MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 109 of 132  Not logged in MUGAST
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede768s Mon Jul 15 14:29:47 2019 MarlèneMUST2General Masks for MUST2 & Kapton changed for MG5
Masks are now correctly mounted

All 4 kaptons from MG5 have been changed
Attachment 1: IMG_20190715_121646_crop_flip.jpg
IMG_20190715_121646_crop_flip.jpg
Attachment 2: IMG_20190715_122035.jpg
IMG_20190715_122035.jpg
Fixede768s Thu Jul 18 11:52:59 2019 MarlèneOTHERHardwareN/ADivision of SQUARE & MUST2

MUST2 DIV is now 10 (input 7 of GMT)

The OR of the squares is divided by 10 and goes to channel 9 of GMT.
Fixede768s Sun Jul 21 14:54:28 2019 MarlèneRUNGeneral run 119 scalers
Attachment 1: run_119_scaler_beam2.png
run_119_scaler_beam2.png
Attachment 2: run_119_scaler_beam.png
run_119_scaler_beam.png
Fixede768s Sun Jul 21 16:42:20 2019 MarlèneOFFLINEGeneral Conversion of data from AGATA :update
When VAMOS VXI crashed (run 118) the Action file was recompiled.
As AGATA conversion is not copying the ACTION file for each run, it used the old version by default (from 16th of july).

We have modified the do_global_replay.sh so that it takes the ACTION file from the Replay directory where we have copied the ACTION file for run_0119.

So for conversion of file before run 119, the ACTION file in the zworkingDir of AGATA should be used.
For all conversion of runs after run 119, the ACTION file in the Replay directory should be used.
Fixede768s Sun Jul 21 17:02:25 2019 MarlèneBEAMGeneral beam intensity in the afternoon
Attachment 1: run_119_scaler3.png
run_119_scaler3.png
Fixede768s Tue Jul 23 16:19:14 2019 MarlèneOTHERHardware VAMOS division
VAMOS division was set 10 instead of 100.
CATS 1 & CATS2 scalers are sent to the two last channels of the scaler
FixedTEST Wed Dec 4 19:19:38 2019 MarlèneGRITHardware Modifications of set-up
We have installed the new MUFEE board in the reaction chamber for MG2. This board is a new version with ATHED.

We have moved the MG9 board to become the board to read the future MUST2 detector at 90 deg. This board is now perpendicular to the other ones. We have tested the kaptons connection to the detector and the placement of the detector.
The design will be refined on monday with Patrice.

The board that was reading MG10 is now used for MG6.

Every board has been tested again with pulser under vacuum. Everything seems OK.
PendingTEST Tue Jan 21 17:55:12 2020 MarlèneMUST2Hardware Ovv error on the -5V of CAEN boards
The Ovv error shows on the -5V (first one) of the 3 board (5,3.3,10V for MUST2§squares)
It means that the voltage is over the asked value.
If we ask 5V, we get 5.5V in reality

We changed for 4.5V and we get 5V. The current is different from the one on the MUGAST BT box but we don't know how many detectors are connected.
We exchanged cables and found the same current in the other board, so we guess that it is still working properly.
A check of stability should be done.
Attachment 1: BT_referenve_5V_cables_inv_a_comp_referenve_5V_partMUST2
Attachment 2: BT_referenve_5V_partMUST2_cables_inv_a_comp_referenve_5V
Attachment 3: BT_referenve_5V_partMUST2
Attachment 4: BT_referenve_5V
FixedTEST Wed Jan 22 15:53:25 2020 MarlèneGRITHardware Changes for MUGAST2020
Changes were made for MUGAST 2020 :
1- the board for MG10 before (2nd square) is now for MG6 new trap
2- the board for MG9 is put vertical and used for the MUST2 at 90 deg
3- a new board has been installed for MG2

Now there will be 13 detectors in the chamber: 7 trap + 1 square + 4 MUST2 forward.
FixedTEST Sun Feb 23 20:50:06 2020 MarlèneGRITGeneral RUN 115
Screenshots from MUGAST

The impact matrix looks fine but there are sectors missing but in the raw we see 13 sectors (instead of 16)

There E-Tof spectra missing because TY is either not working but we checked that TX is working --> TX should be used for MG2, MG5 and MG6
The ToF seems to have 2 components : one when MUGAST has triggered and one when Vamos has triggered.
We see alpha contribution that come from fusino-evaporation on Au that can go up to 120 deg backward.

