MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 114 of 132  Not logged in MUGAST
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede768s Fri Jul 26 05:57:04 2019 Kseniia, FranckONLINEGeneralLiFRun 149 screenshots
A second beam component is visible in particular in IC energy losses (with Z larger than 7) and in MW.
This probably corresponds to the 15O from the Spiral target-ion source being warmed up by the primary beam that has increased overnight (~1200 W at 5:45 am).
Checked by reducing the primary intensity for a few minutes: the second component decreased to a level comparable to that at the beginning of run 149.
Attachment 1: Scalers_run149_2.png
Scalers_run149_2.png
Attachment 2: Corr_run149_2.png
Corr_run149_2.png
Attachment 3: T_AgHF_run149_2.png
T_AgHF_run149_2.png
Attachment 4: MG_ETof_run149_2.png
MG_ETof_run149_2.png
Attachment 5: MM_EdE_run149_2.png
MM_EdE_run149_2.png
Attachment 6: MM_ETof_run149_2.png
MM_ETof_run149_2.png
Attachment 7: MG_imp_run149_2.png
MG_imp_run149_2.png
Attachment 8: MM_imp_run149_2.png
MM_imp_run149_2.png
Attachment 9: DCx_run149_2.png
DCx_run149_2.png
Attachment 10: IC_dEdE_run149_2.png
IC_dEdE_run149_2.png
Attachment 11: FP_run149_2.png
FP_run149_2.png
Attachment 12: TACS_run149_2.png
TACS_run149_2.png
Attachment 13: IC_run149_2.png
IC_run149_2.png
Attachment 14: MW_run149_2.png
MW_run149_2.png
Attachment 15: Ewire_run149_2.png
Ewire_run149_2.png
Attachment 16: Twire_run149_2.png
Twire_run149_2.png
Attachment 17: SumDC_run149_2.png
SumDC_run149_2.png
Fixede744s Tue Apr 16 08:30:58 2019 Kseniia, DieterAGATASocialCH2AGATA count rate over the last 12 hours
Attachment 1: 37.png
37.png
Ongoing  Sat Jul 20 09:32:02 2019 Kseniia, Christian, Nikola,OTHERGeneral summary of the morning shift
timeline of run 116

09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
10:30 resync AGATA crustal 13C, AGATA was in back-preassure for ~3 min
10:40 run 116 stopped (PCP called, they have a problem with primary beam high intensity reader, they called in the on-call people)
Fixede768s Wed Jul 17 13:55:54 2019 Kseniia et alMUST2Hardware The silicons are polarised again
The LV and HV cards are now in the spare crate brought from Orsay. The detectors are polarised; network connection not working just yet. The leakage currents are as follows:
Attachment 1: E860E1DA-73FB-4BF2-8A5D-CBF80580F0AC.jpeg
E860E1DA-73FB-4BF2-8A5D-CBF80580F0AC.jpeg
Attachment 2: D722B2E9-71F2-4C9E-BFB4-4ECEA1B84B45.jpeg
D722B2E9-71F2-4C9E-BFB4-4ECEA1B84B45.jpeg
Fixede768s Sun Jul 21 22:40:23 2019 Kseniia & NicolasBEAMGeneralN/Abeam check run121
best intensity ever: 2.2e7 pps
Attachment 1: IMG_20190721_223618_beamcheck.jpg
IMG_20190721_223618_beamcheck.jpg
Attachment 2: scalers_1.png
scalers_1.png
Fixed  Wed Jul 17 10:25:26 2019 KseniiaMUST2Hardware The burnt crate
Here’s what the 48V power supply of the damaged crate looks like inside
Fixed  Sun Jul 21 22:28:11 2019 KseniiaAGATAGeneral 15O implantation
Attached is the intensity distribution of 511 keV in run 119 (first image) vs run 120 (second image).
In between the two runs, beam optics was twitched.

These are the segments of crystal 02A which is near the beam pipe. Bottom is the tip of the detector, top is the
tail.
In run 119 it looks that the pillars that are near the beam line (columns 4 and 5) were seeing 511 more or less
homogeneously, which means that we are implanting 15O all over the pipe.
In run 120 looks like we still implant in the pipe, but also we implant a lot more at the target level.
Attachment 1: run119_02A.png
run119_02A.png
Attachment 2: run120_02A.png
run120_02A.png
Fixed  Sun Jul 21 23:18:25 2019 KseniiaAGATAGeneral Current total stats on 19Ne
Runs 112, 115, 116, 117, 118, 119, 120 and ~1h of 121

