Fixede793s Fri Mar 12 04:19:51 2021 Taras, Nishu, Chloe, CharlieRUNGeneralCD2run56 screenshots at 04h18
Images attached.
Attachment 1: run56_Scalers_04h14.png
run56_Scalers_04h14.png
Attachment 2: run56_MG-IMPACT_MATRIX_04h15.png
run56_MG-IMPACT_MATRIX_04h15.png
Attachment 3: run56_MM_ToF_04h15.png
run56_MM_ToF_04h15.png
Attachment 4: run56_MM_DeE_04h15.png
run56_MM_DeE_04h15.png
Attachment 5: run56_MG_ToF_04h15.png
run56_MG_ToF_04h15.png
Attachment 6: run56_TAC_04h15.png
run56_TAC_04h15.png
Attachment 7: run56_MM_RawX_04h10.png
run56_MM_RawX_04h10.png
Attachment 8: run56_MM_RawY_04h10.png
run56_MM_RawY_04h10.png
Attachment 9: run56_MM_TX_04h10.png
run56_MM_TX_04h10.png
Attachment 10: run56_MM_TY_04h11.png
run56_MM_TY_04h11.png
Attachment 11: run56_FSC_04h12.png
run56_FSC_04h12.png
Attachment 12: run56_VAMOS_MW_04h20.png
run56_VAMOS_MW_04h20.png
Attachment 13: run56_MM_IMPACT_MATRIX_04h20.png
run56_MM_IMPACT_MATRIX_04h20.png
Attachment 14: run56_ELab_ThetaLab_04h10.png
run56_ELab_ThetaLab_04h10.png
Fixede793s Fri Mar 12 06:23:44 2021 Taras, Nishu, Chloe, CharlieRUNGeneralCD2run56 screenshots at 06h15
Screenshots attached
Attachment 1: run56_Scalers_06h14.png
run56_Scalers_06h14.png
Attachment 2: run56_MG-IMPACT_MATRIX_06h15.png
run56_MG-IMPACT_MATRIX_06h15.png
Attachment 3: run56_MM_ToF_06h15.png
run56_MM_ToF_06h15.png
Attachment 4: run56_MM_DeE_06h15.png
run56_MM_DeE_06h15.png
Attachment 5: run56_MG_ToF_06h15.png
run56_MG_ToF_06h15.png
Attachment 6: run56_TAC_06h15.png
run56_TAC_06h15.png
Attachment 7: run56_FSC_06h12.png
run56_FSC_06h12.png
Attachment 8: run56_VAMOS_MW_06h20.png
run56_VAMOS_MW_06h20.png
Attachment 9: run56_MM_IMPACT_MATRIX_06h20.png
run56_MM_IMPACT_MATRIX_06h20.png
Attachment 10: run56_ELab_ThetaLab_06h10.png
run56_ELab_ThetaLab_06h10.png
Fixede793s Fri Mar 12 08:58:09 2021 AdrienBEAMHardwareCD2Beam is stopped 8h55
Beam stopped to fix a leak on the accelerator. Intervention up to 4hours, maybe less.
Fixede793s Fri Mar 12 09:52:01 2021 mugast (Sarah, Louis)OFFLINEGeneralCD2Offline analysis run up to 56 8am
1) A high energy gamma has been identified at 3505 keV by gating on 3-5 MeV range in excitation energy. This transition is unknown so far

2) preliminary angular distribution has been extracted for the p states(<1MeV) and the f states (3-5MeV) corrected from geometrical efficiency. Angular distribution with gate on the 3.5 MeV gamma was also extracted. Too few statistics to tell anything. Need at least 4 time more statistics to have a proper angular distribution.
Attachment 1: AngDisrtib.png
AngDisrtib.png
Attachment 2: 3MeV_gamma.png
3MeV_gamma.png
Attachment 3: AWBA.png
AWBA.png
Fixede793s Fri Mar 12 09:55:30 2021 FrancoGRITGeneralCD2MM5
The first plot attached has been done by artificially removing 7 deg in theta lab, just to see if the the kinematic lines of 47K(d,d) and 47K(p,p) can be reproduced. Of course the energy losses are not optimized in this case but anyway the agreement seems nice.
In the second plot I moved MM5 forward (in z) by 17.5 mm, without any re-orientation in x and y. We should compare this position with the one measured by the surveyors.
It looks like we have plenty of protons in the target but actually the Rutherford cross section at 80 deg for (p,p) is 4 times higher than the (d,d) one. From a quick estimation the ratio 2H:1H in the target should be around 3:1 (to be checked!).
Attachment 1: square_shifted_theta.png
square_shifted_theta.png
Attachment 2: square_shifted_Z.png
square_shifted_Z.png
Fixede793s Fri Mar 12 10:32:41 2021 OttoRunRUNGeneralCD2Run57
*************************
Run : 57
*************************

Start at 2021-03-12 10:32:22.121271

Test run. ACQ DT

(ATC6 crystal stopped)
New beam tune with better centering from Bertrand

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-12 11:12:37.613523
Stop comment: type your message here
Fixede793s Fri Mar 12 13:40:59 2021 OttoRunRUNGeneralCD2Run59
*************************
Run : 59
*************************

Start at 2021-03-12 13:40:31.431982

Test run. ACQ DT

(ATC6 crystal stopped)
starting again after beam line reparation of power supply

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-12 13:42:17.319503
Stop comment: stopping daq because agata daq did not start
Fixede793s Fri Mar 12 15:19:35 2021 OttoRunRUNGeneralCD2Run60
*************************
Run : 60
*************************

Start at 2021-03-12 15:19:14.732769

Test run. ACQ DT

ATC6 pos 0 is back
14C is removed
starting again after beam line reparation of power supply

