Fixed, e768s, Fri Jul 26 05:57:04 2019, Kseniia, Franck, ONLINE, General, LiF, Run 149 screenshots 17x
|
A second beam component is visible in particular in IC energy losses (with Z larger than 7) and in MW.
This probably corresponds to the 15O from the Spiral target-ion source being warmed up by the primary beam that has increased overnight (~1200 W at 5:45
am).
|
Fixed, e744s, Tue Apr 16 08:30:58 2019, Kseniia, Dieter, AGATA, Social, CH2, AGATA count rate over the last 12 hours
|
|
Ongoing, , Sat Jul 20 09:32:02 2019, Kseniia, Christian, Nikola,, OTHER, General, , summary of the morning shift
|
timeline of run 116
09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
|
Fixed, e768s, Wed Jul 17 13:55:54 2019, Kseniia et al, MUST2, Hardware, , The silicons are polarised again 
|
The LV and HV cards are now in the spare crate brought from Orsay. The detectors are polarised; network connection not working just yet. The leakage currents
are as follows: |
Fixed, e768s, Sun Jul 21 22:40:23 2019, Kseniia & Nicolas, BEAM, General, N/A, beam check run121 
|
best intensity ever: 2.2e7 pps |
Fixed, , Wed Jul 17 10:25:26 2019, Kseniia, MUST2, Hardware, , The burnt crate
|
Here’s what the 48V power supply of the damaged crate looks like inside
[IMG]elog:5072/1[/IMG] |
Fixed, , Sun Jul 21 22:28:11 2019, Kseniia, AGATA, General, , 15O implantation 
|
Attached is the intensity distribution of 511 keV in run 119 (first image) vs run 120 (second image).
In between the two runs, beam optics was twitched.
|
Fixed, , Sun Jul 21 23:18:25 2019, Kseniia, AGATA, General, , Current total stats on 19Ne
|
Runs 112, 115, 116, 117, 118, 119, 120 and ~1h of 121
We see 3 peak candidates with energies not matching anything known |
Fixed, , Mon Jul 22 12:33:17 2019, Kseniia, AGATA, General, , Stats on 19Ne  
|
Full stats for runs 112..124 with the event-by-event Doppler correction. So, we see 4140 kev.
Also, the betas of all the 19Ne with Q= 9,10 identified in VAMOS |
Fixed, , Mon Jul 22 12:54:25 2019, Kseniia, AGATA, General, , Beta vs gamma-ray energy in 19Ne, runs 112-124
|
|
Fixed, , Mon Jul 22 19:13:45 2019, Kseniia, AGATA, General, , Current stats on 19Ne
|
Runs 112..125, still no joy... |
Fixed, e768s, Fri Jul 26 08:56:50 2019, Kseniia, AGATA, General, LiF, 135-149 run Gamma analysis 
|
19F Q8 charge state identified in VAMOS
Still no clear peak at 3908 keV... |
Fixed, e768s, Fri Jul 26 15:48:12 2019, Kseniia, AGATA, General, , Full stats with AGATA on 19F with the 15N beam   
|
Charge state 8 (plus zooms) and charge state 7;
Statistics of all the 15N runs combined;
Identification in VAMOS;
|
Fixed, e768s, Fri Jul 26 19:09:48 2019, Kseniia, AGATA, General, LiF, 135-149 run Gamma analysis
|
Gamma-gamma gated on 109-keV transition (and on VAMOS) |
Fixed, e768s, Fri Jul 26 19:36:03 2019, Kseniia, AGATA, General, , 19Ne gammas, current full stat
|
19Ne, VAMOS-identified
All runs from before + runs 151, 152part |
Fixed, e744s, Sat Apr 13 17:03:14 2019, Jérémie & François, OFFLINE, General, , first gamma spectrum
|
After a few hours run. |
Fixed, e793s, Sun Mar 14 10:01:36 2021, Juan Lois & faïrouz & Adrien, BEAM, Hardware, CD2, Beam intensity escalated up to 1.6e6 pps 
|
At 9:57 the intensity increased up to 1.6e6 pps and we had to call the pcp to put it again to the normal values.
It was solved by 10:07 .
|
Fixed, e793s, Sat Mar 13 01:41:21 2021, Juan Lois & faïrouz, RUN, General, CD2, run61 screenshots at 1h40 8x
|
|
Fixed, e744s, Fri Apr 12 01:56:35 2019, Jenn, Louis, Cyril,Daniele and Chloe, BEAM, General, Empty, Brho for the new 14O setting RUN86 
|
CATS2 on and target position 1: hole
Beam intensity in CATS: 4E4
VAMOS intensity 1.3E4
|
Fixed, e768s, Fri Jul 19 08:09:21 2019, Jenn, Kseniia, OTHER, General, , Overview nightshift run 112
|
Smooth night, everything was working properly.
Checked agata rootfile to see preliminary gammas.
|
|