  MUGAST, Page 115 of 132  Not logged in MUGAST
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede768s Tue Jul 16 15:13:01 2019 Jenn, DIegoVAMOSGeneral Brho
Attachment 1: E768_BRHO.pdf
E768_BRHO.pdf
Fixede768s Sun Jul 28 04:22:15 2019 Jenn, Andres and DanieleBEAMGeneralN/ABeam problems and DC trip
- Updated from PCP about the problem with the beam: cyclotron went down and estimation of ~5h to have the beam back.
- After the beam went down, the Drift Chambers tripped making all the other biases go down (crate problem?). We tried to recover the biases but they don't go up. We decided not to call Diego at the moment, as the beam will take long to come back. We will call him when we have more news from PCP.
- Checked the water tray of MUGAST cooling system: seems ok.
Attachment 1: IMG_20190728_043633.jpg
IMG_20190728_043633.jpg
Fixede775s Tue Feb 25 02:16:36 2020 Jenn and KseniiaONLINEGeneralCD2Screenshots run 128
VAMOS TRIGGER: 7.3 e4 pps
Attachment 1: run128_MG_impact.png
run128_MG_impact.png
Attachment 2: run128_MG_ETOF.png
run128_MG_ETOF.png
Attachment 3: run128_MG_TAC.png
run128_MG_TAC.png
Attachment 4: run128_MG_corr.png
run128_MG_corr.png
Attachment 5: run128_MG_STRX.png
run128_MG_STRX.png
Attachment 6: run128_MG_THETA_E.png
run128_MG_THETA_E.png
Fixede768s Sun Jul 28 01:11:41 2019 Jenn and AndresONLINEGeneralLiFScreenshots run 154 @ 01h00
Attachment 1: Tab8_run154_6.png
Tab8_run154_6.png
Attachment 2: IC_IC_run154_6.png
IC_IC_run154_6.png
Attachment 3: REC_run154_6.png
REC_run154_6.png
Attachment 4: TACS_run154_6.png
TACS_run154_6.png
Attachment 5: IC_run154_6.png
IC_run154_6.png
Attachment 6: MW_run154_6_2.png
MW_run154_6_2.png
Attachment 7: MW_run154_6.png
MW_run154_6.png
Attachment 8: DC_Y_run154_6.png
DC_Y_run154_6.png
Attachment 9: DC_X_run154_6.png
DC_X_run154_6.png
Attachment 10: Tab_10_run154_6.png
Tab_10_run154_6.png
Attachment 11: Tab_9_run154_6.png
Tab_9_run154_6.png
Attachment 12: Tab_8bis_run154_6.png
Tab_8bis_run154_6.png
Attachment 13: Correlation_run154_6.png
Correlation_run154_6.png
Attachment 14: TAC_run154_6.png
TAC_run154_6.png
Attachment 15: MG_ToF_run154_6.png
MG_ToF_run154_6.png
Attachment 16: MM_DeE_run154_6.png
MM_DeE_run154_6.png
Attachment 17: MM_ToF_run154_6.png
MM_ToF_run154_6.png
Attachment 18: MG_IMPACT_MATRIX_run154_6.png
MG_IMPACT_MATRIX_run154_6.png
Attachment 19: MM_IMPACT_MATRIX-run154-6.png
MM_IMPACT_MATRIX-run154-6.png
Fixede768s Sun Jul 28 01:49:25 2019 Jenn and AndresONLINEGeneralLiFBeam profile and scaler run 154 overnight
OR VAMOS ~ 500
BEAM Profiler ~ 1.4e7
Attachment 1: Scalers_run154_6.png
Scalers_run154_6.png
Attachment 2: Beam_profiler.jpg
Beam_profiler.jpg
Fixede768s Sun Jul 28 03:26:54 2019 Jenn and AndresRUNGeneralLiFSTOP RUN 154
At 3:00 am beam went off. We called PCP and they told us that they had some problems they need to fix and that it might take long.
Therefore we decided to stop the run and put the Faraday cup.
PCP will call when they deliver again the beam.
Fixedcom2019 Fri Apr 5 19:42:28 2019 Jenn Sanchez & Ana Montaner-PizáOTHERGeneralCD2PACE4 calculations

Attached you can find the PACE4 calculations for the reactions 16O + 12C and 16O + d at 6 MeV/u beam.

Main cross sections are:
* 25Mg (232 mb, 25%) and 16O (182, 21%) (for 16O+12C).
* 17O (292 mb, 42%) and 14N (270, 39%) (for 16O+d).





Attachment 1: 16O_12C.png
16O_12C.png
Attachment 2: 16O_d.png
16O_d.png
Fixede768s Tue Jul 30 04:25:49 2019 Jenn & Franco & TeodoraBEAMGeneralLiFBeam intensity, profile check and SUMMARY night

This is what we were seeing in agata. We think it might be possible we were having a bit of beam implanted somewhere. We called PCP to check.



