    Fixed, e775s, Thu Feb 27 10:03:03 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 - minutes of what happened during the run 
Here is a brief summary of what happened over the course of the run:

From beginning of run to 12 pm (February 27th)



Nicolas, Sylvain, Antoine, Adrien wrote:
Start at 09h50 (Feb. 27th)
Stop at

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
Fixed, e775s, Wed Feb 26 20:41:21 2020, Nicolas, Sylvain, RUN, General, , run 138 
Start at 15h45 (Feb. 26th)
Stop at 09h48 (Feb. 27th)

Beam: 19O
Intensity: 4e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Wed Feb 26 20:45:14 2020, Nicolas, Sylvain, RUN, General, , run 138 - minutes of what happened during the run 
Here is a brief summary of what happened over the course of the run:

From 4 pm to 12 pm (February 26th)
1. 20h00: call PCP because beam intensity decreased smoothly from 4e5 pps (16h) to 3e5 pps (20h) -> back to 3.5e5 pps
2. 20h25: call PCP because of sudden drop of intensity. VAMOS PF bias OK and beam OK according to PCP. Beam came back alone up to 3.2e5 pps with relaxation time of qbout 10 min as if some element was rumping up.
3. 23h50: FP_CATS tripped

From 12 pm to 8 am (February 27th)
Stable beam intensity at around 3.1e5 pps with VAMOS FP HV tripping 4 times

From 8 am to end of run (February 27th)
1. 08h05: FP_CATS0..5 tripped
2. 08h50: FP_CATS0..5 tripped


Nicolas, Sylvain wrote:
Start at 15h45
Stop at

Beam: 19O
Intensity: 4e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Wed Feb 26 21:57:05 2020, Nicolas, Sylvain, RUN, General, , run 138 screenshots1 RUN138_scalers.pngRUN138_ThetaLab_ELab.pngRUN138_impact.pngRUN138_TAC.pngRUN138_ToF.png

Nicolas, Sylvain wrote:
Start at 15h45
Stop at

Beam: 19O
Intensity: 4e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Thu Feb 27 08:21:19 2020, Nicolas, Sylvain, RUN, General, , run 138 - Beam intensity time evolution BeamIntensityProfile.pngBeamIntensityProfileNight.png

Nicolas, Sylvain wrote:
Start at 15h45
Stop at

Beam: 19O
Intensity: 4e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Thu Feb 27 08:38:05 2020, Nicolas, Sylvain, OFFLINE, General, , run 138 - analysis Ex-run138-2020-02-27_08-19-27.pngRUN138_Ex.pngRUN138_ExEg.png

Nicolas, Sylvain wrote:
Start at 15h45
Stop at

Beam: 19O
Intensity: 4e5 pps

Target; CD2 + Au #2
    Fixed, e793s, Thu Mar 11 12:39:01 2021, Nicolas, Lynda, Charlie, Sarah, RUN, General, CD2, run 56 screenshots 7x
    Fixed, e793s, Thu Mar 11 15:26:37 2021, Nicolas, Lynda, Charlie, Sarah, RUN, General, CD2, run 56 screenshots 15h30 8x
online histograms reset around 15h45
    Fixed, e793s, Thu Mar 11 09:17:17 2021, Nicolas, Lynda, Charlie, RUN, General, CD2, run 53 new screenshots 7x
Fixed, e793s, Thu Mar 11 10:25:30 2021, Nicolas, Lynda, Charlie, RUN, General, CD2, run 55 screenshots run54_start_Scalers.png
Start of run, so scaler only - low stats in vigru plots
Fixed, e793s, Thu Mar 11 11:20:35 2021, Nicolas, Lynda, Charlie, BEAM, General, CD2, End of run 55 run54_MM_impact_matrx.png
MM impact matrix after tuning to center the beam by Bertrand
Ongoing, e793s, Thu Mar 11 11:27:28 2021, Nicolas, Lynda, Charlie, RUN, General, CD2, run 56 screenshots run56_scalar_start.png
Scaler only
Fixed, e775s, Thu Feb 27 11:51:34 2020, Nicolas Sylvain Marlène, RUN, General, , run 139 
Start at 09h51 (Feb. 27th)
Stop at 11h22 (Feb. 27th)

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2
    Fixed, e775s, Thu Feb 27 16:36:25 2020, Nicolas Sylvain Marlène, RUN, General, , run 139 

Nicolas Sylvain Marlène wrote:
Start at 09h51 (Feb. 27th)
Stop at 11h22 (Feb. 27th)

Beam: 19O
Intensity: 3e5 pps

Target; CD2 + Au #2



temperature on MUFEE was checked to be between 0 and 12 degress depending on the boards.
The current of the detectors are stable.
    Fixed, e775s, Tue Feb 25 10:04:33 2020, Nicolas Freddy Adrien, ONLINE, General, CD2, Screenshots run 128  run128_Ex.pngrun128_MG_ETOF_allStat.pngrun128_Ex_timecut.pngrun128_ExEgamma.png
All stat for run 128.

Excitation energy shows expected 20O levels (when compared to plain CD2 target) on top of a huge gold induced background.

Putting a gate on the time between the multiwire of VAMOS and the HF, abs(T_FPMW_HF-13000)<1000, we obtain the clean black spectrum in the third attachment.
Fixed, e768s, Wed Jul 31 23:06:04 2019, Nicolas & Fairouz, OTHER, General, , screenshot fsc fsc_OneChannelPerMate.png
Fixed, com2019, Sat Apr 6 10:57:35 2019, Nicolas, OFFLINE, Software, CD2, time of flight v.s. energy in MUGAST (run 256, all stat) ToF_dE_MUGAST_run256_all_stat.pdf
Fixed, e768s, Fri Jul 19 17:33:21 2019, Nicolas, OTHER, General, , AGATA: what if a crystal status get red 
1. Go to the AGATA Digitizer: Control tab of the browser
2. Select the detector and crystal, then click 'Select'
3. Click the 'ReSync Current Digitizer Optical Link'

Normally it should go green again, otherwise call AGATA people
Fixed, e768s, Fri Jul 19 17:52:24 2019, Nicolas, OTHER, General, , AGATA: replaying runs 
1. Go to the AGATA analysis computer, open a terminal and execute the following commands:
> a4
> t e768s
> cd Replay
> ./do_global_replay.sh -run ### (### is the run number you want to convert)
if it complains that the folder with the run already exists, just > rm -rf runXXXX/ (where XXXX is the run you're replaying) in the Replay folder

2. When it is finished copy the root file to the GANIL world:
> mkdir /dataganil/e768s/acquisition/root_agata/run_0###
> cp ./run_0###/Out/Analysis/Tree_00*.root /dataganil/e768s/acquisition/run_0###
Fixed, e768s, Sat Jul 20 14:32:18 2019, Nicolas, BEAM, General, LiF, Beam profile & intensity (run 117 @ 14h30) IMG_20190720_142852.jpg
Beam intensity: 1.4e7 pps
VAMOS: ~ 1200