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-12 16:53:37.438208
Stop comment: stop run after tuning of the beam
Fixede793s Fri Mar 12 16:58:43 2021 OttoRunRUNGeneralCD2Run61
*************************
Run : 61
*************************

Start at 2021-03-12 16:57:56.722818

Test run. ACQ DT


starting again after centering the beam on the target

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-13 07:09:09.949615
Stop comment: run 61 stopped to fix AGATA acquisition problem
Fixede793s Fri Mar 12 18:42:51 2021 Sarah, LouisBEAMGeneralCD2Beam Back
The beam is back at 18h40
The beam stopped due to source problems, going up steadily, currently at ~2e5 pps
Fixede793s Fri Mar 12 19:15:19 2021 Charlie, Nigel (watched by Wilton)RUNGeneralCD2Beam alignment tuning
During part of run #61, Nigel tuned the beam alignment (using the MUST2 hit pattern as the diagnostic). The beam had shifted after the restarting of the ISOL TIS. The beam came back at around 18:30 and tuning finished at 19:15.

** Disregard the data from this run between ~17:15 (beam lost) and 19:15 (tuning finished).

The run should be OK after 19:15.

** Don't tell Bertrand that Nigel used the d*p*le ...
Fixede793s Fri Mar 12 20:43:38 2021 Cyril, LouisOFFLINEGeneralCD2DWBA
DBWA analysis have been performed with TWOFNR, here the comparison with data for the 0, 2 and 4 MeV peaks.
1p1/2 (black line) and 0f7/2 (red line)
Attachment 1: DWBA.png
DWBA.png
Attachment 2: DWBA2.png
DWBA2.png
Fixede793s Fri Mar 12 20:54:30 2021 mugastRUNGeneralCD2summary of run 61
Attachment 1: scalers.png
scalers.png
Attachment 2: vamos.png
vamos.png
Attachment 3: Screenshot_from_2021-03-12_20-57-53.png
Screenshot_from_2021-03-12_20-57-53.png
Attachment 4: Screenshot_from_2021-03-12_20-58-15.png
Screenshot_from_2021-03-12_20-58-15.png
Attachment 5: Screenshot_from_2021-03-12_20-58-45.png
Screenshot_from_2021-03-12_20-58-45.png
Fixede793s Fri Mar 12 22:03:31 2021 Nishu, GiBVAMOSHardwareCD2 VAMOS tripped @ ~ 21:00
Back to normal around 22:00 after restarting HV 5 to 11 (except 10 which was still on)
Attachment 1: Screenshot_from_2021-03-12_22-07-22.png
Screenshot_from_2021-03-12_22-07-22.png
Fixede793s Fri Mar 12 22:26:55 2021 julien, nishuVAMOSHardwareCD2VAMOS tripped @ ~ 22:24
back again to normal,
Fixede793s Fri Mar 12 22:31:46 2021 julien, nishuVAMOSHardwareCD2VAMOS tripped @ ~ 22:24 ans again ~ 22:45
back again to normal after restarting the HV
(22:39)
Attachment 1: vamos_nc.png
vamos_nc.png
Attachment 2: Screenshot_from_2021-03-12_22-33-47.png
Screenshot_from_2021-03-12_22-33-47.png
Attachment 3: Screenshot_from_2021-03-12_22-47-38.png
Screenshot_from_2021-03-12_22-47-38.png
Fixede793s Fri Mar 12 23:16:16 2021 julien, nishuRUNHardwareCD2vamos count rate goes down to 0 once again
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:.
Attachment 1: IMG20210312231358.jpg
IMG20210312231358.jpg
Attachment 2: IMG20210312230429.jpg
IMG20210312230429.jpg
Fixede793s Fri Mar 12 23:27:58 2021 julien, nishuRUNGeneralCD2summary of run 61
below attached the screenshots of scalers and spectra
Attachment 1: Screenshot_from_2021-03-12_23-31-23.png
Screenshot_from_2021-03-12_23-31-23.png
Attachment 2: Screenshot_from_2021-03-12_23-31-07.png
Screenshot_from_2021-03-12_23-31-07.png
Attachment 3: Screenshot_from_2021-03-12_23-30-43.png
Screenshot_from_2021-03-12_23-30-43.png
Attachment 4: Screenshot_from_2021-03-12_23-30-22.png
Screenshot_from_2021-03-12_23-30-22.png
Attachment 5: Screenshot_from_2021-03-12_23-29-52.png
Screenshot_from_2021-03-12_23-29-52.png
Fixede793s Fri Mar 12 23:54:52 2021 julien, nishu, FaïrouzVAMOSHardwareCD2Vamos tripped @ 23h35 & fixed
Fixede793s Sat Mar 13 01:41:21 2021 Juan Lois & faïrouzRUNGeneralCD2run61 screenshots at 1h40
Attachment 1: run61_TAC_01h35.png
run61_TAC_01h35.png
Attachment 2: run61_MG_ToF_01h35.png
run61_MG_ToF_01h35.png
Attachment 3: run61_MM_DeE_01h35.png
run61_MM_DeE_01h35.png
Attachment 4: run61_MM_ToF_01h35.png
run61_MM_ToF_01h35.png
Attachment 5: run61_MG_IMPACT_MATRIX_01h35.png
run61_MG_IMPACT_MATRIX_01h35.png
Attachment 6: run61_Vamos-MW_01h35.png
run61_Vamos-MW_01h35.png
Attachment 7: run61_MM_IMPACT_MATRIX_01h35.png
run61_MM_IMPACT_MATRIX_01h35.png
Attachment 8: run61_Scalers_01h34.png
run61_Scalers_01h34.png

ELOG Home Page