Jenn & Franco wrote:
In run 158 at around 01:00am PCP took the beam to try to optimize it. We got the beam back after ~15 minutes.

Beam intensity ~1.2e7
OR MUGAST ~ 160
OR VAMOS ~ 650

30 minutes later: comparing the actual beam profile with the previous ones it looks like the beam has shifted on the horizontal axis (before the centroid was -1.9, now it is -3.4).
At the same time we noticed an increase in the AGATA counting rate (~ 35k). AGATA itself is not very stable, each now and then all the detectors go in back pressure for few
seconds and then they come back to the normal status. Moreover we see more counts on the second line in the correlation matrix (see figure attached). We think that maybe
with the last optimization the beam is slightly touching somewhere out of the target.

At 02:15am there was a problem with the vacuum on the PCP side so the beam went off. We wait for a guy to come in ~45min and solve this issue or understand WThell is happening.
RUN 158 won't be stopped to avoid DAQ problems.

TO UNDERSTAND: even after beam stopped 30 min ago, OR Vamos is still counting ~100 Hz while AGATA and MUGAST are counting nothing.
Attachment 1: IMG_20190730_042215.jpg
IMG_20190730_042215.jpg
Fixede768s Tue Jul 30 04:40:18 2019 Jenn & Franco & TeodoraRUNGeneralLiFBeam back at 4.00 h
Due to the high rate of AGATA and Mugast (probably due to some implantation) we asked the PCP to readjust the beam.
They centered it a bit more on the profiler and now it looks better. Attached are the new rates.

OR VAMOS ~ 620
OR MUGAST ~ 170
OR AGATA ~ 7k


Jenn & Franco wrote:
We had the beam back at 4.00 a.m.
Beam profile and intensity checked: 1.2e7

OR VAMOS ~ 630
OR MUGAST ~ 170
OR AGATA ~ 35k
Attachment 1: scaler_6.png
scaler_6.png
Attachment 2: IMG-20190730-WA0000.jpg
IMG-20190730-WA0000.jpg
Fixede768s Tue Jul 30 01:20:21 2019 Jenn & FrancoBEAMGeneralLiFBeam intensity, profile check and SUMMARY night
In run 158 at around 01:00am PCP took the beam to try to optimize it. We got the beam back after ~15 minutes.

Beam intensity ~1.2e7
OR MUGAST ~ 160
OR VAMOS ~ 650

30 minutes later: comparing the actual beam profile with the previous ones it looks like the beam has shifted on the horizontal axis (before the centroid was -1.9, now it is -3.4).
At the same time we noticed an increase in the AGATA counting rate (~ 35k). AGATA itself is not very stable, each now and then all the detectors go in back pressure for few
seconds and then they come back to the normal status. Moreover we see more counts on the second line in the correlation matrix (see figure attached). We think that maybe
with the last optimization the beam is slightly touching somewhere out of the target.

At 02:15am there was a problem with the vacuum on the PCP side so the beam went off. We wait for a guy to come in ~45min and solve this issue or understand WThell is happening.
RUN 158 won't be stopped to avoid DAQ problems.

TO UNDERSTAND: even after beam stopped 30 min ago, OR Vamos is still counting ~100 Hz while AGATA and MUGAST are counting nothing.
Attachment 1: photo_2019-07-30_00-19-19.jpg
photo_2019-07-30_00-19-19.jpg
Attachment 2: scaler_4.png
scaler_4.png
Attachment 3: correlation.png
correlation.png
Fixede768s Tue Jul 30 04:04:27 2019 Jenn & FrancoRUNGeneralLiFBeam back at 4.00 h
We had the beam back at 4.00 a.m.
Beam profile and intensity checked: 1.2e7

