Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e768s |
Tue Jul 16 15:13:01 2019 |
Jenn, DIego | VAMOS | General | | Brho |
|
Attachment 1: E768_BRHO.pdf
|
|
Fixed | e768s |
Sun Jul 28 04:22:15 2019 |
Jenn, Andres and Daniele | BEAM | General | N/A | Beam problems and DC trip |
- Updated from PCP about the problem with the beam: cyclotron went down and estimation of ~5h to have the beam back.
- After the beam went down, the Drift Chambers tripped making all the other biases go down (crate problem?). We tried to recover the biases but they don't go up. We decided not to call Diego at the moment, as the beam will take long to come back. We will call him when we have more news from PCP.
- Checked the water tray of MUGAST cooling system: seems ok. |
Attachment 1: IMG_20190728_043633.jpg
|
|
Fixed | e775s |
Tue Feb 25 02:16:36 2020 |
Jenn and Kseniia | ONLINE | General | CD2 | Screenshots run 128 |
VAMOS TRIGGER: 7.3 e4 pps |
Attachment 1: run128_MG_impact.png
|
|
Attachment 2: run128_MG_ETOF.png
|
|
Attachment 3: run128_MG_TAC.png
|
|
Attachment 4: run128_MG_corr.png
|
|
Attachment 5: run128_MG_STRX.png
|
|
Attachment 6: run128_MG_THETA_E.png
|
|
Fixed | e768s |
Sun Jul 28 01:11:41 2019 |
Jenn and Andres | ONLINE | General | LiF | Screenshots run 154 @ 01h00 |
|
Attachment 1: Tab8_run154_6.png
|
|
Attachment 2: IC_IC_run154_6.png
|
|
Attachment 3: REC_run154_6.png
|
|
Attachment 4: TACS_run154_6.png
|
|
Attachment 5: IC_run154_6.png
|
|
Attachment 6: MW_run154_6_2.png
|
|
Attachment 7: MW_run154_6.png
|
|
Attachment 8: DC_Y_run154_6.png
|
|
Attachment 9: DC_X_run154_6.png
|
|
Attachment 10: Tab_10_run154_6.png
|
|
Attachment 11: Tab_9_run154_6.png
|
|
Attachment 12: Tab_8bis_run154_6.png
|
|
Attachment 13: Correlation_run154_6.png
|
|
Attachment 14: TAC_run154_6.png
|
|
Attachment 15: MG_ToF_run154_6.png
|
|
Attachment 16: MM_DeE_run154_6.png
|
|
Attachment 17: MM_ToF_run154_6.png
|
|
Attachment 18: MG_IMPACT_MATRIX_run154_6.png
|
|
Attachment 19: MM_IMPACT_MATRIX-run154-6.png
|
|
Fixed | e768s |
Sun Jul 28 01:49:25 2019 |
Jenn and Andres | ONLINE | General | LiF | Beam profile and scaler run 154 overnight |
OR VAMOS ~ 500
BEAM Profiler ~ 1.4e7 |
Attachment 1: Scalers_run154_6.png
|
|
Attachment 2: Beam_profiler.jpg
|
|
Fixed | e768s |
Sun Jul 28 03:26:54 2019 |
Jenn and Andres | RUN | General | LiF | STOP RUN 154 |
At 3:00 am beam went off. We called PCP and they told us that they had some problems they need to fix and that it might take long.
Therefore we decided to stop the run and put the Faraday cup.
PCP will call when they deliver again the beam. |
Fixed | com2019 |
Fri Apr 5 19:42:28 2019 |
Jenn Sanchez & Ana Montaner-Pizá | OTHER | General | CD2 | PACE4 calculations |
Attached you can find the PACE4 calculations for the reactions 16O + 12C and 16O + d at 6 MeV/u beam.
Main cross sections are:
* 25Mg (232 mb, 25%) and 16O (182, 21%) (for 16O+12C).
