Fixed, e744s, Sat Apr 13 14:28:00 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, General, CH2, PCP information - beam interruption 
beam interrupted to an octupole (?) failure - prevision to be back after 10-15 min (PCB info)

14:35 h beam is back
Fixed, e744s, Sat Apr 13 08:02:42 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, ONLINE, Social, CH2, Screenshots run 122 v1 21x
Fixed, e744s, Sat Apr 13 10:23:01 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, ONLINE, General, CH2, Screenshots run 122 v3 20x
Fixed, e744s, Tue Apr 16 11:48:07 2019, Marion, Dieter, Beyan, Kseniia, + everyone , ONLINE, Social, Carbon, Run 134. Carbon target. 
Run #134
Target #4 Carbon @ 8.4 mg/cm**2
Brho=0.5807 Tm
Finger at 500 mm

Pepperpot removed. Closed slits.
PCP working to provide us with ~10**5 pps on CATS.
Fixed, e744s, Tue Apr 16 08:23:38 2019, Marion, Dieter, CATS, Hardware, CH2, CATS tripping - lowering bias 
8:24 Faraday in.
-5V on CATS.
550V.
8:25 Faraday out
Fixed, e744s, Tue Apr 16 10:23:06 2019, Marion, Dieter, ONLINE, Social, CH2, Log and scalers RUN 132 @10:20 (part5) 20x
Fixed, e744s, Tue Apr 16 11:44:10 2019, Marion, Dieter, TARGET, General, Carbon, Run 133. Carbon target in 60 microns. Setting up. 
Fixed, e744s, Tue Apr 16 12:44:22 2019, Marion, Dieter, BEAM, General, Carbon, ventilation problem CSS2 12:43  run134_scaler_afterbeamrestart_13h26.png
ventilation problem CSS2 12:43

Beam back at 13h24 (see scaler attached)
Fixed, e744s, Tue Apr 16 15:53:42 2019, Marion, Dieter, ONLINE, Social, Carbon, Log and scalers RUN 134 @ 15h45 20x
Fixed, e744s, Mon Apr 15 18:07:43 2019, Marion Iulian Marlene Beyan Francois Marco, ONLINE, Social, CH2, Screenshots&Scalers Run 130 v1 22x
Fixed, e744s, Mon Apr 15 18:12:47 2019, Marion , BEAM, Hardware, CH2, Test: attempt to reduce the emittance and improve the VAMOS/CATS ratio 
Failed....remains at ~2.3 (CATS1/VAMOS)
Fixed, e744s, Mon Apr 15 18:23:57 2019, Marion, VAMOS, Hardware, CH2, Suggestion to follow the VAMOS Ewire as a function of time run130_1_VAMOS_1_1ZOOM.png
A shift in the peak position of the DC_EWIRE page could allow to follow the drift chamber wire ageing.
Fixed, e744s, Tue Apr 16 14:37:04 2019, Marion, BEAM, General, Carbon, Beam above 1.4*10**4 on cats asked to come down to ~1.1*10**5 
Fixed, e744s, Sat Apr 13 04:35:43 2019, Mariluz Nikola Nicolas, BEAM, General, CH2, Beam was back for 10 min, and lost after efficiency problem in CSS2 
VAMOS and MUGAST spectra were checked after the beam was back. Everything looks OK (e.g. similar to previous screenshots)

Waiting for beam again....
Fixed, e744s, Sat Apr 13 05:10:01 2019, Mariluz Nikola Nicolas, BEAM, General, CH2, Beam is back @ 2e4 pps (CATS) 
Beam is back, yeah!
Fixed, e744s, Sat Apr 13 06:33:35 2019, Mariluz Nikola Nicolas, RUN, General, CH2, Screenshots run120 v1 20x
FAG is 0 because screenshot was taken when run was stopped
Fixed, e793s, Sun Mar 14 00:12:41 2021, Léo, Serge, Nishu, ONLINE, General, CD2, run62 screenshots at 00h13 10x
Fixed, e793s, Sun Mar 14 02:24:22 2021, Léo, Serge, Nishu, ONLINE, General, CD2, run62 screenshots at 02:25 7x
Fixed, e793s, Sun Mar 14 03:28:43 2021, Léo, Serge, Nishu, RUN, General, CD2, Beam lost 3:20-5:55 Screenshot_from_2021-03-14_03-30-10.pngrates_14Mar21_06h04.png
we lost the beam at 03:20, source unstable

5:55 beam back
sequence of several problems, access issue, HF that went down...

now we run with 5.3e5 pps in Cats
Fixed, e793s, Sun Mar 14 06:25:33 2021, Léo, Serge, Nishu, VAMOS, Hardware, CD2, Vamos tripped @ 06:20 
the dipole tripped and the it had to be reset.(2mn)