MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST  Not logged in MUGAST
Entry  Tue Jul 30 01:20:21 2019, Jenn & Franco, e768s, BEAM, General, Fixed, LiF, Beam intensity, profile check and SUMMARY night photo_2019-07-30_00-19-19.jpgscaler_4.pngcorrelation.png
    Reply  Tue Jul 30 04:25:49 2019, Jenn & Franco & Teodora, e768s, BEAM, General, Fixed, LiF, Beam intensity, profile check and SUMMARY night IMG_20190730_042215.jpg
Message ID: 5430     Entry time: Tue Jul 30 01:20:21 2019     Reply to this: 5434
Author: Jenn & Franco 
ExpNbr: e768s 
Type: BEAM 
Category: General 
Status: Fixed 
Target-Source: LiF 
Subject: Beam intensity, profile check and SUMMARY night 
In run 158 at around 01:00am PCP took the beam to try to optimize it. We got the beam back after ~15 minutes.

Beam intensity ~1.2e7
OR MUGAST ~ 160
OR VAMOS ~ 650

30 minutes later: comparing the actual beam profile with the previous ones it looks like the beam has shifted on the horizontal axis (before the centroid was -1.9, now it is -3.4).
At the same time we noticed an increase in the AGATA counting rate (~ 35k). AGATA itself is not very stable, each now and then all the detectors go in back pressure for few
seconds and then they come back to the normal status. Moreover we see more counts on the second line in the correlation matrix (see figure attached). We think that maybe
with the last optimization the beam is slightly touching somewhere out of the target.

At 02:15am there was a problem with the vacuum on the PCP side so the beam went off. We wait for a guy to come in ~45min and solve this issue or understand WThell is happening.
RUN 158 won't be stopped to avoid DAQ problems.

TO UNDERSTAND: even after beam stopped 30 min ago, OR Vamos is still counting ~100 Hz while AGATA and MUGAST are counting nothing.
Attachment 1: photo_2019-07-30_00-19-19.jpg  166 kB  Uploaded Tue Jul 30 02:23:01 2019  | Hide | Hide all | Show all
photo_2019-07-30_00-19-19.jpg
Attachment 2: scaler_4.png  75 kB  Uploaded Tue Jul 30 02:24:21 2019  | Show | Hide all | Show all
Attachment 3: correlation.png  40 kB  Uploaded Tue Jul 30 02:51:21 2019  | Hide | Hide all | Show all
correlation.png

ELOG Home Page