* 17O (292 mb, 42%) and 14N (270, 39%) (for 16O+d).
|
Attachment 1: 16O_12C.png
|
|
Attachment 2: 16O_d.png
|
|
Fixed | e768s |
Tue Jul 30 04:25:49 2019 |
Jenn & Franco & Teodora | BEAM | General | LiF | Beam intensity, profile check and SUMMARY night |
This is what we were seeing in agata. We think it might be possible we were having a bit of beam implanted somewhere. We called PCP to check.
Jenn & Franco wrote: | In run 158 at around 01:00am PCP took the beam to try to optimize it. We got the beam back after ~15 minutes.
Beam intensity ~1.2e7
OR MUGAST ~ 160
OR VAMOS ~ 650
30 minutes later: comparing the actual beam profile with the previous ones it looks like the beam has shifted on the horizontal axis (before the centroid was -1.9, now it is -3.4).
At the same time we noticed an increase in the AGATA counting rate (~ 35k). AGATA itself is not very stable, each now and then all the detectors go in back pressure for few
seconds and then they come back to the normal status. Moreover we see more counts on the second line in the correlation matrix (see figure attached). We think that maybe
with the last optimization the beam is slightly touching somewhere out of the target.
At 02:15am there was a problem with the vacuum on the PCP side so the beam went off. We wait for a guy to come in ~45min and solve this issue or understand WThell is happening.
RUN 158 won't be stopped to avoid DAQ problems.
TO UNDERSTAND: even after beam stopped 30 min ago, OR Vamos is still counting ~100 Hz while AGATA and MUGAST are counting nothing. |
|
Attachment 1: IMG_20190730_042215.jpg
|
|
Fixed | e768s |
Tue Jul 30 04:40:18 2019 |
Jenn & Franco & Teodora | RUN | General | LiF | Beam back at 4.00 h |
Due to the high rate of AGATA and Mugast (probably due to some implantation) we asked the PCP to readjust the beam.
They centered it a bit more on the profiler and now it looks better. Attached are the new rates.
OR VAMOS ~ 620
OR MUGAST ~ 170
OR AGATA ~ 7k
Jenn & Franco wrote: | We had the beam back at 4.00 a.m.
Beam profile and intensity checked: 1.2e7
OR VAMOS ~ 630
OR MUGAST ~ 170
OR AGATA ~ 35k |
|
Attachment 1: scaler_6.png
|
|
Attachment 2: IMG-20190730-WA0000.jpg
|
|
Fixed | e768s |
Tue Jul 30 01:20:21 2019 |
Jenn & Franco | BEAM | General | LiF | Beam intensity, profile check and SUMMARY night |
In run 158 at around 01:00am PCP took the beam to try to optimize it. We got the beam back after ~15 minutes.
Beam intensity ~1.2e7
OR MUGAST ~ 160
OR VAMOS ~ 650
30 minutes later: comparing the actual beam profile with the previous ones it looks like the beam has shifted on the horizontal axis (before the centroid was -1.9, now it is -3.4).
At the same time we noticed an increase in the AGATA counting rate (~ 35k). AGATA itself is not very stable, each now and then all the detectors go in back pressure for few
seconds and then they come back to the normal status. Moreover we see more counts on the second line in the correlation matrix (see figure attached). We think that maybe
with the last optimization the beam is slightly touching somewhere out of the target.
At 02:15am there was a problem with the vacuum on the PCP side so the beam went off. We wait for a guy to come in ~45min and solve this issue or understand WThell is happening.
RUN 158 won't be stopped to avoid DAQ problems.
TO UNDERSTAND: even after beam stopped 30 min ago, OR Vamos is still counting ~100 Hz while AGATA and MUGAST are counting nothing. |
Attachment 1: photo_2019-07-30_00-19-19.jpg
|
|
Attachment 2: scaler_4.png
|
|
Attachment 3: correlation.png
|
|
Fixed | e768s |
Tue Jul 30 04:04:27 2019 |
Jenn & Franco | RUN | General | LiF | Beam back at 4.00 h |
We had the beam back at 4.00 a.m.
