MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 112 of 132  Not logged in MUGAST
Fixed, e793s, Sun Mar 14 07:58:51 2021, Léo, Serge, Nishu, ONLINE, General, CD2, run62 screenshots at 7h50 11x
summary of run#62
Fixed, e793s, Sat Mar 13 09:19:14 2021, Lynda, Laetitia, Chloe, ONLINE, General, CD2, run62 screenshots at 9h10 10x
Online spectra reset at 9h20
Fixed, e793s, Sat Mar 13 10:14:16 2021, Lynda, Laetitia, Chloe, VAMOS, General, , Vamos tripped @ 10:10 & fixed run62_scaler_9h16.png
Vamos tripped around 10:10. we switched back 3 HV on
Online spectra reset to check
Fixed, e793s, Sat Mar 13 11:16:38 2021, Lynda, Laetitia, Chloe, BEAM, General, , beam lost and back 
we loose the beam around 11:12, it should be back in few minutes according to pcp.

11:18: the beam is back (3.5E5 pps)
Fixed, e793s, Sat Mar 13 11:52:26 2021, Lynda, Laetitia, Chloe, BEAM, General, CD2, Beam lost 
A security problem occurs at a door near CSS1 ( AFR alarm ), need to call the security to fix the problem
The person needs to come so it will take ~1h
Fixed, e793s, Sat Mar 13 12:07:32 2021, Lynda, Laetitia, Chloe, ONLINE, General, CD2, run 62 screenshots at 11h55 10x
 
Fixed, e793s, Sat Mar 13 14:41:28 2021, Lynda, Laetitia, Chloe, BEAM, General, CD2, Beam is back run62_scaler_graph_14h48.png
Beam is back ~ 14h35, safety problem fixed
PCP said that the source is unstable so the beam intensity will fluctuate
Fixed, e793s, Tue Mar 16 00:54:29 2021, Lynda, Cyril, Nishu, ONLINE, General, CD2, run63 screenshots at 00h45 (16/03) 10x
 
Fixed, e793s, Tue Mar 16 01:31:37 2021, Lynda, Cyril, Nishu, BEAM, General, CD2, Beam intensity increased run63_sclalers_01h35.png
We asked for a beam intensity increase around 01h10
The slits L5 were opened and more power (~ 100 W) on primary target
Now ~ 5.6e5 pps on Cats2
Fixed, e793s, Tue Mar 16 03:58:13 2021, Lynda, Cyril, Nishu, ONLINE, General, CD2, run63 screenshots at 03h45 (16/03) 10x
Beam intensity fluctuates from 5e5 pps to 6e5 pps
Fixed, e793s, Tue Mar 16 04:06:46 2021, Lynda, Cyril, Nishu, AGATA, General, CD2, counting rates AGATA 
crystal 12B counting rate is too low ~ 5 / s compared to an average of ~ 80/s - 100/ s for the other crystals
and 05B counting rate is too high from time to time reaching ~2000/s
but every thing is "green" ?!
Fixed, e793s, Tue Mar 16 06:08:02 2021, Lynda, Cyril, Nishu, RUN, General, CD2, summary of run#63 @06:00hrs 10x
we had seen sufficient decrements in the beam current from time to time in the last few hours, everything else is going smooth so far..
Fixed, e793s, Tue Mar 16 07:22:12 2021, Lynda, Cyril, Nishu, BEAM, General, CD2, Beam intensity decrease run63_sclalers_07h20_16march.png
The beam intensity decreased around 6h55 to less than 1e5 pps
It is due to a change of the state of the source, PCP is working to increase the intensity
Fixed, e786s, Tue Jun 25 03:44:12 2019, Louis, Sylvain, AGATA, General, Cryo-3He, Run 56 : AGATA gamma rays in coincidences with VAMOS, MUST2 and/or MUGAST Run56_BeamExcitation.pngrun56_K47plusMugast.pngrun56_FusionEvaporation.png
As attachment are some gamma spectra we obtained while trying several conditions on the run 056. 

*Beam excitation has been investigated by gating on PID in VAMOS. Both 46Ar and 47K were selected. Excitation of 46Ar appears clearly while no clear conclusions
Fixed, e793s, Sat Mar 13 19:54:47 2021, Louis, Sarah, OFFLINE, General, CD2, Preliminary spectroscopic factors  C2S.pnggg_gEx.pngAnaPlot.png
1) Preliminary spectroscopic factors has been extracted for the first 2- exited state @ 143 keV and for the 0- excited state @ 1985 keV. DWBA calul has
been performed by cyril for a p3/2 transfer at 0MeV and a p1/2 transfer at 2MeV. Experimental differential cross section has been extracted by normalising
the number of counts with the total number of incoming 47K (from CATS div), the number of deuteron in the target, and correcting from MUGAST geometrical
    Fixed, e793s, Mon Mar 15 13:36:42 2021, Louis, Chloe, OFFLINE, General, CD2, Ex vs Eg analysis and C2S 
[quote="Louis"]1) Summary of the the Ex vs Eg analysis with all the gamma ray identified highlighted in red. Green line shows the corresponding position
of the excited states. 
Fixed, e744s, Wed Apr 10 11:24:52 2019, Louis, OFFLINE, General, N/A, Time calibration for e744 TimeCalibMM.png
Time calibration has been done for Mugast and MUST2 using run 17 to 22.
Calibration file are in:
/home/mugast/analysis/nptool/Projects/calibration/Time/Coeff/e744
Fixed, e744s, Fri Apr 12 06:51:59 2019, Louis, BEAM, General, N/A, Brho and energy of the 14O beam DSC_3261.JPG
 
Fixed, e786s, Mon Jun 24 01:52:00 2019, Louis, OFFLINE, Software, Cryo-3He, Procedure to convert and calibrate runs 

Here is the updated procedure to convert a run, with VAMOS data.
Fixed, e786s, Mon Jun 24 05:27:21 2019, Louis, OTHER, General, Cryo-3He, Beam interuption 
Beam stopped due to a neutron excess in a restricted area. Have to call the SPR. At least 1h of interruption..

ELOG Home Page