MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 102 of 132  Not logged in MUGAST
    Fixed, e768s, Sat Jul 20 12:57:41 2019, Christian, OTHER, General, , Previous Papers - gamma decays from states in the 4-MeV region 1904.00603.pdf
2019 paper by Hall, Bardayan, et al., gamma decays of 4.14 and 4.20 states, g-g-t triple coincidences.

Abstract:
Fixed, e768s, Sat Jul 20 14:00:22 2019, OttoRun, RUN, General, LiF, Run117 
*************************
  [SIZE=3][B]Run  : 117[/B][/SIZE]
*************************
Fixed, e768s, Sat Jul 20 14:21:22 2019, Nikola, ONLINE, General, , screenshots run 117 @ 14h20 22x
 
Fixed, e768s, Sat Jul 20 14:32:18 2019, Nicolas, BEAM, General, LiF, Beam profile & intensity (run 117 @ 14h30) IMG_20190720_142852.jpg
Beam intensity: 1.4e7 pps
VAMOS: ~ 1200
Fixed, e768s, Sat Jul 20 17:00:19 2019, OttoRun, RUN, General, LiF, Run118 
*************************
  [SIZE=3][B]Run  : 118[/B][/SIZE]
*************************
Fixed, e768s, Sat Jul 20 17:03:23 2019, mugast, RUN, General, LiF, Run 117 stopped 
Run 117 stopped because VAMOS VXI went offline
Fixed, e768s, Sat Jul 20 17:06:12 2019, mugast, RUN, General, LiF, Run 118 Scaler scaler_run118_1.png
Start run 118 
Fixed, e768s, Sat Jul 20 19:12:58 2019, Faïrouz & Sylvain, RUN, General, LiF, Run 118 screenshots @ 19h14 20x
 
Fixed, e768s, Sat Jul 20 19:21:56 2019, Marlene, Nicolas, Christian, Fairouz, OFFLINE, General, , Trying to understand AGATA g-ray yields 
goal: we want to check whether the yields of the 1297.7 keV (from 19Ne 1536, 3/2+, l=1 state) and 1340 keV (from 19Ne 1615, 3/2-, l=2 state) g-ray lines
is compatible with what we expect from x-sec calculations
    Fixed, e768s, Sat Jul 20 19:23:37 2019, Christiqn, OFFLINE, General, LiF, Ex in 19F from run 72  

[B]Data: Total integral for peak region around 4 MeV in 19F during run 72:
[/B]
Fixed, e768s, Sat Jul 20 19:24:31 2019, Faïrouz & Sylvain, RUN, General, LiF, Beam intensity is decreasing.  
The beam intensity decreased by half since 19h00 (600 in Vamos-or)due to the primary beam. 
The operators are working on it since. 
The intensity of 10^7 pps came back at 8 pm. 
Fixed, e768s, Sat Jul 20 21:10:57 2019, Faïrouz & Sylvain, RUN, General, LiF, Run 118 stopped because VXI Vamos turned offline because of overheat  
Run 118 stopped because VXI Vamos turned offline of overheat
Fixed, e768s, Sat Jul 20 23:18:02 2019, OttoRun, RUN, General, LiF, Run119 
*************************
  [SIZE=3][B]Run  : 119[/B][/SIZE]
*************************
    Fixed, e768s, Sat Jul 20 23:32:44 2019, Sylvain Fairouz, OFFLINE, General, , Trying to understand AGATA g-ray yields 
[quote="Marlene, Nicolas, Christian, Fairouz"]goal: we want to check whether the yields of the 1297.7 keV (from 19Ne 1536, 3/2+, l=1 state) and 1340 keV
(from 19Ne 1615, 3/2-, l=2 state) g-ray lines is compatible with what we expect from x-sec calculations
Fixed, e768s, Sat Jul 20 23:43:02 2019, mugast, RUN, General, LiF, Run 119 (Problem with VXI fixed for the moment)  scaler_run119_1.png
Run 119.
Or-Vamos= 1430 ---> I=1.43x10^7 pps
Fixed, e768s, Sat Jul 20 23:57:34 2019, Diego, OFFLINE, General, , VAMOS acceptance, comparison between 9+ and 10+ states VAMOS_acceptance.png
Figures above, simulation of VAMOS acceptance for 10+ and 9+ 19Ne charge states. Ratio between them quite big (0.58)
Figures below, comparison of the states with offline data. Ratio much smaller.
It seems like acceptance doesn't cut the 10+ charge state too much, but 10+ is less produced than 9+.
Fixed, e768s, Sun Jul 21 01:57:59 2019, Jenn & Franck, ONLINE, General, LiF, Screenshots run 119 21x
 
Fixed, e768s, Sun Jul 21 04:48:52 2019, Jenn & Franck, BEAM, General, N/A, Beam intensity check 
OR Vamos: 1300 /s
Vamos gas profiler: 1.7x10^7 pps
    Fixed, e768s, Sun Jul 21 09:10:50 2019, Didier & Nicolas, BEAM, General, N/A, Beam intensity check IMG_20190721_090616_beamcheck.jpg
[quote="Jenn & Franck"]OR Vamos: 1300 /s
Vamos gas profiler: 1.7x10^7 pps[/quote]
Fixed, e768s, Sun Jul 21 10:58:39 2019, Christian, AGATA, General, LiF, 13c resync 
13c resync at 10.57
lost 5 min agata data

ELOG Home Page