Beam profile and intensity checked: 1.2e7
OR VAMOS ~ 630
OR MUGAST ~ 170
OR AGATA ~ 35k
The AGATA rate is still very high. |
Attachment 1: scaler_5.png
|
|
Attachment 2: IMG_20190730_040124.jpg
|
|
Fixed | e768s |
Sun Jul 21 01:57:59 2019 |
Jenn & Franck | ONLINE | General | LiF | Screenshots run 119 |
|
Attachment 1: Diamond_r119_1.png
|
|
Attachment 2: Scalers_r119_1.png
|
|
Attachment 3: DCX_1d_r119_1.png
|
|
Attachment 4: IC_IC_r119_1.png
|
|
Attachment 5: FP_r119_1.png
|
|
Attachment 6: Tmg_vamos_r119_1.png
|
|
Attachment 7: IC_r119_1.png
|
|
Attachment 8: MW_r119_1.png
|
|
Attachment 9: Ewire_r119_1.png
|
|
Attachment 10: Twire_r119_1.png
|
|
Attachment 11: DCX_r119_1.png
|
|
Attachment 12: mg_eraw_r119_1.png
|
|
Attachment 13: mg_timecal_r119_1.png
|
|
Attachment 14: ADC_r119_1.png
|
|
Attachment 15: corr_r119_1.png
|
|
Attachment 16: TACs_r119_1.png
|
|
Attachment 17: mg_etof_r119_1.png
|
|
Attachment 18: mm_ede_r119_1.png
|
|
Attachment 19: mm_etof_r119_1.png
|
|
Attachment 20: mg_impact_r119_1.png
|
|
Attachment 21: mm_impact_r119_1.png
|
|
Fixed | e768s |
Sun Jul 21 04:48:52 2019 |
Jenn & Franck | BEAM | General | N/A | Beam intensity check |
OR Vamos: 1300 /s
Vamos gas profiler: 1.7x10^7 pps |
Fixed | e768s |
Tue Jul 23 06:49:54 2019 |
Jenn & Christian & Kseniia | BEAM | General | | Beam intensity and profile check |
VAMOS OR ~ 870
BEAM INTENSITY ~ 1.4E7 |
Attachment 1: photo_2019-07-23_05-50-19.jpg
|
|
Fixed | e768s |
Tue Jul 23 04:31:34 2019 |
Jenn & Christian | BEAM | General | | Diamond Scaler screenshot |
|
Attachment 1: diamondscaler_run126_3.png
|
|
Fixed | e768s |
Tue Jul 23 04:34:03 2019 |
Jenn & Christian | BEAM | General | | Beam intensity and profile check |
VAMOS OR: ~1200
BEAM INTENSITY ~ 2E7 |
Attachment 1: photo_2019-07-23_03-26-41.jpg
|
|
Fixed | com2019 |
Thu Apr 4 14:41:52 2019 |
Jenn | TARGET | General | N/A | Mask |

Image of the Mask position in the target frame. |
Fixed | e768s |
Tue Jul 16 15:32:05 2019 |
Jenn | OTHER | General | | Shift table google schedule link |
Please, see below the spreadsheet with the shift schedule.
https://docs.google.com/spreadsheets/d/1NcidygPHZhcBTr5j6TMV7oaz7jJcAoLt4q_sOz813Cg/edit?usp=sharing |
Fixed | e768s |
Wed Jul 17 11:36:53 2019 |
Jenn | VAMOS | General | | M/Q values |
Values of M/Q for possible recoils on the focal plane
M/Q
15N 15/7 2.14
15N 15/6 2.5
19F 19/9 2.11
19F 19/8 2.38
20F 20/9 2.22
20F 20/8 2.5 |
Fixed | e768s |
Thu Jul 18 22:10:58 2019 |
Jenn | OTHER | General | | Previous Papers |
|
Attachment 1: Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdf
|
|
Attachment 2: Phys.Rev.C_2010_Fortune.pdf
|
|
Attachment 3: Phys.Rev.C_2003_Fortune.pdf
|
|
Attachment 4: Phys.Rev.C_1996_Mao.pdf
|
|
Attachment 5: Nucl.Phys.A_1996_de_Oliveira.pdf
|
|