Fixed, e793s, Mon Feb 8 11:28:38 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 610
- MUVI: MUVI3
|
Fixed, e793s, Mon Feb 8 16:20:42 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 611
- MUVI: MUVI2
|
Fixed, e793s, Mon Feb 8 16:33:22 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 612
- MUVI: MUVI2
|
Fixed, e793s, Fri Feb 12 08:52:30 2021, mugast, RUN, General, 3-alpha, run 613: long alpha run
|
all Muvi in trigger, mugast stand alone. all detector Bias on. |
Fixed, e793s, Fri Feb 12 18:07:24 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 614
- MUVI: MUVI2
|
Fixed, e793s, Fri Feb 12 18:12:00 2021, Adrien, S1, Hardware, N/A, Kapton change
|
Arnaud open today and change the Y Kapton (YA5) of the S1. Everything under vacuum/cooled again so I ran FSC, hopefully this will fix the issue we have
with the Junction side. |
Fixed, e793s, Fri Feb 12 18:19:52 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 615
- MUVI: MUVI2
|
Ongoing, e793s, Wed Mar 3 17:12:57 2021, Franco, S1, Hardware, N/A, Schema of the new S1
|
The signals of the new S1 will be splitted among 6 Mugast boards, according to the scheme attached.
The HV for the S1 have been updated accordingly, with labels like MG11/CsIMGXX. |
Fixed, e793s, Wed Mar 3 17:18:42 2021, Franco, GRIT, General, N/A, MUVI's scheme and connections on the chamber 
|
|
Fixed, e775s, Thu Mar 4 10:45:42 2021, OttoRun, RUN, General, N/A, Run200
|
*************************
[SIZE=3][B]Run : 200[/B][/SIZE]
*************************
|
Fixed, e793s, Fri Mar 5 16:14:21 2021, OttoRun, RUN, General, 3-alpha, Run618   
|
*************************
[SIZE=3][B]Run : 618[/B][/SIZE]
*************************
|
Fixed, e793s, Fri Mar 5 16:16:28 2021, mugast, DAQ, Software, , Pedestals for E793S 12x
|
Pedestal alignment was performed for Energy qnd Time for all cards with cooling at 0°.
The values are attached here and saved in : cd ganacq_manip/mugast/das-save/pedestal-save/pedestal_5march2021_15h54/ |
Fixed, e793s, Fri Mar 5 16:31:08 2021, OttoRun, RUN, General, 3-alpha, Run619
|
*************************
[SIZE=3][B]Run :619[/B][/SIZE]
*************************
|
Fixed, e793s, Fri Mar 5 16:39:08 2021, OttoRun, RUN, General, 3-alpha, Run620
|
*************************
[SIZE=3][B]Run : 620[/B][/SIZE]
*************************
|
Fixed, e793s, Fri Mar 5 16:50:55 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 622
- MUVI: MUVI1
|
Fixed, TEST, Fri Mar 5 16:54:24 2021, OttoH.V., OTHER, Hardware, N/A, HVM_SUMMARY
|
[SIZE=5][COLOR=green][B]*** hvm watcher summary ***[/B] [/COLOR][/SIZE]
[SIZE=2][COLOR=green]+10V/t1234 [/COLOR] Slot: [COLOR=blue]3 [/COLOR] (A1516B) Channel:[COLOR=blue]5 [/COLOR] Vmon: [COLOR=blue] 9.99 V [/COLOR] Imon:
[COLOR=blue]0.159 A [/COLOR] Status: [COLOR=green]On[/COLOR]
|
Fixed, TEST, Fri Mar 5 16:54:24 2021, OttoH.V., OTHER, Hardware, N/A, HVM_SUMMARY
|
[SIZE=5][COLOR=green][B]*** hvm watcher summary ***[/B] [/COLOR][/SIZE]
[SIZE=2][COLOR=green]+10v/mg [/COLOR] Slot: [COLOR=blue]5 [/COLOR] (A1516B) Channel:[COLOR=blue]5 [/COLOR] Vmon: [COLOR=blue] 10 V [/COLOR] Imon:
[COLOR=blue]0.407 A [/COLOR] Status: [COLOR=green]On[/COLOR]
|
Fixed, TEST, Fri Mar 5 16:54:25 2021, OttoH.V., OTHER, Hardware, N/A, HVM_SUMMARY
|
[SIZE=5][COLOR=green][B]*** hvm watcher summary ***[/B] [/COLOR][/SIZE]
[SIZE=2][COLOR=green] [/COLOR] Slot: [COLOR=blue]8 [/COLOR] (A1821H) Channel:[COLOR=blue]1 [/COLOR] Vmon: [COLOR=blue] 0 V [/COLOR] Imon:
[COLOR=blue] 0 uA[/COLOR] Status: [COLOR=pink]Off[/COLOR]
|
Fixed, e793s, Fri Mar 5 17:01:27 2021, mugast, S1, Hardware, N/A, Giving up on S1
|
We mounted the new S1 detector from Surrey with a new custom cable on several MUFEE cards using the CsI ASICs.
We managed to put voltage on it and get decent leakage current.
We modified the DAS parameters from CsI values to Si values (gain, shaping time, etc).
|
Fixed, e793s, Fri Mar 5 17:03:02 2021, OttoTime, RUN, General, N/A, TimeCalibratorRun
|
*** Run Time Calibrator FSC ***
- Run: 623
- MUVI: MUVI1
|
|