OR VAMOS ~ 630
OR MUGAST ~ 170
OR AGATA ~ 35k

The AGATA rate is still very high.
Attachment 1: scaler_5.png
scaler_5.png
Attachment 2: IMG_20190730_040124.jpg
IMG_20190730_040124.jpg
Fixede768s Sun Jul 21 01:57:59 2019 Jenn & FranckONLINEGeneralLiFScreenshots run 119
Attachment 1: Diamond_r119_1.png
Diamond_r119_1.png
Attachment 2: Scalers_r119_1.png
Scalers_r119_1.png
Attachment 3: DCX_1d_r119_1.png
DCX_1d_r119_1.png
Attachment 4: IC_IC_r119_1.png
IC_IC_r119_1.png
Attachment 5: FP_r119_1.png
FP_r119_1.png
Attachment 6: Tmg_vamos_r119_1.png
Tmg_vamos_r119_1.png
Attachment 7: IC_r119_1.png
IC_r119_1.png
Attachment 8: MW_r119_1.png
MW_r119_1.png
Attachment 9: Ewire_r119_1.png
Ewire_r119_1.png
Attachment 10: Twire_r119_1.png
Twire_r119_1.png
Attachment 11: DCX_r119_1.png
DCX_r119_1.png
Attachment 12: mg_eraw_r119_1.png
mg_eraw_r119_1.png
Attachment 13: mg_timecal_r119_1.png
mg_timecal_r119_1.png
Attachment 14: ADC_r119_1.png
ADC_r119_1.png
Attachment 15: corr_r119_1.png
corr_r119_1.png
Attachment 16: TACs_r119_1.png
TACs_r119_1.png
Attachment 17: mg_etof_r119_1.png
mg_etof_r119_1.png
Attachment 18: mm_ede_r119_1.png
mm_ede_r119_1.png
Attachment 19: mm_etof_r119_1.png
mm_etof_r119_1.png
Attachment 20: mg_impact_r119_1.png
mg_impact_r119_1.png
Attachment 21: mm_impact_r119_1.png
mm_impact_r119_1.png
Fixede768s Sun Jul 21 04:48:52 2019 Jenn & FranckBEAMGeneralN/ABeam intensity check
OR Vamos: 1300 /s
Vamos gas profiler: 1.7x10^7 pps
Fixede768s Tue Jul 23 06:49:54 2019 Jenn & Christian & KseniiaBEAMGeneral Beam intensity and profile check
VAMOS OR ~ 870
BEAM INTENSITY ~ 1.4E7
Attachment 1: photo_2019-07-23_05-50-19.jpg
photo_2019-07-23_05-50-19.jpg
Fixede768s Tue Jul 23 04:31:34 2019 Jenn & ChristianBEAMGeneral Diamond Scaler screenshot
Attachment 1: diamondscaler_run126_3.png
diamondscaler_run126_3.png
Fixede768s Tue Jul 23 04:34:03 2019 Jenn & ChristianBEAMGeneral Beam intensity and profile check
VAMOS OR: ~1200
BEAM INTENSITY ~ 2E7
Attachment 1: photo_2019-07-23_03-26-41.jpg
photo_2019-07-23_03-26-41.jpg
Fixedcom2019 Thu Apr 4 14:41:52 2019 JennTARGETGeneralN/AMask


Image of the Mask position in the target frame.
Fixede768s Tue Jul 16 15:32:05 2019 JennOTHERGeneral Shift table google schedule link
Please, see below the spreadsheet with the shift schedule.

https://docs.google.com/spreadsheets/d/1NcidygPHZhcBTr5j6TMV7oaz7jJcAoLt4q_sOz813Cg/edit?usp=sharing
Fixede768s Wed Jul 17 11:36:53 2019 JennVAMOSGeneral M/Q values

Values of M/Q for possible recoils on the focal plane

          M/Q

15N   15/7   2.14

15N   15/6   2.5 

19F   19/9   2.11

19F   19/8   2.38

20F    20/9  2.22

20F    20/8   2.5

Fixede768s Thu Jul 18 22:10:58 2019 JennOTHERGeneral Previous Papers
Attachment 1: Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdf
Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdf Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdf Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdf Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdf Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdf Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdf Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdf Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdf
Attachment 2: Phys.Rev.C_2010_Fortune.pdf
Phys.Rev.C_2010_Fortune.pdf Phys.Rev.C_2010_Fortune.pdf Phys.Rev.C_2010_Fortune.pdf Phys.Rev.C_2010_Fortune.pdf Phys.Rev.C_2010_Fortune.pdf
Attachment 3: Phys.Rev.C_2003_Fortune.pdf
Phys.Rev.C_2003_Fortune.pdf Phys.Rev.C_2003_Fortune.pdf Phys.Rev.C_2003_Fortune.pdf
Attachment 4: Phys.Rev.C_1996_Mao.pdf
Phys.Rev.C_1996_Mao.pdf Phys.Rev.C_1996_Mao.pdf Phys.Rev.C_1996_Mao.pdf Phys.Rev.C_1996_Mao.pdf Phys.Rev.C_1996_Mao.pdf Phys.Rev.C_1996_Mao.pdf Phys.Rev.C_1996_Mao.pdf Phys.Rev.C_1996_Mao.pdf
Attachment 5: Nucl.Phys.A_1996_de_Oliveira.pdf
Nucl.Phys.A_1996_de_Oliveira.pdf Nucl.Phys.A_1996_de_Oliveira.pdf Nucl.Phys.A_1996_de_Oliveira.pdf Nucl.Phys.A_1996_de_Oliveira.pdf Nucl.Phys.A_1996_de_Oliveira.pdf Nucl.Phys.A_1996_de_Oliveira.pdf Nucl.Phys.A_1996_de_Oliveira.pdf Nucl.Phys.A_1996_de_Oliveira.pdf

ELOG Home Page