We put the BT and HT screenshots as a reference

The cooling is at 0 degree.... there is not much alcohol left in the cooler, we will refill tonight.
Attachment 1: e775s_impact_matrix.png
e775s_impact_matrix.png
Attachment 2: MG_TOF.png
MG_TOF.png
Attachment 3: MG_TX_raw.png
MG_TX_raw.png
Attachment 4: MG_TY_raw.png
MG_TY_raw.png
Attachment 5: BT_MG1.png
BT_MG1.png
Attachment 6: HT_MG.png
HT_MG.png
Attachment 7: MG_BT2.png
MG_BT2.png
Attachment 8: TAC.png
TAC.png
FixedTEST Mon Feb 24 10:26:29 2020 MarlèneGRITGeneral infos
We have changed the range of the TAC FAG-HF to 500ns (it was 200 ns before)

there is no delay on the STOP of MUVI, it is directly the HF clean.

The inspection lines of MUVI1 are sent to vamos acquisition room.
Fixede775s Wed Feb 26 15:02:38 2020 MarlèneRUNGeneral RUN 137
RUN 137
CD2+Au #2
beam intensity 6e+5pps

beam was retuned during the night, seems to be degraded although intensity is higher.
Attachment 1: Ex_137.pdf
Ex_137.pdf
Attachment 2: Ex_run128_137.pdf
Ex_run128_137.pdf
Fixede775s Wed Feb 26 15:12:02 2020 MarlèneRUNGeneral RUN 137
Screenshots of RUN137


Marlène wrote:
RUN 137
CD2+Au #2
beam intensity 6e+5pps

beam was retuned during the night, seems to be degraded although intensity is higher.
Attachment 1: MG_ElabThetaLab_run137.png
MG_ElabThetaLab_run137.png
Attachment 2: MG_YT.png
MG_YT.png
Attachment 3: MG_XT.png
MG_XT.png
Attachment 4: MG_YE.png
MG_YE.png
Attachment 5: MG_XE_run137.png
MG_XE_run137.png
Attachment 6: Tac_run137.png
Tac_run137.png
Attachment 7: impact_MG_run137.png
impact_MG_run137.png
Attachment 8: ToF_MUGAST.png
ToF_MUGAST.png
Fixede775s Wed Feb 26 16:19:35 2020 MarlèneRUNGeneral RUN 137 (suite)
Here is the E gamma versus Excitation energy spectra for run 137



Marlène wrote:
RUN 137
CD2+Au #2
beam intensity 6e+5pps

beam was retuned during the night, seems to be degraded although intensity is higher.
Attachment 1: Ex_Egamma_run137.png
Ex_Egamma_run137.png
Fixed  Thu Feb 27 15:56:09 2020 MarlèneRUNGeneral RUN 142 AGATA- 143 VAMOS-MUGAST
RUN142 on AGATA and RUN143 on MUGAST/VAMOS

target CD2 (350ug/cm2)
Trigger MUGAST
Beam intensity : 5e+5pps



!!!! there is a shift in the run number on AGATA with respect to VAMOS/MUGAST
Fixed  Thu Feb 27 16:25:45 2020 MarlèneRUNGeneral RUN 142-143 screenshots

Marlène wrote:
RUN142 on AGATA and RUN143 on MUGAST/VAMOS

target CD2 (350ug/cm2)
Trigger MUGAST
Beam intensity : 5e+5pps



!!!! there is a shift in the run number on AGATA with respect to VAMOS/MUGAST
Attachment 1: RUN143_ElabThetaLab.png
RUN143_ElabThetaLab.png
Attachment 2: RUN143_impact.png
RUN143_impact.png
Attachment 3: RUN143_tac.png
RUN143_tac.png
Attachment 4: RUN143_tof.png
RUN143_tof.png
Fixed  Thu Feb 27 16:30:53 2020 MarlèneRUNGeneral RUN 142 -143 preliminary analysis

Marlène wrote:

Marlène wrote:
RUN142 on AGATA and RUN143 on MUGAST/VAMOS

target CD2 (350ug/cm2)
Trigger MUGAST
Beam intensity : 5e+5pps



!!!! there is a shift in the run number on AGATA with respect to VAMOS/MUGAST
Attachment 1: RUN143_ana_Elab_Thetalab.png
RUN143_ana_Elab_Thetalab.png
Attachment 2: RUN143_ana_Ex_Eg.png
RUN143_ana_Ex_Eg.png
Attachment 3: RUN143_ana_Ex.png
RUN143_ana_Ex.png
Fixed  Fri Feb 28 11:20:22 2020 MarlèneGRITGeneral RUN 150
RUN 150
target CD2 300 ug/cm2
Beam intensity 4e+5pps

Note that there is no 144,145,146,147, 148 ans 149 runs
Fixede775s Fri Feb 28 11:21:31 2020 MarlèneRUNGeneral RUN 151
RUN 151

Change of target now : CD2+AU #2
Beam intensity : 4e+5pps
Fixede775s Fri Feb 28 14:00:08 2020 MarlèneRUNGeneral RUN 151 beam stop

Marlène wrote:
RUN 151

Change of target now : CD2+AU #2
Beam intensity : 4e+5pps



beam stopped due to unstable equipment in CSS1.
expected duration : 15 min

ELOG Home Page