We see 3 peak candidates with energies not matching anything known
Attachment 1: 58.png
58.png
Fixed  Mon Jul 22 12:33:17 2019 KseniiaAGATAGeneral Stats on 19Ne
Full stats for runs 112..124 with the event-by-event Doppler correction. So, we see 4140 kev.
Also, the betas of all the 19Ne with Q= 9,10 identified in VAMOS
Attachment 1: runs112-124-ebe.png
runs112-124-ebe.png
Attachment 2: run112-124-ebe.png
run112-124-ebe.png
Attachment 3: beta19Ne.png
beta19Ne.png
Fixed  Mon Jul 22 12:54:25 2019 KseniiaAGATAGeneral Beta vs gamma-ray energy in 19Ne, runs 112-124
Attachment 1: betaVSgamma.png
betaVSgamma.png
Fixed  Mon Jul 22 19:13:45 2019 KseniiaAGATAGeneral Current stats on 19Ne
Runs 112..125, still no joy...
Attachment 1: 112-125.png
112-125.png
Fixede768s Fri Jul 26 08:56:50 2019 KseniiaAGATAGeneralLiF135-149 run Gamma analysis
19F Q8 charge state identified in VAMOS
Still no clear peak at 3908 keV...
Attachment 1: 27.png
27.png
Attachment 2: 10.png
10.png
Fixede768s Fri Jul 26 15:48:12 2019 KseniiaAGATAGeneral Full stats with AGATA on 19F with the 15N beam
Charge state 8 (plus zooms) and charge state 7;
Statistics of all the 15N runs combined;
Identification in VAMOS;

Alas, no clear peaks at 3908 and 2354.
Attachment 1: 19F_Q8_tot.png
19F_Q8_tot.png
Attachment 2: 19F_Q8_zoom1.png
19F_Q8_zoom1.png
Attachment 3: F19_Q8_tot_zoom2.png
F19_Q8_tot_zoom2.png
Attachment 4: 19F_Q7_total.png
19F_Q7_total.png
Fixede768s Fri Jul 26 19:09:48 2019 KseniiaAGATAGeneralLiF135-149 run Gamma analysis
Gamma-gamma gated on 109-keV transition (and on VAMOS)
Attachment 1: gg190_19F_all.png
gg190_19F_all.png
Fixede768s Fri Jul 26 19:36:03 2019 KseniiaAGATAGeneral 19Ne gammas, current full stat
19Ne, VAMOS-identified
All runs from before + runs 151, 152part
Attachment 1: 19Ne_112to152part.png
19Ne_112to152part.png
Fixede744s Sat Apr 13 17:03:14 2019 Jérémie & FrançoisOFFLINEGeneral first gamma spectrum
After a few hours run.
Attachment 1: 35gamma.png
35gamma.png
Fixede793s Sun Mar 14 10:01:36 2021 Juan Lois & faïrouz & AdrienBEAMHardwareCD2Beam intensity escalated up to 1.6e6 pps
At 9:57 the intensity increased up to 1.6e6 pps and we had to call the pcp to put it again to the normal values.

It was solved by 10:07 .

Same incidence happend at 10:17 and then again at 10h30.

The beam operators close little bit the slits to decrease the beam intensity.
The intensity is now 3.e5 pps
Attachment 1: BeanItensityJump_09h57_14_03_21.png
BeanItensityJump_09h57_14_03_21.png
Attachment 2: Scaler_graph_10h47.png
Scaler_graph_10h47.png
Fixede793s Sat Mar 13 01:41:21 2021 Juan Lois & faïrouzRUNGeneralCD2run61 screenshots at 1h40
Attachment 1: run61_TAC_01h35.png
run61_TAC_01h35.png
Attachment 2: run61_MG_ToF_01h35.png
run61_MG_ToF_01h35.png
Attachment 3: run61_MM_DeE_01h35.png
run61_MM_DeE_01h35.png
Attachment 4: run61_MM_ToF_01h35.png
run61_MM_ToF_01h35.png
Attachment 5: run61_MG_IMPACT_MATRIX_01h35.png
run61_MG_IMPACT_MATRIX_01h35.png
Attachment 6: run61_Vamos-MW_01h35.png
run61_Vamos-MW_01h35.png
Attachment 7: run61_MM_IMPACT_MATRIX_01h35.png
run61_MM_IMPACT_MATRIX_01h35.png
Attachment 8: run61_Scalers_01h34.png
run61_Scalers_01h34.png
Fixede744s Fri Apr 12 01:56:35 2019 Jenn, Louis, Cyril,Daniele and ChloeBEAMGeneralEmptyBrho for the new 14O setting RUN86
CATS2 on and target position 1: hole
Beam intensity in CATS: 4E4
VAMOS intensity 1.3E4

CATS2 off and target position 1 = hole
Beam intensity in VAMOS = 4e4 pps (~100% transmission)
Attachment 1: Brho_14O_run86.png
Brho_14O_run86.png
Attachment 2: 20190412_193918.jpg
20190412_193918.jpg
Fixede768s Fri Jul 19 08:09:21 2019 Jenn, KseniiaOTHERGeneral Overview nightshift run 112
Smooth night, everything was working properly.
Checked agata rootfile to see preliminary gammas.

19Ne 275 state observed

Also 19F (strong 109 state) (fusion-evaporation?)

Check Agata elog for more details.

ELOG Home Page