Fixed, e744s, Mon Apr 15 08:34:36 2019, Nikola Marion Kseniia Damien Chloe Marlene Fairouz, ONLINE, Social, CH2, Log & Scalers -- Run 125 at 08:35
|
|
Fixed, e744s, Mon Apr 15 08:45:05 2019, Nikola Marion Kseniia Damien Chloe Marlene Fairouz, ONLINE, Social, CH2, Log & Scalers -- Run 125 at 08:40 21x
|
Spectra reset 8:50 |
Fixed, e744s, Mon Apr 15 09:36:01 2019, Nikola Marion Kseniia Damien Chloe Marlene Fairouz, RUN, General, CH2, Run 125 stopped 9:30 to go back to on-resonance config
|
|
Fixed, e744s, Mon Apr 15 10:42:39 2019, Nikola Marion Kseniia Damien Chloe Marlene Fairouz, ONLINE, Social, CH2, Log & Scalers -- Run 126 at 10:40 21x
|
spectra reset at 10:45 |
Fixed, e744s, Mon Apr 15 13:22:56 2019, Nikola Faïrouz Damien Ksenia, RUN, General, CH2, Scalers Run 128 21x
|
Run 128, same conditions then run 126 |
Fixed, e744s, Mon Apr 15 13:28:25 2019, Nikola Faïrouz Damien Ksenia, RUN, General, CH2, Beam intensity increased to 1.8e5 pps
|
|
Fixed, e744s, Sun Apr 14 08:41:52 2019, Nikola Dieter Nicolas Beyhan Kseniia, ONLINE, Social, CH2, Log & Scalers -- Run 122 at 08:40 20x
|
Spectra zeroed after screenshot taking |
Fixed, e744s, Sun Apr 14 11:12:57 2019, Nikola Dieter Nicolas Beyhan Kseniia, ONLINE, General, CH2, Log & Scalers -- Run 122 at 11:10 20x
|
Spectra reset |
Fixed, e744s, Sun Apr 14 12:17:53 2019, Nikola Dieter Nicolas Beyhan Kseniia, ONLINE, General, CH2, Log & Scalers -- Run 122 at 12:20 20x
|
Spectra have been cleared after the screenshots were taken |
Fixed, e744s, Sun Apr 14 14:23:15 2019, Nikola Dieter Nicolas Beyhan Kseniia, ONLINE, General, CH2, Count rates    
|
|
Fixed, e744s, Sun Apr 14 15:04:39 2019, Nikola Dieter Nicolas Beyhan Kseniia, ONLINE, Social, CH2, Log & Scalers -- Run 122 at 15:04 end of run 20x
|
|
Fixed, e744s, Sun Apr 14 15:26:48 2019, Nikola Dieter Nicolas Beyhan Kseniia, VAMOS, Hardware, CH2, New thresholds values for DC0 and DC3
|
Thresholds are lowered from 4V to 2V for DC0
Thresholds are lowered from 6V to 4V for DC3 |
Fixed, e768s, Sat Jul 20 08:01:06 2019, Nikola, ONLINE, General, , screenshots run 116 @ 08h00 22x
|
|
Fixed, e768s, Sat Jul 20 09:20:35 2019, Nikola, ONLINE, General, , screenshots run 116 @ 09h20 22x
|
|
Fixed, e768s, Sat Jul 20 10:50:01 2019, Nikola, ONLINE, General, , End of run 116 (beam problem) -> screenshots run 116 end @ 10h40 22x
|
1. A monitor of the primary beam failed and the astreinte had to be call (PCP did it).
2. The H2O cold box went in default. The cold water for AGATA digitizer; vamos crates and CTA went up to 25 deg!
Reset..... waiting that it goes back to 17deg in the cave circuit |
Fixed, e768s, Sat Jul 20 14:21:22 2019, Nikola, ONLINE, General, , screenshots run 117 @ 14h20 22x
|
|
Pending, e793s, Wed Mar 10 20:36:19 2021, Nigel, BEAM, General, CD2, Beam centering - MUST2 hit pattern
|
We made a quick check of the beam centering by inspecting the MUST2 (forward angles) hit pattern (plot attached). It appears that the beam is probably somewhat off centre in the horizontal direction.
It has been decided to run overnight like this and then see with Bertrand if the centering can be improved (will need to send hit pattern spectrum to PCP in order for Bertam to do this).
 |
Fixed, e775s, Thu Feb 27 09:54:17 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139
|
Start at 09h50 (Feb. 27th)
Stop at
Beam: 19O
Intensity: 3e5 pps
Target; CD2 + Au #2 |
Fixed, e775s, Thu Feb 27 09:56:19 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 - analysis
|
Nicolas, Sylvain, Antoine, Adrien wrote: | Start at 09h50 (Feb. 27th)
Stop at
Beam: 19O
Intensity: 3e5 pps
Target; CD2 + Au #2 |
|
Fixed, e775s, Thu Feb 27 09:56:39 2020, Nicolas, Sylvain, Antoine, Adrien, RUN, General, , run 139 - Beam intensity time evolution
|
Nicolas, Sylvain, Antoine, Adrien wrote: | Start at 09h50 (Feb. 27th)
Stop at
Beam: 19O
Intensity: 3e5 pps
Target; CD2 + Au #2 |
|
|