MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 114 of 132  Not logged in MUGAST
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede768s Fri Jul 26 05:57:04 2019 Kseniia, FranckONLINEGeneralLiFRun 149 screenshots
A second beam component is visible in particular in IC energy losses (with Z larger than 7) and in MW.
This probably corresponds to the 15O from the Spiral target-ion source being warmed up by the primary beam that has increased overnight (~1200 W at 5:45 am).
Checked by reducing the primary intensity for a few minutes: the second component decreased to a level comparable to that at the beginning of run 149.
Fixede744s Tue Apr 16 08:30:58 2019 Kseniia, DieterAGATASocialCH2AGATA count rate over the last 12 hours
Ongoing  Sat Jul 20 09:32:02 2019 Kseniia, Christian, Nikola,OTHERGeneral summary of the morning shift
timeline of run 116

09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
10:30 resync AGATA crustal 13C, AGATA was in back-preassure for ~3 min
10:40 run 116 stopped (PCP called, they have a problem with primary beam high intensity reader, they called in the on-call people)
Fixede768s Wed Jul 17 13:55:54 2019 Kseniia et alMUST2Hardware The silicons are polarised again
The LV and HV cards are now in the spare crate brought from Orsay. The detectors are polarised; network connection not working just yet. The leakage currents are as follows:
Fixede768s Sun Jul 21 22:40:23 2019 Kseniia & NicolasBEAMGeneralN/Abeam check run121
best intensity ever: 2.2e7 pps
Fixed  Wed Jul 17 10:25:26 2019 KseniiaMUST2Hardware The burnt crate
Here’s what the 48V power supply of the damaged crate looks like inside
Fixed  Sun Jul 21 22:28:11 2019 KseniiaAGATAGeneral 15O implantation
Attached is the intensity distribution of 511 keV in run 119 (first image) vs run 120 (second image).
In between the two runs, beam optics was twitched.

These are the segments of crystal 02A which is near the beam pipe. Bottom is the tip of the detector, top is the
tail.
In run 119 it looks that the pillars that are near the beam line (columns 4 and 5) were seeing 511 more or less
homogeneously, which means that we are implanting 15O all over the pipe.
In run 120 looks like we still implant in the pipe, but also we implant a lot more at the target level.
Fixed  Sun Jul 21 23:18:25 2019 KseniiaAGATAGeneral Current total stats on 19Ne
Runs 112, 115, 116, 117, 118, 119, 120 and ~1h of 121

We see 3 peak candidates with energies not matching anything known
Fixed  Mon Jul 22 12:33:17 2019 KseniiaAGATAGeneral Stats on 19Ne
Full stats for runs 112..124 with the event-by-event Doppler correction. So, we see 4140 kev.
Also, the betas of all the 19Ne with Q= 9,10 identified in VAMOS
Fixed  Mon Jul 22 12:54:25 2019 KseniiaAGATAGeneral Beta vs gamma-ray energy in 19Ne, runs 112-124
Fixed  Mon Jul 22 19:13:45 2019 KseniiaAGATAGeneral Current stats on 19Ne
Runs 112..125, still no joy...
Fixede768s Fri Jul 26 08:56:50 2019 KseniiaAGATAGeneralLiF135-149 run Gamma analysis
19F Q8 charge state identified in VAMOS
Still no clear peak at 3908 keV...
Fixede768s Fri Jul 26 15:48:12 2019 KseniiaAGATAGeneral Full stats with AGATA on 19F with the 15N beam
Charge state 8 (plus zooms) and charge state 7;
Statistics of all the 15N runs combined;
Identification in VAMOS;

Alas, no clear peaks at 3908 and 2354.
Fixede768s Fri Jul 26 19:09:48 2019 KseniiaAGATAGeneralLiF135-149 run Gamma analysis
Gamma-gamma gated on 109-keV transition (and on VAMOS)
Fixede768s Fri Jul 26 19:36:03 2019 KseniiaAGATAGeneral 19Ne gammas, current full stat
19Ne, VAMOS-identified
All runs from before + runs 151, 152part
Fixede744s Sat Apr 13 17:03:14 2019 Jérémie & FrançoisOFFLINEGeneral first gamma spectrum
After a few hours run.
Fixede793s Sun Mar 14 10:01:36 2021 Juan Lois & faïrouz & AdrienBEAMHardwareCD2Beam intensity escalated up to 1.6e6 pps
At 9:57 the intensity increased up to 1.6e6 pps and we had to call the pcp to put it again to the normal values.

It was solved by 10:07 .

Same incidence happend at 10:17 and then again at 10h30.

The beam operators close little bit the slits to decrease the beam intensity.
The intensity is now 3.e5 pps
Fixede793s Sat Mar 13 01:41:21 2021 Juan Lois & faïrouzRUNGeneralCD2run61 screenshots at 1h40
Fixede744s Fri Apr 12 01:56:35 2019 Jenn, Louis, Cyril,Daniele and ChloeBEAMGeneralEmptyBrho for the new 14O setting RUN86
CATS2 on and target position 1: hole
Beam intensity in CATS: 4E4
VAMOS intensity 1.3E4

CATS2 off and target position 1 = hole
Beam intensity in VAMOS = 4e4 pps (~100% transmission)
Fixede768s Fri Jul 19 08:09:21 2019 Jenn, KseniiaOTHERGeneral Overview nightshift run 112
Smooth night, everything was working properly.
Checked agata rootfile to see preliminary gammas.

19Ne 275 state observed

Also 19F (strong 109 state) (fusion-evaporation?)

Check Agata elog for more details.

ELOG Home Page