MUST2
SAMURAI_2018
S3-LEB-LPC
SUPERNEMO
MUGAST
EXPAND
SCALP
GALATRON
HiCARI
VELO
MUGAST
Not logged in
Back
|
Find
|
Login
Message ID:
18
Entry time:
Thu Feb 21 17:32:42 2019
Author:
iulian, freddy
ExpNbr:
TEST
Type:
GRIT
Category:
Hardware
Status:
Fixed
Target-Source:
3-alpha
Subject:
run 33 3 alfa with MG1,MG3,MG4,MG5,MG7,MG9 short run
First test of the repaired 2xcables. The repaired cables were placed between MUVI1_2 <=> MG4 & MUVI1_4 <=>MG11 (longer cable)
Correspondance for the rest is the same as for run 30. The mapping is the same for all detectors (including anulaire detector).
Alpha source run for trapezoid detectors + anulaire detector with pedestals aligned and zero suppression. Cooling at 15°C.
Thresholds at 500 keV.
On MUVI1:
1--> MG5 (150V)
2--> MG4 (95V)
3--> MG3 (160V)
4--> MG11 (60V)
On MUVI2:
5--> MG7 (120V)
6--> MG1 (140V)
7--> --
8--> --
TRIGGERS are:
GMT ch1 --> OR MUVI1
GMT ch2 --> OR MUVI2
GMT ch3 --> OR MUVI3 (nothing on it)
Attachment 1:
3alpha_sourceMG1MG4MG7MG9XY_run33.png
106 kB
|
Hide
|
Hide all
|
Show all
Attachment 2:
3alpha_sourceMG3MG5XY_run33.png
88 kB
|
Show
|
Hide all
|
Show all
ELOG Home Page