h57
Fixede775s Thu Mar 5 17:07:40 2020 Freddy, AdrienOTHERGeneralN/APedestals: summary for E775s
Two runs are useful for pedestals after experiment:

run 190 --> normalized pedestals (nominally to 8192)
run 191 --> raw pedestals

The pedestal values read from DAS on the 18th of February were in principle loaded in GECO at the beginning of the experiment and are attached:
ped_MUVIX_sectorX.dat

The pedestals read from GECO at the end of the experiments (so used during the experiment) are also attached and are those named:
MUVIX_sectorX.txt



It would be good to check they are consistent with run 191.
Fixede793s Thu Mar 11 12:11:16 2021 Freddy AdrienOFFLINEGeneralN/AElastic - Fixed MM5 position
We roughly fixed the position of MM5 in the mugast.detector file.

Kinematic line for elastic channels are now clearly visible.
FixedTEST Thu Feb 21 09:08:49 2019 FreddyRUNGeneral3-alphaRUN 30 - alpha on MG 1,3,5,7
Run 30

Alpha source run for trapezoid detectors during the night with pedestals aligned and zero suppression. Cooling at 15°C.
Thresholds at 500 keV.
Run size: 1.3 G

On MUVI1:

1--> MG5 (150V)
2--> --
3--> MG3 (160V)
4--> --

On MUVI2:
5--> MG7 (120V)
6--> MG1 (140V)
7--> --
8--> --

TRIGGERS are:
GMT ch1 --> OR MUVI1
GMT ch2 --> OR MUVI2
GMT ch3 --> OR MUVI3 (nothing on it)

Plots are now represented using the correspondance map which means that it correspond to the geometrical ordering on the detector. With this representation groups of strips missing or disfunctionning on a given region of the detector is more obvious.
PinnedTEST Tue Feb 26 09:30:21 2019 FreddyOTHERHardwareN/ACabling - MUVI / HT-BT / SA-SL
Cabling scheme - to update until final
FixedTEST Fri Mar 1 12:07:44 2019 FreddyGRITGeneral3-alphaEfficiency reconstruction
blue: reconstructed efficiency using alpha run 40 (arbitratily normalized)
red: simulated efficiency

There is a difference in angle for trapezoids -> to be investigated

Remark: Simulation curve seems wrong (maybe a target in detector file not removed)
Fixedcom2019 Tue Apr 2 08:52:16 2019 FreddyMUST2General3-alphaPEDESTAL save - run 165
Normalized Pedestal value loaded in DAS for run 165 (3-alpha)

folder: /home/mugast/ganacq_manip/mugast/das-save/pedestal-save/run165

NB: Not sure when this pedestal values were read from the board, in principle should have been read just before the run.
Fixedcom2019 Tue Apr 2 17:15:47 2019 FreddyOTHERGeneralN/ADWBA Cross section
16O(d,p)17O*(1/2+) @ 6 MeV/nucleon - SF = 1
Fixedcom2019 Thu Apr 4 16:30:53 2019 FreddyRUNGeneralN/ATime Calibrator Run Summary
RUN 150-157

pedestal file loaded : /home/mugast/ganacq_manip/das-save/pedestal-save/pedestal_read_3april_15h18

  • All ramps on MUVI1 detectors are not great... not enough stat
  • MUVI2, MUVI3 ramps are OK with good amount of statistics -> Interesting for MG11 (Annular) which was not calibrated

Fixede744s Mon Apr 15 01:06:57 2019 FreddyBEAMGeneralN/ADipole trip
A dipole tripped somewhere on the line, the operators put it back to value very quickly. Interruption of the beam for 2 minutes at 1h06.
Fixede744s Mon Apr 15 01:49:49 2019 FreddyMUST2GeneralN/ACsI - low energy suppression
The suppression zone around the pedestals for the CsI was set to 8210 since the beginning of the experiment.

It corresponds to about 30 channels above the zero (8192). The gain for the CsI is of 40 keV/channel.

This gives an artifical threshold (visible in the dE-E) spectra for punch through event at about (30 ch * 40keV/ch = 1.2 MeV)

It is rather high and could possibly be lowered. This implies a change in the DAS which apparently has been closed since the beginning of the beam time to avoid interferences with GECO.

It has to be discussed during the day wether it is necessary/preferable or not....

ELOG Home Page