MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 114 of 132  Not logged in MUGAST
Fixed, e768s, Fri Jul 26 05:57:04 2019, Kseniia, Franck, ONLINE, General, LiF, Run 149 screenshots 17x
A second beam component is visible in particular in IC energy losses (with Z larger than 7) and in MW.
This probably corresponds to the 15O from the Spiral target-ion source being warmed up by the primary beam that has increased overnight (~1200 W at 5:45 am).
Checked by reducing the primary intensity for a few minutes: the second component decreased to a level comparable to that at the beginning of run 149.
Fixed, e744s, Tue Apr 16 08:30:58 2019, Kseniia, Dieter, AGATA, Social, CH2, AGATA count rate over the last 12 hours 37.png
Ongoing, , Sat Jul 20 09:32:02 2019, Kseniia, Christian, Nikola,, OTHER, General, , summary of the morning shift 
timeline of run 116

09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
10:30 resync AGATA crustal 13C, AGATA was in back-preassure for ~3 min
10:40 run 116 stopped (PCP called, they have a problem with primary beam high intensity reader, they called in the on-call people)
Fixed, e768s, Wed Jul 17 13:55:54 2019, Kseniia et al, MUST2, Hardware, , The silicons are polarised again E860E1DA-73FB-4BF2-8A5D-CBF80580F0AC.jpegD722B2E9-71F2-4C9E-BFB4-4ECEA1B84B45.jpeg
The LV and HV cards are now in the spare crate brought from Orsay. The detectors are polarised; network connection not working just yet. The leakage currents are as follows:
Fixed, e768s, Sun Jul 21 22:40:23 2019, Kseniia & Nicolas, BEAM, General, N/A, beam check run121 IMG_20190721_223618_beamcheck.jpgscalers_1.png
best intensity ever: 2.2e7 pps
Fixed, , Wed Jul 17 10:25:26 2019, Kseniia, MUST2, Hardware, , The burnt crate 58CAA1B9-97A5-4711-AEAA-A4167EC192E3.jpeg
Here’s what the 48V power supply of the damaged crate looks like inside
Fixed, , Sun Jul 21 22:28:11 2019, Kseniia, AGATA, General, , 15O implantation  run119_02A.pngrun120_02A.png
Attached is the intensity distribution of 511 keV in run 119 (first image) vs run 120 (second image).
In between the two runs, beam optics was twitched.

These are the segments of crystal 02A which is near the beam pipe. Bottom is the tip of the detector, top is the
tail.
In run 119 it looks that the pillars that are near the beam line (columns 4 and 5) were seeing 511 more or less
homogeneously, which means that we are implanting 15O all over the pipe.
In run 120 looks like we still implant in the pipe, but also we implant a lot more at the target level.
Fixed, , Sun Jul 21 23:18:25 2019, Kseniia, AGATA, General, , Current total stats on 19Ne  58.png
Runs 112, 115, 116, 117, 118, 119, 120 and ~1h of 121

We see 3 peak candidates with energies not matching anything known
Fixed, , Mon Jul 22 12:33:17 2019, Kseniia, AGATA, General, , Stats on 19Ne runs112-124-ebe.pngrun112-124-ebe.pngbeta19Ne.png
Full stats for runs 112..124 with the event-by-event Doppler correction. So, we see 4140 kev.
Also, the betas of all the 19Ne with Q= 9,10 identified in VAMOS
Fixed, , Mon Jul 22 12:54:25 2019, Kseniia, AGATA, General, , Beta vs gamma-ray energy in 19Ne, runs 112-124 betaVSgamma.png
Fixed, , Mon Jul 22 19:13:45 2019, Kseniia, AGATA, General, , Current stats on 19Ne 112-125.png
Runs 112..125, still no joy...
Fixed, e768s, Fri Jul 26 08:56:50 2019, Kseniia, AGATA, General, LiF, 135-149 run Gamma analysis 27.png10.png
19F Q8 charge state identified in VAMOS
Still no clear peak at 3908 keV...
Fixed, e768s, Fri Jul 26 15:48:12 2019, Kseniia, AGATA, General, , Full stats with AGATA on 19F with the 15N beam 19F_Q8_tot.png19F_Q8_zoom1.pngF19_Q8_tot_zoom2.png19F_Q7_total.png
Charge state 8 (plus zooms) and charge state 7;
Statistics of all the 15N runs combined;
Identification in VAMOS;

Alas, no clear peaks at 3908 and 2354.
    Fixed, e768s, Fri Jul 26 19:09:48 2019, Kseniia, AGATA, General, LiF, 135-149 run Gamma analysis gg190_19F_all.png
Gamma-gamma gated on 109-keV transition (and on VAMOS)
Fixed, e768s, Fri Jul 26 19:36:03 2019, Kseniia, AGATA, General, , 19Ne gammas, current full stat 19Ne_112to152part.png
19Ne, VAMOS-identified
All runs from before + runs 151, 152part
Fixed, e744s, Sat Apr 13 17:03:14 2019, Jérémie & François, OFFLINE, General, , first gamma spectrum 35gamma.png
After a few hours run.
Fixed, e793s, Sun Mar 14 10:01:36 2021, Juan Lois & faïrouz & Adrien, BEAM, Hardware, CD2, Beam intensity escalated up to 1.6e6 pps BeanItensityJump_09h57_14_03_21.pngScaler_graph_10h47.png
At 9:57 the intensity increased up to 1.6e6 pps and we had to call the pcp to put it again to the normal values.

It was solved by 10:07 .

Same incidence happend at 10:17 and then again at 10h30.

The beam operators close little bit the slits to decrease the beam intensity.
The intensity is now 3.e5 pps
Fixed, e793s, Sat Mar 13 01:41:21 2021, Juan Lois & faïrouz, RUN, General, CD2, run61 screenshots at 1h40 8x
Fixed, e744s, Fri Apr 12 01:56:35 2019, Jenn, Louis, Cyril,Daniele and Chloe, BEAM, General, Empty, Brho for the new 14O setting RUN86 Brho_14O_run86.png20190412_193918.jpg
CATS2 on and target position 1: hole
Beam intensity in CATS: 4E4
VAMOS intensity 1.3E4

CATS2 off and target position 1 = hole
Beam intensity in VAMOS = 4e4 pps (~100% transmission)
Fixed, e768s, Fri Jul 19 08:09:21 2019, Jenn, Kseniia, OTHER, General, , Overview nightshift run 112 
Smooth night, everything was working properly.
Checked agata rootfile to see preliminary gammas.

19Ne 275 state observed

Also 19F (strong 109 state) (fusion-evaporation?)

Check Agata elog for more details.

ELOG Home Page